Active in Unincorporated Marin (57 permits)
Raw permit filing aliases merged: GREEN BAY REMODELING · GREEN BAY REMODELING INC
55 issued · 46 parcels
vs 9 prior 24m(+111%)
37 construction/remodel
Sum of permit job values
Application → issuance
Latest: Apr 1, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in Unincorporated Marin (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 36 | 34 | — | $1,217,700 | 35d (n=34) | 83d (148d p75) | Faster than peer median | |
| 9 | 9 | — | $253,000 | 0d (n=9) | 0d (0d p75) | Within typical range | |
| 8 | 8 | — | $185,500 | 4d (n=8) | 0d (1d p75) | Above 75th pct turnaround | |
| 1 | 1 | — | $200,000 | — | 160d (249d p75) | — | |
| 1 | 1 | — | $12,000 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $2,000 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $30,000 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 803 Everest Ct Unincorporated Marin · APN 049-063-33 | Other B46317Portal ↗ | Issued Apr 1, 2026 5d review | Issued | $15,500 | — Filed as: GREEN BAY REMODELING INC |
| 170 Redwood Dr Unincorporated Marin · APN 172-151-40 | Other B46101Portal ↗ | Issued Mar 5, 2026 0d review | Issued | $18,000 | — Filed as: GREEN BAY REMODELING INC |
| 919 W California Ave Unincorporated Marin · APN 050-013-41 | Plumbing / water heater / sewer B45541Portal ↗ | Issued Feb 2, 2026 17d review | Issued | $35,000 | Kitchen Remodel: Remove existing counters, cabinets, sink, dishwasher, range, refrigerator and wall section (@island) as indicated. Install new cabinets, counter, sink, dishwasher, range and refrigerator. Install new finishes. Bathroom Remodel: Remove existing vanity, sink, toilet, shower, shower/tub surround, bathtub & vanity light. Install new vanity, sink, toilet, shower, shower surround and vanity light. Install new finishes. Filed as: GREEN BAY REMODELING INC |
| 26 Eagle Rock Rd Unincorporated Marin · APN 034-082-05 | Other B45380Portal ↗ | Issued Jan 26, 2026 18d review | Issued | $25,000 | Bathroom Remodel Filed as: GREEN BAY REMODELING INC |
| 803 Everest Ct Unincorporated Marin · APN 049-063-33 | Remodel / interior alteration 180873Portal ↗ | Issued Jan 7, 2026 65d review | Issued | $21,600 | Remodel Master Bath; Repl Windows With Smaller Filed as: GREEN BAY REMODELING |
| 19 Terrace Dr Unincorporated Marin · APN 052-530-10 | Plumbing / water heater / sewer B45014Portal ↗ | Issued Dec 9, 2025 5d review | Issued | $15,000 | Bathroom Remodel - demo and replace fixtures. Remove bathtub replace with walk-in shower. Upgrade plumbing, electrical and all finishes. Filed as: GREEN BAY REMODELING INC |
| 335 Tennessee Ave Unincorporated Marin · APN 050-192-04 | Plumbing / water heater / sewer B44808Portal ↗ | Issued Nov 18, 2025 1d review | Issued | $75,000 | Remove Existing Counters, cabinets, sink, dishwasher, induction cooktop, double oven, refrigerator, lighting and pantry wall as indicated. Install new cabinets, counters, dishwasher, range, refrigerator & lighting. Install new finishes. Filed as: GREEN BAY REMODELING INC |
| 97 Glenside Way Unincorporated Marin · APN 179-261-75 | Plumbing / water heater / sewer B43705Portal ↗ | Issued Sep 4, 2025 2d review | Issued | $18,000 | Primary Bathroom Remodel: Remove existing vanity, sinks, toilet, shower, shower surround, bathtub & lighting. Remove non-load bearing wall between shower & vanity. Install new vanity, sinks, toilet, shower, shower surround & lighting. Install new finishes. Filed as: GREEN BAY REMODELING INC |
| 9 Pigeon Hollow Rd Unincorporated Marin · APN 016-052-05 | Plumbing / water heater / sewer B42704Portal ↗ | Issued Jun 10, 2025 0d review | Issued | $15,000 | Bathroom Remodel- Scope of Work: Work includes full demolition of existing finishes and removel of built-in bathtub. Convert tub area into new makeup station, wall tile installation in shower, niche, and frameless glass enclosure. Remodel to include updated flooring, lighting, plumbing fixtures, accessories, and paint. Existing vanity and countertop to remain in place and be protected throughout construction. All finish materials to be selected by client from approved collection. Filed as: GREEN BAY REMODELING INC |
| 222 Julia Ave Unincorporated Marin · APN 051-172-25 | Remodel / interior alteration 179414Portal ↗ | Issued Jun 9, 2025 31d review | Issued | $20,000 | Kitchen Remodel Filed as: GREEN BAY REMODELING INC |
| 97 Berens Dr Unincorporated Marin · APN 074-111-03 | Plumbing / water heater / sewer B42580Portal ↗ | Issued May 29, 2025 0d review | Issued | $11,000 | Guest Bathroom Remodel ALL WORK DONE NEEDS TO FIT CALIFORNIA BUILDIUNG CODES OF PLUMBING AND ELCTRICAL Electrical: Run dedicated lines per proposed plan, layout and city code. Install GFCI outlets in bathroom by code per plan. Install recessed lights in the bathroom per plan. Install exhaust fan to bathroom. Add a humidity sensor for fan and a vacancy sensor for lights. Install light fixture above the vanity. Pass city inspection. Plumbing + mechanical: Upgrade plumbing in shower as needed by code, approved layout and 3-D rendering. Prepare plumbing for vanity in new location per plan. Install mold block and moist resistance paper on shower walls. Install waterproofing board on shower walls. Apply liquid water proofing on entire shower walls and shampoo niche. Prepare sub floor for tile installation (moist resistance paper, Hardie backer, red guard) Pass all rough inspections. Drywall and paint: Install drywall as needed in bathroom walls. Mud walls and prepare for paint. Paint the walls, ceiling, trims in bathroom. Tile installation on bathroom floor, shower walls and shampoo niches (all tile to be per chosen material and approved 3-D Rendering) Apply mold resistant grout and sealer to all tile. Fixtures: Install vanity by approved layout and 3-D rendering. Install prefabricated counter on vanity. Connect the faucet and drain. Install new shower head and hand held faucet fixtures. Install bathroom accessories: new mirror, toilet paper holder, light fixtures etc... by approved by layout and 3-D rendering. Install electrical outlets, switches and sensors and all needed components for bathroom per plan. Clean up remaining debris and haul away. Complete a thorough walkthrough and Final touch ups. Pass all city inspections. Filed as: GREEN BAY REMODELING INC |
| 97 Berens Dr Unincorporated Marin · APN 074-111-03 | Plumbing / water heater / sewer B42527Portal ↗ | Issued May 27, 2025 0d review | Issued | $27,000 | Master Bathroom Remodeling. Remove existing tub and install free standing tub Remove existing separation wall between vanity room to wet room Move toilet to wanted location Install double sink vanity in needed location per plan Electrical: Run dedicated lines per proposed plan, layout and city code. Install GFCI outlets in bathroom by code per plan. Install recessed lights in the bathroom per plan. Install exhaust fan to bathroom. Add a humidity sensor for fan and a vacancy sensor for lights. Install light fixture above the vanity. Pass city inspection. Plumbing + mechanical: Upgrade plumbing in shower as needed by code, approved layout and 3-D rendering. Prepare plumbing for vanity in new location per plan. Install mold block and moist resistance paper on shower walls. Install waterproofing board on shower walls. Apply liquid water proofing on entire shower walls and shampoo niche. Prepare sub floor for tile installation (moist resistance paper, Hardie backer, red guard) Pass all rough inspections. Drywall and paint: Install drywall as needed in bathroom walls. Mud walls and prepare for paint. Paint the walls, ceiling, trims in bathroom. Tile installation on bathroom floor, shower walls and shampoo niches (all tile to be per chosen material and approved 3-D Rendering) Apply mold resistant grout and sealer to all tile. Fixtures: Install vanity by approved layout and 3-D rendering. Install prefabricated counter on vanity. Connect the faucet and drain. Install new shower head and hand held faucet fixtures. Install bathroom accessories: new mirror, toilet paper holder, light fixtures etc... by approved by layout and 3-D rendering. Install electrical outlets, switches and sensors and all needed components for bathroom per plan. Filed as: GREEN BAY REMODELING INC |
| 9 Pigeon Hollow Rd Unincorporated Marin · APN 016-052-05 | Plumbing / water heater / sewer B42428Portal ↗ | Issued May 16, 2025 0d review | Issued | $7,000 | Demolish and remove existing shower materials in compliance with California Building Code (CBC) and California Plumbing Code (CPC). Inspect framing and subfloor; repair or reinforce as needed to meet structural and waterproofing standards. Install pre-fabricated, UPC-listed shower pan with approved drain connection per 2022 CPC. Install pre-fabricated, waterproof shower wall panels with code-complaint adhesives and sealants. Perform minor plumbing adjustments using code-approved materials and methods. Apply watertight sealants at all transitions and joints to maintain a waterproof system. Confirm all installations meet current California energy and water efficiency standards (flow rates, valve types, etc.). Final clean up and project turnover, ready for inspection if required. Filed as: GREEN BAY REMODELING INC |
| 9 Pigeon Hollow Rd Unincorporated Marin · APN 016-052-05 | Remodel / interior alteration 93159Portal ↗ | Applied May 1, 2025 | Applied | $7,000 | Non Structural Partial Bathroom Remodel **5/16/25 Withdrawn By Applicant Bbw Filed as: GREEN BAY REMODELING INC |
| 97 Berens Dr Unincorporated Marin · APN 074-111-03 | Remodel / interior alteration 179102Portal ↗ | Issued Apr 22, 2025 70d review | Issued | $46,000 | Kitchen Remodel; Structural Replacement Of (E) Slider W (N) Accordion Door In Living Rm & Replace Window In Dining Rm T.D. 3-26-25 Filed as: GREEN BAY REMODELING INC |
| 505 Pixie Trl Unincorporated Marin · APN 047-131-30 | Other B41580Portal ↗ | Issued Mar 24, 2025 12d review | Issued | $22,000 | Bathroom Remodel Filed as: GREEN BAY REMODELING INC |
| 427 Los Cerros Dr Unincorporated Marin · APN 070-071-14 | Addition (adds square footage) 178815Portal ↗ | Issued Mar 12, 2025 124d review | Issued | $200,000 | Office And Master Bathrm Addition Filed as: GREEN BAY REMODELING |
| 112 Richardson Dr Unincorporated Marin · APN 043-072-13 | Other B40649Portal ↗ | Issued Jan 8, 2025 15d review | Issued | $35,000 | Bathroom Remodel Filed as: GREEN BAY REMODELING INC |
| 2920 Las Gallinas Ave Unincorporated Marin · APN 164-550-15 | Windows / doors / siding 178332Portal ↗ | Issued Dec 18, 2024 71d review | Issued | $30,000 | Window & Door Alteration T.D. 11-13-24 Filed as: GREEN BAY REMODELING |
| 2000 Bayhills Dr Unincorporated Marin · APN 180-400-10 | Roof replacement B39216Portal ↗ | Issued Aug 22, 2024 0d review | Issued | $12,000 | Bathroom Remodel; Electrical: Run a dedicated line for the new exhaust fan. *run the new dedicated line under floor all the way through crawl space from sub panel to the new fan *run sure up the wall inside closet to reach attic for new fan *patch and paint wall in closet after wire is inspected *patch roof after fan duct is ran through. Pass city inspection. Plumbing + mechanical: Upgrade plumbing in shower as needed by code, approved layout. Prepare plumbing for a new free standing tub replacement. Install mold block and moist resistance paper on shower floor. Install waterproofing board on shower floor. Apply liquid water proofing on entire shower floor. Prepare sub floor for tile installation (moist resistance paper, Hardie backer, red guard) Pass all county rough inspections. Tile installation on bathroom floor Apply mold resistant grout and sealer to all tile. Fixtures: Install Roman spout by free standing tub Clean up remaining debris and haul away. Filed as: GREEN BAY REMODELING INC |
| 250 Hillside Ave Unincorporated Marin · APN 074-082-42 | Other B38531Portal ↗ | Issued Jun 27, 2024 1d review | Issued | $25,000 | Non-structural Bathroom Remodel Filed as: GREEN BAY REMODELING INC |
| 33 Corte Morada Unincorporated Marin · APN 070-201-19 | Other B38361Portal ↗ | Issued Jun 13, 2024 2d review | Issued | $25,000 | Bathroom Remodel Filed as: GREEN BAY REMODELING INC |
| 301 Via Recodo Unincorporated Marin · APN 200-302-50 | Remodel / interior alteration 176135Portal ↗ | Issued Mar 6, 2024 85d review | Issued | $53,000 | Non-Structural Remodel; Decks; Relocate (E) Sub Panel; Replace (E) Wtr Htr; Windows & Doors T.D. 2-29-24 Filed as: GREEN BAY REMODELING |
| 478 Green Glen Way Unincorporated Marin · APN 049-202-08 | Remodel / interior alteration 176127Portal ↗ | Issued Mar 5, 2024 32d review | Issued | $35,000 | Master Bath & Guest Bath Remodel T.D. 2-20-24 Filed as: GREEN BAY REMODELING |
| 108 Richardson Dr Unincorporated Marin · APN 043-072-12 | Remodel / interior alteration 175897Portal ↗ | Issued Feb 2, 2024 42d review | Issued | $20,000 | Non-Structural Bathroom Remodel Filed as: GREEN BAY REMODELING INC |