Active in City of Sacramento (8 permits)
Raw permit filing name: INTERA HOMES
4 issued · 2 parcels
vs 0 prior 24m
7 construction/remodel
Sum of permit job values
Application → issuance
Latest: Sep 4, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 7 | 3 | — | $220,000 | 14d (n=3) | 69d (132d p75) | Faster than peer median | |
| 1 | 1 | — | $1,300 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 2515 48th Ave City of Sacramento · APN 036-0083-010-0000 | Electrical / panel RES-2619577Portal ↗ | Issued Sep 4, 2026 0d review | Finaled | $1,300 | E-Permit: existing panel 100 Amps - Overhead service, new main panel 100 Amps, Reuse Existing weather head/masthead work, main breaker replacement. Filed as: INTERA HOMES |
| 1017 Fremont Way City of Sacramento · APN 009-0361-013-0000 | New garage / accessory structure RES-2617622Portal ↗ | Applied Aug 13, 2026 | Ready-to-Issue | $50,000 | Build a 336SF detached unconditioned workout room in backyard with electrical. NON-HABITABLE NOT BE USED FOR SLEEPING PURPOSES, DO NOT ADDRESS. Carbon monoxide & Smoke alarms required. Reference CRC sections R310 & R311. ALL WORK SUBJECT TO FIELD INSPECTION. Filed as: INTERA HOMES |
| 2515 48th Ave City of Sacramento · APN 036-0083-010-0000 | New garage / accessory structure RES-2607590Portal ↗ | Issued May 1, 2026 14d review | Finaled | $30,000 | EPC - SHARED PLANS (3) Install a shed for Run electrical to the shed subpanel from the main panel of the existing house. Shared plans reviewed under RES-2607586 SHARED WITH RES-2607588 & RES-2607590 NON CONDITIONED NON HABITABLE DO NOT ADDRESS THIS BUILDING. Filed as: INTERA HOMES |
| 2515 48th Ave City of Sacramento · APN 036-0083-010-0000 | New garage / accessory structure RES-2607588Portal ↗ | Issued May 1, 2026 14d review | Finaled | $20,000 | EPC - SHARED PLANS (3) - Install a shed for a home art studio. Run electrical to the shed sub panel from the main panel of the existing house. Shared plans reviewed under RES-2607586 NON CONDITIONED NON HABITABLE DO NOT ADDRESS THIS RECORD. Filed as: INTERA HOMES |
| 2515 48th Ave City of Sacramento · APN 036-0083-010-0000 | New garage / accessory structure RES-2607586Portal ↗ | Issued May 1, 2026 14d review | Issued | $35,000 | EPC - SHARED PLANS (3) Install a shed for home office use with half bathroom. Run bathroom sewer line to main tie in, in rear of property. Run electrical to the shed subpanel from the main panel of the existing house. Shared plans reviewed under RES-2607586 SHARED WITH RES-2607588 & RES-260 NON CONDITIONED NON HABITABLE DO NOT ADDRESS THIS BUILDING. Filed as: INTERA HOMES |
| 2515 48th Ave City of Sacramento · APN 036-0083-010-0000 | New garage / accessory structure RES-2606431Portal ↗ | Applied Apr 1, 2026 | Withdrawn | $20,000 | EPC - SHARED PLANS (3) - SHED #3: Install a shed for office use. Run electrical to the shed sub panel from the main panel of the existing house. Shared plans reviewed under RES-2606425 Filed as: INTERA HOMES |
| 2515 48th Ave City of Sacramento · APN 036-0083-010-0000 | New garage / accessory structure RES-2606429Portal ↗ | Applied Apr 1, 2026 | Withdrawn | $30,000 | EPC - SHARED PLANS (3) - SHED #2: Install a shed for office use. Run electrical to the shed sub panel from the main panel of the existing house. Shared plans reviewed under RES-2606425 Filed as: INTERA HOMES |
| 2515 48th Ave City of Sacramento · APN 036-0083-010-0000 | New garage / accessory structure RES-2606425Portal ↗ | Applied Apr 1, 2026 | Withdrawn | $35,000 | EPC - SHARED PLANS (3) - SHED #1: Install a shed for office use with half bathroom. Run bathroom sewer line to main tie in, in rear of property. Run electrical to the shed subpanel from the main panel of the existing house. Shared plans reviewed under RES-2606425 Filed as: INTERA HOMES |