Active in City of Sacramento (4 permits)
Raw permit filing name: BOON'S HEATING & AIR
4 issued · 3 parcels
vs 0 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Feb 2, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 3 | 3 | — | $29,100 | 0d (n=3) | 0d (0d p75) | Within typical range | |
| 1 | 1 | — | $21,950 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 7923 Hanford Way City of Sacramento · APN 117-0236-011-0000 | HVAC / heat pump RES-2602148Portal ↗ | Issued Feb 2, 2026 0d review | Finaled | $21,950 | Change-out w/new ducts Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: BOON'S HEATING & AIR |
| 120 46th St City of Sacramento · APN 004-0083-007-0000 | Roof replacement RES-2221690Portal ↗ | Issued Oct 11, 2022 0d review | Finaled | $8,940 | No Duct Work Permitted. Change-out Roof Mount to Roof Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Filed as: BOON'S HEATING & AIR |
| 1414 56th St City of Sacramento · APN 008-0353-005-0000 | Roof replacement RES-2008732Portal ↗ | Issued May 26, 2020 0d review | Finaled | $8,910 | No Duct Work Permitted. New install/New location Mini-Split System. A unit will be installed in a new location. This unit will be fully screened behind a solid fence or alternatively behind shrubs or buildings providing screening resulting in the unit not being visible from any street views. Roof top installations will be located on back roof slopes and below ridge lines, and not visible from street views. Filed as: BOON'S HEATING & AIR |
| 120 46th St City of Sacramento · APN 004-0083-007-0000 | Roof replacement RES-1813855Portal ↗ | Issued Jul 20, 2018 0d review | Finaled | $11,250 | REPLACE ROOF MOUNT PACKAGED HVAC UNIT AND 25LF OF DUCTS Change-out w/new ducts Roof Mount to Roof Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314 ***8/1/18 - REVISION - Reduce scope to DUCTWORK ONLY - Existing HVAC appliance repaired and remains in place*** Filed as: BOON'S HEATING & AIR |