Active in City of Sacramento (63 permits)
Raw permit filing name: HEALD MECHANICAL
62 issued · 57 parcels
vs 13 prior 24m(−54%)
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Mar 25, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 41 | 40 | — | $471,770 | 0d (n=40) | 0d (0d p75) | Within typical range | |
| 12 | 12 | — | $26,700 | 0d (n=12) | 0d (0d p75) | Within typical range | |
| 10 | 10 | — | $120,180 | 0d (n=10) | 0d (0d p75) | Within typical range |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 7656 Roman Oak Way City of Sacramento · APN 031-0790-017-0000 | HVAC / heat pump RES-2605885Portal ↗ | Issued Mar 25, 2026 0d review | Finaled | $18,000 | No Duct Work Permitted. Change-out Split System (all-electric heat pump) to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 488 Hartnell Pl City of Sacramento · APN 295-0262-004-0000 | HVAC / heat pump RES-2601119Portal ↗ | Issued Jan 20, 2026 0d review | Finaled | $18,000 | No Duct Work Permitted. Change-out Split System (all-electric heat pump) to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 39 Michelson Ct City of Sacramento · APN 201-0400-056-0000 | HVAC / heat pump RES-2525736Portal ↗ | Issued Dec 8, 2025 0d review | Finaled | $15,000 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 1136 Spruce Tree Cir City of Sacramento · APN 031-0560-016-0000 | HVAC / heat pump RES-2524397Portal ↗ | Issued Nov 20, 2025 0d review | Finaled | $18,000 | No Duct Work Permitted. Change-out Split System (all-electric heat pump) to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 7427 Pocket Rd City of Sacramento · APN 031-0694-004-0000 | HVAC / heat pump RES-2504310Portal ↗ | Issued Mar 4, 2025 0d review | Finaled | $15,000 | No Duct Work Permitted. Change-out Split System (all-electric heat pump) to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 549 39th St City of Sacramento · APN 004-0233-021-0000 | HVAC / heat pump RES-2424618Portal ↗ | Issued Nov 7, 2024 0d review | Finaled | $14,000 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 4125 50th St City of Sacramento · APN 021-0111-004-0000 | HVAC / heat pump RES-2423308Portal ↗ | Issued Oct 23, 2024 0d review | Finaled | $6,200 | No Duct Work Permitted. Change-out Furnace Only (Split System) to Furnace Only (Split System). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 3163 B St City of Sacramento · APN 003-0062-006-0000 | HVAC / heat pump RES-2422052Portal ↗ | Issued Oct 8, 2024 0d review | Finaled | $20,000 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 1701 42nd St City of Sacramento · APN 008-0465-002-0000 | HVAC / heat pump RES-2406841Portal ↗ | Issued Apr 1, 2024 0d review | Finaled | $14,500 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 663 Rivercrest Dr City of Sacramento · APN 030-0490-017-0000 | HVAC / heat pump RES-2326690Portal ↗ | Issued Dec 15, 2023 0d review | Finaled | $15,500 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 5023 Stroman Ln City of Sacramento · APN 225-1540-046-0000 | HVAC / heat pump RES-2323257Portal ↗ | Issued Oct 31, 2023 0d review | Finaled | $14,000 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 5054 Brimley Way City of Sacramento · APN 225-1510-010-0000 | HVAC / heat pump RES-2320297Portal ↗ | Issued Sep 22, 2023 0d review | Finaled | $12,000 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 6 Yardis Ct City of Sacramento · APN 225-0790-045-0000 | Plumbing / water heater / sewer RES-2319131Portal ↗ | Issued Sep 8, 2023 0d review | Finaled | $2,500 | Change-out installation of Gas - 040 gallon to Gas - 040 gallon, located inside building, screening not required. Filed as: HEALD MECHANICAL |
| 3090 Stanhope Way City of Sacramento · APN 225-0590-076-0000 | HVAC / heat pump RES-2318144Portal ↗ | Issued Aug 25, 2023 0d review | Finaled | $11,000 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 6 Yardis Ct City of Sacramento · APN 225-0790-045-0000 | HVAC / heat pump RES-2318142Portal ↗ | Issued Aug 25, 2023 0d review | Finaled | $15,000 | Change-out w/new ducts Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 241 Tivoli Way City of Sacramento · APN 004-0066-017-0000 | Roof replacement RES-2315318Portal ↗ | Issued Jul 24, 2023 0d review | Finaled | $14,000 | No Duct Work Permitted. New install/New location Mini-Split System. A unit will be installed in a new location. This unit will be fully screened behind a solid fence or alternatively behind shrubs or buildings providing screening resulting in the unit not being visible from any street views. Roof top installations will be located on back roof slopes and below ridge lines, and not visible from street views. Filed as: HEALD MECHANICAL |
| 5631 Balboa Cir City of Sacramento · APN 005-0091-011-0000 | HVAC / heat pump RES-2308908Portal ↗ | Issued May 3, 2023 0d review | Finaled | $17,000 | Change-out w/new ducts Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 7445 Spicewood Dr City of Sacramento · APN 031-1040-073-0000 | Plumbing / water heater / sewer RES-2308644Portal ↗ | Issued May 1, 2023 0d review | Finaled | $2,200 | Change-out installation of Gas - 050 gallon to Gas - 040 gallon, located inside building, screening not required. Filed as: HEALD MECHANICAL |
| 840 Commons Dr City of Sacramento · APN 295-0401-015-0000 | HVAC / heat pump RES-2304410Portal ↗ | Issued Mar 6, 2023 0d review | Finaled | $12,000 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 2610 5th Ave City of Sacramento · APN 013-0211-002-0000 | HVAC / heat pump RES-2215699Portal ↗ | Issued Jul 25, 2022 0d review | Finaled | $9,800 | No Duct Work Permitted. Change-out Condenser/Coil Only (Split System) to Furnace Only (Split System). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 432 32nd St City of Sacramento · APN 003-0163-016-0000 | HVAC / heat pump RES-2126140Portal ↗ | Issued Dec 13, 2021 0d review | Finaled | $5,000 | No Duct Work Permitted. Change-out Split System to Furnace Only (Split System). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 47 Southlite Cir City of Sacramento · APN 030-0610-002-0000 | Plumbing / water heater / sewer RES-2118539Portal ↗ | Issued Aug 25, 2021 0d review | Finaled | $1,900 | Change-out installation of Gas - 075 gallon to Gas - 040 gallon, located inside building, screening not required. Filed as: HEALD MECHANICAL |
| 7445 Spicewood Dr City of Sacramento · APN 031-1040-073-0000 | HVAC / heat pump RES-2118054Portal ↗ | Issued Aug 18, 2021 0d review | Finaled | $9,000 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |
| 78 Summer Rim Cir City of Sacramento · APN 117-0340-031-0000 | Plumbing / water heater / sewer RES-2114187Portal ↗ | Issued Jun 30, 2021 0d review | Finaled | $2,400 | Change-out installation of Gas - 040 gallon to Gas - 040 gallon, located inside building, screening not required. Filed as: HEALD MECHANICAL |
| 1925 Bidwell Way City of Sacramento · APN 012-0232-031-0000 | Roof replacement RES-2111352Portal ↗ | Issued May 26, 2021 0d review | Finaled | $14,000 | Change-out w/new ducts Roof Mount to Roof Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: HEALD MECHANICAL |