Active in City of Sacramento (2 permits)
Raw permit filing name: DOME CONSTRUCTION CORPORATION
2 issued · 1 parcels
vs 0 prior 24m
2 construction/remodel
Sum of permit job values
Application → issuance
Latest: Aug 15, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 1 | 1 | — | $165,295 | — | 4d (21d p75) | — | |
| 1 | 1 | — | $2,547,038 | — | 63d (119d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 1230 J St City of Sacramento · APN 006-0111-018-0000 | Commercial tenant improvement COM-2508730Portal ↗ | Issued Aug 15, 2025 108d review | Expired Permit | $2,547,038 | EXPEDITED - Area of work- 45,010 SF. Construction type- I-A. Occupancy- A2,A3,B,F,M,S1. Work includes renovation of the public spaces on the Basement Levels 1-3. The design includes new finishes throughout on the floors, walls, and ceilings. New updated reception desks and relocation of the bar services. Closing off the historic entrance and addition of an exit near the bar. Providing four (4) operable windows and fire sprinkler modifications. - PLNG-INSP Filed as: DOME CONSTRUCTION CORPORATION |
| 1230 J St City of Sacramento · APN 006-0111-018-0000 | Remodel / interior alteration COM-2515702Portal ↗ | Issued Aug 7, 2025 13d review | Expired Permit | $165,295 | EPC - NO EXTERIOR WORK. Removal of existing floor, wall and ceiling finishes throughout the public space on the basement level, level 1 and level 2. Removal of existing casework at level 1. Relocate existing bar. Mechanical demo is limited to removing of 2 supply air devices and moving them for the new work plan. No demo work necessary in the existing bar area that is being removed. Removal of receptacles and data outlets for existing entry, lobby, and bar areas on level 1. Removal of two existing receptacles at open area on level 2. Removal of lighting fixtures at existing ballroom and wall sconce lights at lobby on basement level. Removal of lighting fixtures at entry, lobby, bar and lounge areas on level 1. Removal of lighting fixtures at men's and women's restrooms on both levels 1 and 2. Removal of lighting fixtures at dining and open area at level 1. All lavatories, faucets and associated materials to be removed on both levels 1 and 2 for men's and women's restrooms. Filed as: DOME CONSTRUCTION CORPORATION |