Active in City of Sacramento (5 permits)
Raw permit filing name: 3D TECHNOLOGY SERVICES INC
4 issued · 5 parcels
vs 1 prior 24m
3 construction/remodel
Sum of permit job values
Application → issuance
Latest: Jul 27, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 2 | 1 | — | $1,759,097 | — | 63d (119d p75) | — | |
| 2 | 2 | — | $202,000 | 12d (n=2) | 14d (29d p75) | — | |
| 1 | 1 | — | $115,428 | — | 4d (21d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
345 units · 69 affordable · $83,227,016 · 34 permits
124 units · 122 affordable · $51,962,359 · 26 permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 401 I St City of Sacramento · APN 002-0010-071-0000 | Commercial tenant improvement COM-2616029Portal ↗ | Applied Jul 27, 2026 | Plan Check Wait | $1,734,097 | CITY PROJECT- CDD BUILDING INSPECTED. Scope of work is swapping out low-voltage cables, updating cameras while reusing all existing conduits inside SVS to preserve the historical integrity and on the exterior - updated cables & cameras to outside of the station, along platform, in the pedestrian tunnels and service tunnel. 93 cameras in total {44 indoor,49 outdoor} -adding ballistic film to Amtrak ticket counter & doors and back-office interior windows (avoiding the exterior historic glass), -adding access control and swapping out exterior steel doors in the tunnel, -adding rated bollards that are fixed and removable bollards on the exterior sidewalk to the back of the station and at the entrance to the canopy. 27 bollards in total with 5 of the bollards are removable. -update rack components and replacing the existing fibers & Cat6 cables. Filed as: 3D TECHNOLOGY SERVICES INC |
| 2231 Oxford St City of Sacramento · APN 275-0134-014-0000 | Remodel / interior alteration COM-2605737Portal ↗ | Issued Apr 17, 2026 25d review | Finaled | $115,428 | EXPEDITED - Scope is to provide an Emergency Responder Coverage System that meets State and Local Codes and Requirements. This is accomplished by amplifying the existing outdoor network and distributing the coverage throughout the building using a series of splitters and couplers interconnected with coaxial cable. Main permit under COM-2327198. Filed as: 3D TECHNOLOGY SERVICES INC |
| 2761 Stockton Blvd City of Sacramento · APN 011-0200-079-0000 | Fire alarm / sprinkler COM-2511904Portal ↗ | Issued Jun 23, 2025 14d review | Expired Permit | $187,000 | EPC - TO PROVIDE AN EMERGENCY RESPONDER COMMUNICATIONS ENHANCEMENT SYSTEM THAT MEETS STATE AND LOCAL CODES AND REQUIREMENTS. THIS IS ACCOMPLISHED BY AMPLIFYING THE EXISTING OUTDOOR NETWORK AND DISTRIBUTING THE COVERAGE THROUGHOUT. THE BUILDING USING A SERIES OF SPLITTERS AND COUPLERS INTERCONNECTED WITH COAXIAL CABLE. Filed as: 3D TECHNOLOGY SERVICES INC |
| 2120 K St City of Sacramento · APN 007-0092-009-0000 | Fire alarm / sprinkler COM-2423086Portal ↗ | Issued Oct 31, 2024 10d review | Finaled | $15,000 | EPC - Provide and install a manual / automatic fire alarm system with occupant notification and area smoke coverage in coordination with this project. PROJECT AREA PER ISSUED COM-2401993 IS 4,321 SQ. FT. Filed as: 3D TECHNOLOGY SERVICES INC |
| 251 6th St City of Sacramento · APN 002-0010-069-0000 | Commercial tenant improvement COM-2419209Portal ↗ | Issued Aug 29, 2024 0d review | Finaled | $25,000 | REPLACEMENT PERMIT FOR COM-2219742. A new two-way communication system to be installed in new mixed-use building currently under construction (see COM-1924220, "Railyards Lot 48"). Command center box is mounted 68" to center. Call stations are mounted 48" to center. Area of work totals 1,000 SF (two (2) 100 SF elevator lobbies on 5 floors). Filed as: 3D TECHNOLOGY SERVICES INC |