Active in City of Sacramento (174 permits) · Unincorporated Marin (17 permits)
Raw permit filing name: GREEN DAY POWER
179 issued · 151 parcels
vs 31 prior 24m(−100%)
Includes 1 ADU permits
Sum of permit job values
Application → issuance
Latest: Jan 4, 2024
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 128 | 127 | — | $1,894,355 | 2d (n=127) | 3d (8d p75) | Within typical range | |
| 30 | 29 | — | $353,660 | 0d (n=29) | 0d (0d p75) | Within typical range | |
| 14 | 14 | — | $104,874 | 0d (n=14) | 0d (0d p75) | Within typical range | |
| 9 | 0 | — | $34,597 | — | 41d (93d p75) | — | |
| 6 | 6 | — | $86,150 | 8d (n=6) | 4d (21d p75) | Within typical range | |
| 2 | 1 | — | $10,000 | — | 0d (0d p75) | — | |
| 1 | 1 | — | $5,614 | — | 97d (172d p75) | — | |
| 1 | 1 | — | $8,790 | — | 0d (0d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 826 43rd St City of Sacramento · APN 008-0051-010-0000 | Solar / battery storage RES-2327313Portal ↗ | Issued Jan 4, 2024 8d review | Expired Permit | $37,950 | 7.29kw Solar PV System, and 0gal Solar WH System (water heater installed null). Res roof mount 7.29kW PV and 27kWh ESS with 18-405W modules, 18-micro-inverters, 1-combiner box, 2-Tesla Powerwall 13.5Wh batteries, 1-Tesla Gateway, 1-125 load center, 2-30A AC disconnect, and De-rate main breaker to 175A. All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION. Filed as: GREEN DAY POWER |
| 1576 9th Ave City of Sacramento · APN 012-0371-008-0000 | Remodel / interior alteration RES-2323857Portal ↗ | Issued Nov 9, 2023 1d review | Finaled | $17,400 | 13.5 kWh Energy storage system with a Tesla Powerwall 13.5 kWh battery, a Tesla Gateway, and a 125A load center connected to existing solar. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION. Filed as: GREEN DAY POWER |
| 6897 Cal Valley Way City of Sacramento · APN 041-0047-014-0000 | Plan revision / deferred submittal RES-2315109Portal ↗ | Applied Jul 20, 2023 | Complete | — | Revision to RES-2312995 Corrected existing location of main service panel to North side of dwelling. Moved solar equipment next to MSP as well. Updated placard page. Filed as: GREEN DAY POWER |
| 6897 Cal Valley Way City of Sacramento · APN 041-0047-014-0000 | Solar / battery storage RES-2312995Portal ↗ | Issued Jun 26, 2023 3d review | Finaled | $11,228 | 5.6kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). See revision RES-2315109, Corrected existing location of main service panel to North side of dwelling. Moved solar equipment next to MSP as well. Updated placard page. Filed as: GREEN DAY POWER |
| 6897 Cal Valley Way City of Sacramento · APN 041-0047-014-0000 | Roof replacement RES-2312755Portal ↗ | Issued Jun 21, 2023 0d review | Expired Permit | $19,403 | E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 22 squares of 30yr Laminated Dimensional Composition. CRRC: 0869-0016. Tear off and re-roof comp to comp 22 squares. In-progress inspection required if 10 sq or greater. CF-6R-ENV-01 required at final inspection. CF-1R-ALT on file. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314 Filed as: GREEN DAY POWER |
| 2704 21st Ave City of Sacramento · APN 019-0094-012-0000 | Plan revision / deferred submittal RES-2311508Portal ↗ | Applied Jun 6, 2023 | Complete | — | REVISION TO RES-2308307, LAYOUT CHANGE, NOT CHANGE TO EQUIMENT OR PROJECT VALUATION Filed as: GREEN DAY POWER |
| 2704 21st Ave City of Sacramento · APN 019-0094-012-0000 | Plan revision / deferred submittal COM-2311507Portal ↗ | Applied Jun 6, 2023 | Void | — | REVISION TO RES-2308307, LAYOUT CHANGE, NO CHANGE TO EQUIPMENT OR PROJECT VALUATION Filed as: GREEN DAY POWER |
| 1905 Waterford Rd City of Sacramento · APN 277-0232-015-0000 | Solar / battery storage RES-2310156Portal ↗ | Issued May 23, 2023 4d review | Void | $9,663 | 2.370kw Solar PV System, and 0gal Solar WH System (water heater installed null).All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” Filed as: GREEN DAY POWER |
| 2567 Amelia Earhart Ave City of Sacramento · APN 225-2550-177-0000 | Plan revision / deferred submittal RES-2310333Portal ↗ | Applied May 22, 2023 | Complete | $17,597 | REV TO RES-2306380. REVISED PLANS TO REFLECT SMUD METER SOCKET AND SLIGHT LAYOUT CHANGE. Filed as: GREEN DAY POWER |
| 2704 21st Ave City of Sacramento · APN 019-0094-012-0000 | Solar / battery storage RES-2308307Portal ↗ | Issued May 12, 2023 16d review | Finaled | $47,538 | 8.8kw Solar PV System, and 0gal Solar WH System (water heater installed null).All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). *See Revision RES-2311508, Layout change, no change to equipment or project valuation.* Filed as: GREEN DAY POWER |
| 2704 21st Ave City of Sacramento · APN 019-0094-012-0000 | Electrical / panel RES-2308146Portal ↗ | Issued Apr 25, 2023 0d review | Withdrawn | $47,538 | E-Permit: - Overhead service. Filed as: GREEN DAY POWER |
| 3969 Ionian Sea Ln City of Sacramento · APN 225-2520-057-0000 | Solar / battery storage RES-2306735Portal ↗ | Issued Apr 24, 2023 18d review | Finaled | $12,700 | 3.160kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” Filed as: GREEN DAY POWER |
| 2567 Amelia Earhart Ave City of Sacramento · APN 225-2550-177-0000 | Solar / battery storage RES-2306380Portal ↗ | Issued Apr 5, 2023 2d review | Finaled | $17,597 | 4.345kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). REV TO RES-2301033. REVISED PLANS TO REFLECT SMUD METER SOCKET AND SLIGHT LAYOUT CHANGE. Filed as: GREEN DAY POWER |
| 2432 5th Ave Unincorporated Marin · APN 177-240-22 | Solar / battery storage B33206Portal ↗ | Issued Apr 3, 2023 5d review | Issued | $40,849 | Roof Mount PV Solar 7.51kW with (19) Canadian Solar CS3N-395MS Modules & (1) SolarEdge SE5000H-US Inverter Filed as: GREEN DAY POWER |
| 2432 5th Ave Unincorporated Marin · APN 177-240-22 | Solar / battery storage B33205Portal ↗ | Issued Apr 3, 2023 5d review | Issued | $40,849 | Roof Mount PV Solar 4.740kW with (12) Canadian Solar CS3N-395MS Modules, 1) SolarEdge3800 H-US Inverter & (1) SolarEdge 10kW Battery Filed as: GREEN DAY POWER |
| 2432 5th Ave Unincorporated Marin · APN 177-240-22 | Roof replacement B33203Portal ↗ | Issued Apr 3, 2023 5d review | Issued | $15,000 | Reroof; Comp to Comp; 19 Squares — ReRoofing; With Electronic Inspection Filed as: GREEN DAY POWER |
| 2567 Amelia Earhart Ave City of Sacramento · APN 225-2550-177-0000 | Electrical / panel RES-2306218Portal ↗ | Issued Mar 29, 2023 0d review | Expired Permit | $17,597 | E-Permit: existing panel 225 Amps - Underground service. Filed as: GREEN DAY POWER |
| 148 Madison Ave Unincorporated Marin · APN 179-125-06 | Solar / battery storage B33134Portal ↗ | Issued Mar 24, 2023 0d review | Issued | $21,500 | Roof Mount PV Solar 5.530kW with (14) Canadian Solar CS3N-395MS Modules & (14) Enphase IQ8Plus Microinverters Filed as: GREEN DAY POWER |
| 150 Madison Ave Unincorporated Marin · APN 179-125-07 | Solar / battery storage B33133Portal ↗ | Issued Mar 24, 2023 0d review | Issued | $25,800 | Roof Mount PV Solar 6.715kW with (17) Canadian Solar CS3N-395MS Modules & (17) Enphase IQ8Plus Microinverters Filed as: GREEN DAY POWER |
| 5871 Shepard Ave City of Sacramento · APN 005-0201-022-0000 | Remodel / interior alteration RES-2304398Portal ↗ | Issued Mar 16, 2023 10d review | Finaled | $17,800 | INSTALL 22KW GENERATOR BACKUP SYSTEM. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION. Filed as: GREEN DAY POWER |
| 7512 Collingwood St City of Sacramento · APN 048-0122-006-0000 | Roof replacement RES-2304480Portal ↗ | Issued Mar 7, 2023 0d review | Finaled | $20,720 | E-Permit: Tear Off - Yes, Resheet - No, 1 layer(s), 28 squares of Composite Class A. In-progress inspection required if 10 squares or greater. Filed as: GREEN DAY POWER |
| 3038 56th St City of Sacramento · APN 015-0053-007-0000 | Solar / battery storage RES-2303163Portal ↗ | Issued Feb 27, 2023 11d review | Finaled | $12,600 | 2.8kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Filed as: GREEN DAY POWER |
| 73 Morning Sun Ave Unincorporated Marin · APN 048-212-06 | Solar / battery storage B32680Portal ↗ | Issued Feb 21, 2023 0d review | Issued | $32,400 | Roof Mount PV Solar 7.90kW with (20) Canadian Solar CS3N-395MS Modules & (20) Enphase IQ8Plus Microinverters Filed as: GREEN DAY POWER |
| 70 Indian Hill Rd Unincorporated Marin · APN 121-270-30 | Solar / battery storage B32332Portal ↗ | Issued Jan 20, 2023 0d review | Issued | $28,900 | Roof Mount PV Solar 8.690kW with (22) Canadian Solar CS3N-395MS Modules & (22) SolarEdge SE7600H-US Inverter. Filed as: GREEN DAY POWER |
| 1576 9th Ave City of Sacramento · APN 012-0371-008-0000 | Solar / battery storage RES-2300342Portal ↗ | Issued Jan 11, 2023 5d review | Finaled | $35,751 | 8.295kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Filed as: GREEN DAY POWER |