Active in Unincorporated Marin (48 permits) · City of Sacramento (33 permits)
Raw permit filing name: GOLD RUSH ENERGY SOLUTIONS
76 issued · 53 parcels
vs 13 prior 24m(−92%)
2 construction/remodel
Sum of permit job values
Application → issuance
Latest: Feb 26, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in Unincorporated Marin (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 54 | 54 | — | $1,649,642 | 3d (n=54) | 0d (0d p75) | Above 75th pct turnaround | |
| 10 | 10 | — | $18,111 | 0d (n=10) | 0d (0d p75) | Within typical range | |
| 5 | 0 | — | — | — | — | — | |
| 5 | 5 | — | $138,500 | 0d (n=5) | 0d (1d p75) | Within typical range | |
| 3 | 3 | — | $26,652 | 0d (n=3) | 0d (0d p75) | Within typical range | |
| 2 | 2 | — | $27,000 | 19d (n=2) | 83d (148d p75) | — | |
| 2 | 2 | — | $7,600 | 0d (n=2) | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 5172 Bissett Way City of Sacramento · APN 225-1510-065-0000 | Solar / battery storage RES-2503967Portal ↗ | Issued Feb 26, 2025 0d review | Withdrawn | $21,870 | Reviewed by SolarApp+ 7290kw Solar PV System, and nullgal Solar WH System (water heater installed null). Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 2343 Swainson Way City of Sacramento · APN 274-0560-060-0000 | Electrical / panel RES-2323117Portal ↗ | Issued Nov 1, 2023 2d review | Expired Permit | $500 | Related to permit RES-2318380. Installing Rapid Shutdown device to exterior of dwelling, Change to Electrical equipment layout as per SMUD Correction. Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 272 El Camino Ave City of Sacramento · APN 275-0021-010-0000 | Plan revision / deferred submittal RES-2320535Portal ↗ | Applied Sep 26, 2023 | Complete | — | REVSION TO RES-2313743 SHEETS M-1 & M-2: 1- Detailing location of all equipment. Single Line Diagram SHEET E-2: 2- 30A AC Disconnect added between ESS and Gateway.3: 60A AC disconnect and Meter socket have been placed after inverter running into Subpanel.4: Subpanel now landing on 100A in Backup Gateway from lugged connection Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 1000 Bayhills Dr Unincorporated Marin · APN 180-400-01 | Other B35473Portal ↗ | Issued Sep 20, 2023 0d review | Issued | $26,750 | 2 Tesla Powerwalls Storage Batteries Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 2343 Swainson Way City of Sacramento · APN 274-0560-060-0000 | Plan revision / deferred submittal RES-2318380Portal ↗ | Applied Aug 29, 2023 | Complete | — | REVISION TO RES-2310257 REVISION TO SINGLE LINE DIAGRAM. Solar now landing on 40A in New Subpanel, ?2: Showing existing subpanel landing on 90A in new subpanel?3: Now showing Solar/battery system landing on 100A in MSP, ?4: Pool and AC loads now correctly shown in MSP Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 2343 Swainson Way City of Sacramento · APN 274-0560-060-0000 | Plan revision / deferred submittal RES-2315525Portal ↗ | Applied Jul 25, 2023 | Complete | — | REVISION TO RES-2310257 CHANGE TO ARRAY LAYOUT Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 272 El Camino Ave City of Sacramento · APN 275-0021-010-0000 | Remodel / interior alteration RES-2313743Portal ↗ | Issued Jul 11, 2023 6d review | Finaled | $16,000 | 1 TESLA POWERWALL STAORAGE BATTERY. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. ALL WORK SUBJECT TO FIELD INSPECTION. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994, are exempt). SEE REVISION SHEETS M-1 & M-2: 1- Detailing location of all equipment. Single Line Diagram SHEET E-2: 2- 30A AC Disconnect added between ESS and Gateway.3: 60A AC disconnect and Meter socket have been placed after inverter running into Subpanel.4: Subpanel now landing on 100A in Backup Gateway from lugged connection Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 2343 Swainson Way City of Sacramento · APN 274-0560-060-0000 | Solar / battery storage RES-2310257Portal ↗ | Issued Jun 7, 2023 16d review | Finaled | $64,102 | 8.295kw Solar PV System, and 0gal Solar WH System (water heater installed null) & 13.5 Kwh ESS. All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). REVISION RES-2315525: CHANGE ARRAY LAYOUT REVISION RES-2318380:Revision to Single Line Diagram SHEET E-2,1: Solar now landing on 40A in New Subpanel, ?2: Showing existing subpanel landing on 90A in new subpanel ?3: Now showing Solar/battery system landing on 100A in MSP, 4: Pool and AC loads now correctly shown in MSP Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 767 Bay Rd Unincorporated Marin · APN 049-191-21 | Solar / battery storage B33412Portal ↗ | Issued Apr 13, 2023 0d review | Issued | $27,360 | Roof Mount Solar, 7.6kw System Size, 19 PV Modules Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 38 Terrace Dr Unincorporated Marin · APN 052-540-17 | Solar / battery storage B32791Portal ↗ | Issued Mar 1, 2023 0d review | Issued | $24,500 | Roof Mount Solar, 7.77kw System Size, 21 PV Modules Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 200 Bicentennial Cir City of Sacramento · APN 079-0420-002-0000 | Solar / battery storage COM-2203006Portal ↗ | Issued Dec 16, 2022 310d review | Expired Permit | $134,232 | EPC - 44.4kw Solar PV System, and 0gal Solar WH System (water heater installed null). Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 122 Mabry Way Unincorporated Marin · APN 180-043-08 | Solar / battery storage B32012Portal ↗ | Issued Dec 9, 2022 0d review | Issued | $41,699 | Roof Mount Solar, 12.95kw System Size, 35 PV Modules Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 69 Lomita Dr Unincorporated Marin · APN 033-091-05 | Solar / battery storage B31915Portal ↗ | Issued Dec 1, 2022 0d review | Issued | $14,618 | Roof Mount Solar on Primary Dwelling, 4.44kw System Size, 12 PV Modules Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 69 Lomita Dr Unincorporated Marin · APN 033-091-05 | Solar / battery storage B31894Portal ↗ | Issued Nov 30, 2022 0d review | Issued | $18,370 | Roof Mount Solar, 5.55kw System Size, 15 PV Modules Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 990 Butterfield Rd Unincorporated Marin · APN 176-141-13 | Other B31178Portal ↗ | Issued Sep 26, 2022 0d review | Issued | $40,000 | 2 Enphase Encharge storage Batteries 10kw Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 19 Terrace Dr Unincorporated Marin · APN 052-530-10 | Solar / battery storage B31076Portal ↗ | Issued Sep 16, 2022 0d review | Issued | $15,140 | Roof mount Solar, 4.44kw System Size, 12 PV Modules Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 990 Butterfield Rd Unincorporated Marin · APN 176-141-13 | Solar / battery storage B30751Portal ↗ | Issued Aug 16, 2022 0d review | Issued | $47,407 | Solar Roof Mount 7.3 kw 20 pv mods Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 15 Flemings Ct Unincorporated Marin · APN 052-520-24 | Solar / battery storage B30742Portal ↗ | Issued Aug 16, 2022 0d review | Issued | $32,895 | Solar Roof Mount 7.3kw 20 PV Mods Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 49 Terrace Dr Unincorporated Marin · APN 052-540-03 | Solar / battery storage B29984Portal ↗ | Issued Jun 9, 2022 0d review | Issued | $12,276 | Roof Mount Solar, 3.6kw System Size, 10 PV Modules Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 1216 38th St City of Sacramento · APN 008-0193-005-0000 | Plan revision / deferred submittal RES-2208085Portal ↗ | Applied Apr 15, 2022 | Complete | — | Revision to RES-2202173- SHEETS M-1 through M-4: Change to Panel Layout. SHEET E-2: PV going from 2 strings to 3 strings. 3rd string landing in 3rd 20A breaker in Enphase Combiner. Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 2317 Cashaw Way City of Sacramento · APN 225-1330-017-0000 | Solar / battery storage RES-2203209Portal ↗ | Issued Feb 17, 2022 6d review | Finaled | $33,600 | 9.6kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 424 Calle Arboleda Unincorporated Marin · APN 160-272-10 | Electrical / panel B28651Portal ↗ | Issued Feb 8, 2022 0d review | Issued | $2,000 | MAIN SERVICE PANEL UPGRADE / LIKE FOR LIKE 125A — Service Upgrade Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 1216 38th St City of Sacramento · APN 008-0193-005-0000 | Solar / battery storage RES-2202173Portal ↗ | Issued Feb 2, 2022 2d review | Finaled | $47,250 | 10.585kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” Revision RES-2208085- SHEETS M-1 through M-4: Change to Panel Layout. SHEET E-2: PV going from 2 strings to 3 strings. 3rd string landing in 3rd 20A breaker in Enphase Combiner. Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 4740 Rex Ct City of Sacramento · APN 016-0353-003-0000 | Plan revision / deferred submittal RES-2201897Portal ↗ | Applied Jan 26, 2022 | Complete | — | REVISION TO RES-2124259-Page E-2: ?1- Removal of 3rd string & panels from it added to 2 remaining strings; Page E-2: ?2 - AC Disconnect and SMUD Meter moved to be between Combiner and Smart Switch ; Page E-2: ?3- 30A breaker replaced with 40A in Smart Switch; Page E-2: ?4- 60A breaker in Load Center Filed as: GOLD RUSH ENERGY SOLUTIONS |
| 1000 Bayhills Dr Unincorporated Marin · APN 180-400-01 | Other B28339Portal ↗ | Issued Jan 13, 2022 0d review | Issued | $26,750 | 2 Tesla Powerwalls Storage Batteries Filed as: GOLD RUSH ENERGY SOLUTIONS |