Active in City of Sacramento (8 permits)
Raw permit filing name: GEWEKE CONSTRUCTION & DEVELOPMENT
7 issued · 3 parcels
vs 0 prior 24m
2 construction/remodel
Sum of permit job values
Application → issuance
Latest: Dec 18, 2019
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 4 | 3 | — | $3,630,000 | 50d (n=3) | 1d (3d p75) | Above 75th pct turnaround | |
| 2 | 2 | — | $1,900,000 | 71d (n=2) | 63d (119d p75) | — | |
| 1 | 1 | — | $18,000 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $75,000 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 3001 Advantage Way City of Sacramento · APN 225-1960-010-0000 | Electrical / panel COM-1917365Portal ↗ | Issued Dec 18, 2019 98d review | Expired Permit | $18,000 | SHARED PLANS w/ COM-1917364. Install 154sqft steel pergola in Courtyard w/ underground electrical for low-voltage lighting Filed as: GEWEKE CONSTRUCTION & DEVELOPMENT |
| 3001 Advantage Way City of Sacramento · APN 225-1960-010-0000 | Commercial tenant improvement COM-1917364Portal ↗ | Issued Dec 18, 2019 98d review | Finaled | $500,000 | SHARED PLANS w/ COM-1917365. Exterior finish repairs to south elevation due to water intrusion damage. Remove existing stucco finish to reconstruct moisture barrier system. Structural water damage repairs to be in-kind, like-for-like. Remove interior drywall where water intrusion is suspected to inspect for mold growth, restore fire wall ratings as needed. Extend existing trellis @ Courtyard BBQ another 6-ft Interior remodel to include 1st level common area removal and update of finishes. Replace entry to Executive Center for accessibility and rework Registration access to Admin area. Filed as: GEWEKE CONSTRUCTION & DEVELOPMENT |
| 2981 Advantage Way City of Sacramento · APN 225-1960-009-0000 | Commercial tenant improvement COM-1714132Portal ↗ | Issued Sep 20, 2017 44d review | Finaled | $1,400,000 | EXPEDITED - EPC - Remodel interior of existing 3-story hotel; Project Area = 59,414 SF; Type V-A; Occ. R-1. Renovations of public space and guestrooms per brand requirements; updating finishes; replacing lighting; replacing bathroom vanities; updating accessible guestroom bathrooms. FIRE SPRINKLER LETTER FROM C-16 IN SUPP FILE. Filed as: GEWEKE CONSTRUCTION & DEVELOPMENT |
| 3021 Advantage Way City of Sacramento · APN 225-1960-011-0000 | Windows / doors / siding COM-1709246Portal ↗ | Issued Jul 21, 2017 50d review | Finaled | $1,200,000 | EPC - Repair/replace existing exterior cement plaster and windows due to water damage. Includes inspection for damaged plywood sheathing and underlying framing. Repair some drive aisle slope. Repair/replacement of framing is subject to inspection and may require revisions to approved drawings or separate permit. Scope does not include replacement of PTAC units. Filed as: GEWEKE CONSTRUCTION & DEVELOPMENT |
| 3001 Advantage Way City of Sacramento · APN 225-1960-010-0000 | Windows / doors / siding COM-1709833Portal ↗ | Issued Jun 13, 2017 5d review | Finaled | $30,000 | REMOVE AND REPLACE STUCCO AND METAL REVEALS ON SOUTH ELEVATION EAST GABLE WALL INCLUDING SIDE WALLS AT "POP OUT". FINISH PRODUCT TO MATCH EXISTING CONDITIONS. REPLACE ANY NOTICABLE WATER DAMAGED FRAMING MEMBERS AS NEEDED. Filed as: GEWEKE CONSTRUCTION & DEVELOPMENT |
| 2981 Advantage Way City of Sacramento · APN 225-1960-009-0000 | Windows / doors / siding COM-1700122Portal ↗ | Issued Jun 13, 2017 160d review | Finaled | $1,200,000 | EPC - Repair/replace existing exterior cement plaster and windows due to water damage. Includes inspection for any damaged plywood sheathing and underlying framing. Repair/replacement of framing is subject to field inspection and may require revisions to approved drawings or separate permit. Scope does not include replacement of PTAC units. Filed as: GEWEKE CONSTRUCTION & DEVELOPMENT |
| 3021 Advantage Way City of Sacramento · APN 225-1960-011-0000 | Windows / doors / siding COM-1709063Portal ↗ | Applied May 30, 2017 | Void | $1,200,000 | REPLACE WINDOWS THROUGHOUT AND RE-STUCCO THE EXTERIOR OF THE BUILDING. All work will be performed within full compliance of applicable codes. Filed as: GEWEKE CONSTRUCTION & DEVELOPMENT |
| 3021 Advantage Way City of Sacramento · APN 225-1960-011-0000 | Plumbing / water heater / sewer COM-1612255Portal ↗ | Issued Aug 3, 2016 0d review | Finaled | $75,000 | EXPEDITED - REPLACE EXISTING BOILER SYSTEM WITH (3) NEW WATER HEATERS, REPLACEMENT OF EXISTING BOOSTER PUMP WITH NEW PUMP. IN MECHANICAL ROOM. Filed as: GEWEKE CONSTRUCTION & DEVELOPMENT |