Active in City of Sacramento (3 permits)
Raw permit filing name: ALVAREZ QUALITY CONSTRUCTION INC
3 issued · 3 parcels
vs 2 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Jan 14, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 3 | 3 | — | $107,430 | 5d (n=3) | 3d (8d p75) | Within typical range |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 77 Goose Haven Ct City of Sacramento · APN 225-1200-031-0000 | Solar / battery storage RES-2526274Portal ↗ | Issued Jan 14, 2026 34d review | Finaled | $50,772 | 14.175kw Solar PV System, 27 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). Filed as: ALVAREZ QUALITY CONSTRUCTION INC |
| 5048 Brimley Way City of Sacramento · APN 225-1510-009-0000 | Solar / battery storage RES-2413108Portal ↗ | Issued Jun 19, 2024 5d review | Finaled | $28,658 | 10.235kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION. Filed as: ALVAREZ QUALITY CONSTRUCTION INC |
| 3595 Wheelhouse Ave City of Sacramento · APN 274-0660-047-0000 | Solar / battery storage RES-2326825Portal ↗ | Issued Dec 20, 2023 2d review | Finaled | $28,000 | 6.48kw Solar PV System, and 0gal Solar WH System (water heater installed null).All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” Filed as: ALVAREZ QUALITY CONSTRUCTION INC |