Active in City of Sacramento (1 permit)
Raw permit filing name: FOUR EDGES INC
1 issued · 1 parcels
vs 0 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Oct 1, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 1 | 1 | — | $150,000 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 7009 Catlen Way City of Sacramento · APN 029-0388-005-0000 | Plumbing / water heater / sewer RES-2621741Portal ↗ | Issued Oct 1, 2026 1d review | Issued | $150,000 | INTERIOR REMODEL AND RECONSTRUCTION FOLLOWING A PLUMBING-RELATED WATER LOSS. SCOPE INCLUDES INSULATION, DRYWALL, INTERIOR FINISHES, LVP FLOORING, KITCHEN CABINETRY AND COUNTERTOPS, BATHROOM VANITY AND SHOWER, INTERIOR DOORS, CLOSET MODIFICATIONS, FIREPLACE REFINISHING, AND INTERIOR PAINTING. KITCHEN IMPROVEMENTS ALSO INCLUDE REPLACING THE EXISTING ELECTRIC RANGE WITH NEW GAS RANGE AND EXTENDING THE GAS SUPPLY TO THE NEW APPLIANCE LOCATION. NO CHANGES TO THE EXISTING BUILDING FOOTPRINT ARE PROPOSED.WATER CONSERVING FIXTURES ARE REQUIRED TO BE INSTALLED THROUGHOUT THIS RESIDENCE PER SB 407 (NOTE: RESIDENCES BUILT AFTER JANUARY 1, 1994, ARE EXEMPT). CARBON MONOXIDE & SMOKE ALARMS REQUIRED. REFERENCE CRC SECTIONS R310.1 & R311.1. ALL WORK IS SUBJECT TO FIELD INSPECTION. ALL WORK IS SUBJECT TO FIELD INSPECTION.THE EGRESS WINDOWS WILL MEET THE CODE REQUIREMENTS ENFORCED AT THE TIME THE STRUCTURE WAS PERMITTED. THE STRUCTURE WAS BUILT IN (1967). CARBON MONOXIDE & SMOKE ALARMS REQUIRED. REFERENCE CRC SECTIONS R310.1 & R311.1. ALL WORK IS SUBJECT TO FIELD INSPECTION.ALL WORK IS SUBJECT TO FIELD INSPECTION. Filed as: FOUR EDGES INC |