Active in City of Sacramento (3 permits)
Raw permit filing name: DOKI SOLAR ELECTRIC AND AIR
2 issued · 3 parcels
vs 1 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Apr 16, 2024
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 1 | 0 | — | $9,050 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $3,000 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $47,000 | — | 10d (61d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 1317 63rd St City of Sacramento · APN 008-0322-013-0000 | Roof replacement RES-2408110Portal ↗ | Applied Apr 16, 2024 | Void | $9,050 | HVAC Permit: Installation of new HVAC package unit on back of roof so it will not be visible from road by all the requirements. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Filed as: DOKI SOLAR ELECTRIC AND AIR |
| 3301 Folsom Blvd City of Sacramento · APN 007-0223-016-0000 | Repair tied to a housing/code case COM-2210619Portal ↗ | Issued May 23, 2022 3d review | Finaled | $47,000 | CHANGE OUT SIX (6) GAS/ELECTRIC ROOFTOP PACKAGE UNITS. Filed as: DOKI SOLAR ELECTRIC AND AIR |
| 2293 Pierre Ave City of Sacramento · APN 052-0101-005-0000 | Electrical / panel RES-2106232Portal ↗ | Issued Mar 24, 2021 0d review | Expired Permit | $3,000 | E-Permit: existing panel 150 Amps - Overhead service, new main panel 200 Amps, Reuse Existing weather head/masthead work, main breaker replacement. Filed as: DOKI SOLAR ELECTRIC AND AIR |