Active in Unincorporated Marin (10 permits)
Raw permit filing name: ED ELECTRIC
10 issued · 8 parcels
vs 2 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Feb 8, 2023
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in Unincorporated Marin (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 4 | 4 | — | $8,780 | 1d (n=4) | 0d (0d p75) | Above 75th pct turnaround | |
| 4 | 4 | — | $15,884 | 0d (n=4) | 0d (0d p75) | Within typical range | |
| 1 | 1 | — | $32,595 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $10,000 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 571 Miller Creek Rd Unincorporated Marin · APN 164-102-04 | Electrical / panel B32529Portal ↗ | Issued Feb 8, 2023 0d review | Issued | $3,818 | Service upgrading - Install new main sub panel; only disconnect, no distribution — Service Upgrade Filed as: ED ELECTRIC |
| 238 Reed Blvd Unincorporated Marin · APN 043-213-05 | EV charger B32527Portal ↗ | Issued Feb 8, 2023 0d review | Issued | $670 | New - Install EV Charger — EV Charging Station Filed as: ED ELECTRIC |
| 238 Reed Blvd Unincorporated Marin · APN 043-213-05 | Electrical / panel B31366Portal ↗ | Issued Oct 12, 2022 0d review | Issued | $4,309 | bring power 60A 240V and install disconnect mean. Install ridge and EMT conduit, around 125’. — New Circuits / Outlets Filed as: ED ELECTRIC |
| 6 Eagle Rock Rd Unincorporated Marin · APN 034-082-16 | EV charger B30047Portal ↗ | Issued Jun 16, 2022 1d review | Issued | $1,362 | Installing Tesla charger 60 amps, 240 volts — EV Charging Station; With Electronic Inspection Filed as: ED ELECTRIC |
| 273 Ricardo Rd Unincorporated Marin · APN 043-192-13 | EV charger B29489Portal ↗ | Issued May 18, 2022 27d review | Issued | $5,500 | Service upgrade from 100amps-200amps and EV car Charger — Service Upgrade, EV Charging Station Filed as: ED ELECTRIC |
| 942 Alturas Way Unincorporated Marin · APN 050-023-48 | Electrical / panel B29667Portal ↗ | Issued May 9, 2022 0d review | Issued | $4,257 | Re fitting exterior sub panel. Hot tube disconnect from 50 amps 240 to new 100 amps 240 volts Conduit 1 EMT, conductor size 1AWG. — Replace Circuits / Outlets Filed as: ED ELECTRIC |
| 245 Alameda De La Loma Unincorporated Marin · APN 160-252-21 | EV charger B29090Portal ↗ | Issued Mar 15, 2022 0d review | Issued | $1,248 | Ev Charger installation of 60 amps,240 Volts — EV Charging Station; With Electronic Inspection Filed as: ED ELECTRIC |
| 942 Alturas Way Unincorporated Marin · APN 050-023-48 | HVAC / heat pump B26657Portal ↗ | Issued Aug 17, 2021 0d review | Issued | $10,000 | Will be doing a service upgrade from 120amps to 200amps. Installing 2 AC unit. Installing a heat pump and refeeding hot tube(rewiring hot tube) — Service Upgrade Filed as: ED ELECTRIC |
| 405 Gage Ln Unincorporated Marin · APN 146-310-52 | Solar / battery storage 167197Portal ↗ | Issued Feb 19, 2021 59d review | Issued | $32,595 | 8.40kw Ground Mount Elevated Rack Photovoltaic **E-Inspection** Filed as: ED ELECTRIC |
| 157 Mark Twain Ave Unincorporated Marin · APN 180-351-02 | Electrical / panel B24795Portal ↗ | Issued Feb 3, 2021 0d review | Issued | $3,500 | Upgrading Sub panel. currently located inside the wall of kitchen and garage. Adding 8 reset lighting in living room,kitchen — Service Upgrade Filed as: ED ELECTRIC |