Active in City of Sacramento (3 permits)
Raw permit filing name: CREW CAPITAL CORPORATION
2 issued · 2 parcels
vs 2 prior 24m
2 construction/remodel
Sum of permit job values
Application → issuance
Latest: Apr 10, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 1 | 1 | — | $200,000 | — | 42d (83d p75) | — | |
| 1 | 1 | — | $90,000 | — | 4d (21d p75) | — | |
| 1 | 0 | — | — | — | 41d (93d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 1424 Perkins Way City of Sacramento · APN 012-0291-012-0000 | Remodel / interior alteration RES-2502939Portal ↗ | Issued Apr 10, 2025 57d review | Finaled | $90,000 | EPC - INTERIOR REMODEL TO INCLUDE: 1. DEMOLITION OF EXISTING HALF BATH AND LAUNDRY 2. CONSTRUCTION OF NEW PRIMARY EN-SUITE WITH CLOSET SYSTEM (TBD) AND BATHROOM WITH WALK-IN SHOWER PER PLANS 3. RELOCATION OF WASHER AND DRYER INTO HALL BATH PER PLANS 4. COMPLETE RENOVATION OF HALL BATH INCLUDING CHANGE OF DOOR SWING, NEW PLUMBING LOCATIONS, FIXTURES, FINISHES, FLOORING, LIGHTING/ELECTRICAL, AND CABINETRY PER PLANS 5. COMPLETE RENOVATION OF KITCHEN INCLUDING REMOVAL OF BEARING WALL BETWEEN KITCHEN AND DINING ROOM, SOFFIT REMOVAL, NEW SPACE PLANNING, APPLIANCES (INTEGRATED), QUARTZITE COUNTERS, FIXTURES, FINISHES, 48" RANGE, PLASTER HOOD, FLOORING (TO MATCH EXISTING WOOD THROUGHOUT), LIGHTING/ELECTRICAL, AND CABINETRY PER PLANS 6. WIDENING OF OPENING BETWEEN LIVING ROOM AND HALLWAY - EXISTING ENTRY HEADER DETAIL TO BE MATCHED 7. RECONFIGURATION OF HALL CLOSET - REMOVAL OF SIDE WALL TO WIDEN, REMOVAL OF EXISTING SHELVING, AND CONSTRUCTION OF TWO NEW SHELVES AND NEW "KITTY" DOOR TO BE INTEGRATED WITH CLOSET DOOR (TBD) 8. RELOCATION OF WATER HEATER TO ATTIC 9. CONSTRUCTION OF NEW SIDE ENTRY AREA WITH PANELING, HOOKS, AND WALLPAPER 10. INSTALLATION OF NEW DOOR CHIME WALLPAPER ON FRONT ENTRY WALL 11. NEW LIGHTING AND ELECTRICAL THROUGHOUT AS NEEDED AND PER ELECTRICAL PLANS. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. All work subject to field inspections. Filed as: CREW CAPITAL CORPORATION |
| 2708 18th St City of Sacramento · APN 012-0042-003-0000 | Plan revision / deferred submittal RES-2422579Portal ↗ | Applied Oct 14, 2024 | Complete | — | EPC - Revision to RES-2414164: Roof material changing to comp shingles. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION. Filed as: CREW CAPITAL CORPORATION |
| 2708 18th St City of Sacramento · APN 012-0042-003-0000 | Addition (adds square footage) RES-2414164Portal ↗ | Issued Aug 28, 2024 62d review | Finaled | $200,000 | EPC - 393-sqft addition to include (3) separate roof coverings. Re-roof house with tile. SEE REVISION RES-2422579: Change in roof materials to comp shingles. Filed as: CREW CAPITAL CORPORATION |