Active in City of Sacramento (3 permits)
Raw permit filing name: ELLIS HEATING AND AIR
3 issued · 3 parcels
vs 0 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: May 24, 2016
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 2 | 2 | — | $20,180 | 0d (n=2) | 0d (0d p75) | — | |
| 1 | 1 | — | $8,750 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 7233 Milford St City of Sacramento · APN 047-0034-010-0000 | HVAC / heat pump RES-1608074Portal ↗ | Issued May 24, 2016 0d review | Finaled | $7,200 | Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314 Filed as: ELLIS HEATING AND AIR |
| 1520 River Park Dr City of Sacramento · APN 277-0287-007-0000 | Roof replacement COM-1605606Portal ↗ | Issued Apr 13, 2016 0d review | Expired Permit | $8,750 | HVAC change out roof mount package like for like. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Filed as: ELLIS HEATING AND AIR |
| 7659 Greenhaven Dr City of Sacramento · APN 031-0480-045-0000 | HVAC / heat pump RES-1601527Portal ↗ | Issued Feb 2, 2016 0d review | Finaled | $12,980 | Change-out w/new ducts Ground Mount to Ground Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%.Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314 Filed as: ELLIS HEATING AND AIR |