Active in City of Sacramento (8 permits)
Raw permit filing name: COMMUNITY ELECTRIC
7 issued · 5 parcels
vs 2 prior 24m
2 construction/remodel
Sum of permit job values
Application → issuance
Latest: Aug 17, 2023
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 5 | 5 | — | $14,000 | 0d (n=5) | 0d (0d p75) | Within typical range | |
| 2 | 2 | — | $1,580,000 | 108d (n=2) | 63d (119d p75) | — | |
| 1 | 0 | — | — | — | 41d (93d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 109 Commerce Cir 100 City of Sacramento · APN 275-0251-024-0000 | Electrical / panel COM-2315718Portal ↗ | Issued Aug 17, 2023 20d review | Expired Permit | $5,000 | EPC - temp power permit due to nationwide supply shortage Filed as: COMMUNITY ELECTRIC |
| 2859 Belden St City of Sacramento · APN 265-0171-019-0000 | Electrical / panel RES-2304520Portal ↗ | Issued Mar 8, 2023 0d review | Finaled | $4,000 | AA: existing panel 100 Amps - Overhead service, new main panel 100 Amps, N/A weather head/masthead work, main breaker replacement. Filed as: COMMUNITY ELECTRIC |
| 109 Commerce Cir 105 City of Sacramento · APN 275-0251-024-0000 | Plan revision / deferred submittal COM-2212199Portal ↗ | Applied Jun 10, 2022 | Complete | — | EPC - REVISION TO COM-2113889: Due to pricing and supply chain issues owner changed interior wall framing to wood framing. Due to HVAC equipment supply chain issues, HVAC unit substitutions need to be made. See Delta 3 Clouds for Modifications. Filed as: COMMUNITY ELECTRIC |
| 109 Commerce Cir 100 City of Sacramento · APN 275-0251-024-0000 | Commercial tenant improvement COM-2210440Portal ↗ | Issued May 27, 2022 9d review | Certificate of Occupancy | $780,000 | PERMIT TO COMPLETE COM-2101365. PLAN REVIEW COMPLETED ON COM-2101365. EPC - CONVERT EXISTING SUITE 100 12000 SQ FT WAREHOUSE SPACE TO CANNABIS CULTIVATION REMODEL WORK TO INCLUDE CO2 SYSTEM, GROW ROOM, MECHANICAL, ELCTRICAL, PLUMBING, FINISHES AND FIRE PROTECTION - PLNG-INSP revision COM-2223537 Substitution of design professionals. Revision to also include change of wall materials of grow rooms and updates to elect. and mech. Exit path changed so path does not go through grow rooms. no change to Fire sprinkler plans see attached summary letter for more info revision COM-2319858 C02 Tanks and concrete pad have been relocated., new anchorage info revision COM-2410398 to revise one-line diagram revision COM-2411634 M0: Revised the smoke detector remarks for the packaged, fan coil, and air handle schedules, to remove fire alarm requirement, as there is no fire alarm system at the site. Filed as: COMMUNITY ELECTRIC |
| 109 Commerce Cir 105 City of Sacramento · APN 275-0251-024-0000 | Commercial tenant improvement COM-2113889Portal ↗ | Issued Jan 20, 2022 206d review | Certificate of Occupancy | $800,000 | EPC - cannabis suite #105 convert existing 12000 sq ft warehouse space into a cannabis cultivation facility. New partition walls and ceilings, new interior finishes, hvac and electrical and accessible compliance upgrades to toilet facility. CO2 to be installed and fire equipment - PLNG-INSP SEE REVISION COM-2212199: Due to pricing and supply chain issues owner changed interior wall framing to wood framing. Due to HVAC equipment supply chain issues, HVAC unit substitutions need to be made. See Delta 3 Clouds for Modifications. Filed as: COMMUNITY ELECTRIC |
| 3100 1st Ave City of Sacramento · APN 010-0305-001-0000 | Electrical / panel RES-1911013Portal ↗ | Issued Jun 14, 2019 0d review | Finaled | $4,200 | AA: existing panel 060 Amps - Overhead service, Replacement weather head/masthead work, main breaker replacement, adding 060 Amps subpanel. Filed as: COMMUNITY ELECTRIC |
| 2518 X St 2 City of Sacramento · APN 010-0233-008-0000 | Electrical / panel COM-1907451Portal ↗ | Issued Apr 26, 2019 0d review | Finaled | $800 | Replace meter socket like for like. Filed as: COMMUNITY ELECTRIC |
| 6720 Fruitridge Rd City of Sacramento · APN 027-0040-063-0000 | Electrical / panel COM-1822179Portal ↗ | Issued Nov 16, 2018 0d review | Finaled | — | SMUD Inspection request Filed as: COMMUNITY ELECTRIC |