Active in City of Sacramento (4 permits)
Raw permit filing name: CARBON ZERO BUILDINGS INC
4 issued · 4 parcels
vs 1 prior 24m
2 construction/remodel
Sum of permit job values
Application → issuance
Latest: May 1, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 2 | 2 | — | $400,000 | 40d (n=2) | 0d (0d p75) | — | |
| 1 | 1 | — | $50,000 | — | 4d (21d p75) | — | |
| 1 | 1 | — | $50,000 | — | 63d (119d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 1431 Q St City of Sacramento · APN 006-0286-026-0000 | HVAC / heat pump COM-2605051Portal ↗ | Issued May 1, 2026 49d review | Finaled | $150,000 | EPC - Replacement of HVAC system within existing multifamily building with heat pump heating/cooling system, with new HBB sub panel. Building B only. Filed as: CARBON ZERO BUILDINGS INC |
| 1400 P St City of Sacramento · APN 006-0286-025-0000 | HVAC / heat pump COM-2516935Portal ↗ | Issued Sep 12, 2025 31d review | Finaled | $250,000 | EPC - Replace gas water heating system in the basement boiler room at existing apartment building A with electric heat pump system. Provide power supply for the central heat pump water heaters, run new power circuits from the house panels to feed the new heat pump station panel board. Filed as: CARBON ZERO BUILDINGS INC |
| 7789 La Mancha Way City of Sacramento · APN 118-0133-010-0000 | Remodel / interior alteration COM-2419163Portal ↗ | Issued Mar 26, 2025 210d review | Finaled | $50,000 | MULTI-FAMILY HOUSING - EPC - The existing domestic hot water gas boiler system will be replaced with an electric heat pump water heating system. Plumbing work will include demolishing the existing boiler system and installing the new heat pump water heating system with the required piping and insulation. Electrical work includes providing infrastructure for the new electric system and low voltage control and monitoring system wiring. REVISION COM-2518699- Update the 3" conduit run with 350kcmil conductors and a #4 ground to parallel 1.5" conduit with 1/0 conductors and a #4 ground. Update the 1.5" conduit on the secondary side from the transformer to SC2 and from there to the HPWH. Eliminate a disconnect as we only need to install DS2 which is directly next to the HPWH. Filed as: CARBON ZERO BUILDINGS INC |
| 5321 Stockton Blvd City of Sacramento · APN 023-0211-025-0000 | Commercial tenant improvement COM-2404280Portal ↗ | Issued May 22, 2024 84d review | Finaled | $50,000 | EPC - 1) Remove existing gas water heating system and provide new heat pump water heating system with buffer tank & electric swing tank. 2) Provide provisional power supply for future electric dryers. 3) Replace existing common-area cooling-only HVAC condensers with heat pump condensers. Filed as: CARBON ZERO BUILDINGS INC |