Active in City of Sacramento (2 permits)
Raw permit filing name: CLARK HEATING AND AIR CONDITIONING
2 issued · 2 parcels
vs 0 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Jun 7, 2017
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 2 | 2 | — | $18,583 | 0d (n=2) | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 22 Crossley Ct City of Sacramento · APN 274-0470-026-0000 | HVAC / heat pump RES-1709717Portal ↗ | Issued Jun 7, 2017 0d review | Expired Permit | $7,800 | Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: CLARK HEATING AND AIR CONDITIONING |
| 2473 American River Dr City of Sacramento · APN 295-0470-005-0000 | HVAC / heat pump RES-1608603Portal ↗ | Issued Jun 2, 2016 0d review | Finaled | $10,783 | 2473 & 2475 -- Change-out 2 Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314 Filed as: CLARK HEATING AND AIR CONDITIONING |