Active in City of Sacramento (9 permits)
Raw permit filing name: MFIB CA LLC
3 issued · 3 parcels
vs 6 prior 24m
3 construction/remodel
Sum of permit job values
Application → issuance
Latest: Oct 2, 2023
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 6 | 0 | — | — | — | 41d (93d p75) | — | |
| 3 | 3 | — | $1,482,921 | 40d (n=3) | 63d (119d p75) | Faster than peer median |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 2410 C St City of Sacramento · APN 003-0092-006-0000 | Plan revision / deferred submittal COM-2320961Portal ↗ | Applied Oct 2, 2023 | Complete | — | EPC. Revision to COM-2216472. ROOM WORK IS A ONE FOR ONE CHANGE OUT OF EQUIPMENT AND WILL RESULT IN NO ADDITIONAL LOADS. ATTACHED PLAN DIAGRAMS Filed as: MFIB CA LLC |
| 2517 C St City of Sacramento · APN 003-0095-045-0000 | Plan revision / deferred submittal COM-2319633Portal ↗ | Applied Sep 14, 2023 | Complete | — | EPC. Updating Drawings to reflect existing conditions. REVISED SHEET E3.0 SHOWING ELECTRICAL LOAD CALCULATIONS DEPICTING NO CHANGE IN LOADS ON THE BUILDING. THE LAUNDRY ROOM WORK IS A ONE FOR ONE CHANGE OUT OF EQUIPMENT AND WILL RESULT IN NO ADDITIONAL LOADS. ATTACHED PLAN DIAGRAMS SHOW EXISTING ELECTRICAL CONDITIONS. Filed as: MFIB CA LLC |
| 1215 D St City of Sacramento · APN 002-0082-021-0000 | Plan revision / deferred submittal COM-2319629Portal ↗ | Applied Sep 14, 2023 | Complete | — | EPC. Revision to COM-2206845. SHEET E3.0 SHOWING ELECTRICAL LOAD CALCULATIONS DEPICTING NO CHANGE IN LOADS ON THE BUILDING. THE LAUNDRY ROOM WORK IS A ONE FOR ONE CHANGE OUT OF EQUIPMENT AND WILL RESULT IN NO ADDITIONAL LOADS. ATTACHED PLAN DIAGRAMS SHOW EXISTING ELECTRICAL CONDITIONS. Filed as: MFIB CA LLC |
| 1215 D St City of Sacramento · APN 002-0082-021-0000 | Plan revision / deferred submittal COM-2311689Portal ↗ | Applied Jun 8, 2023 | Complete | — | EPC. Revision to COM-2206845 for updating accessible path of travel due to current site conditions. including laundry revisions and notes for no new electrical loads. Type V-B. OCC R-2. Filed as: MFIB CA LLC |
| 2410 C St City of Sacramento · APN 003-0092-006-0000 | Plan revision / deferred submittal COM-2302465Portal ↗ | Applied Feb 8, 2023 | Complete | — | EPC - Revision to COM-2216472. Updating accessible path or travel due to current site conditions. Including moving unit to opposite side of building, adding laundry equipment to each accessible unit. Filed as: MFIB CA LLC |
| 2517 C St City of Sacramento · APN 003-0095-045-0000 | Plan revision / deferred submittal COM-2302462Portal ↗ | Applied Feb 8, 2023 | Complete | — | EPC - Revision to COM-2216475. Revised accessible path, relocated accessible units and accessible laundry. Proposal to "flip" one accessible unit to opposite side of building. Laundry equipment to be added to each accessible unit. Filed as: MFIB CA LLC |
| 2517 C St City of Sacramento · APN 003-0095-045-0000 | Commercial tenant improvement COM-2216475Portal ↗ | Issued Sep 13, 2022 40d review | Finaled | $537,930 | AFFORDABLE HOUSING EXPEDITED - EPC - FULL SCOPE OF WORK ON SHEET G2.0. THE SCOPE OF WORK WILL INCLUDE INTERIOR RENOVATIONS OF THE 16 UNITS, EXTERIOR RENOVATIONS AND REPLACING COMPONENTS THAT ARE IN DISREPAIR, INCLUDING KITCHEN AND BATH REMODELS, LED LIGHT FIXTURES, AS WELL AS ENERGY EFFICIENT HVAC SYSTEMS AND INTERIOR RE-PIPING OF DOMESTIC LINES. EXTERIOR RENOVATIONS WILL INCLUDE MINOR REPAIRS TO EXISTING STUCCO, REPLACING WINDOWS, ROOF MEMBRANES, AND APPLYING NEW WATERPROOFING COATINGS ATEXTERIOR BALCONIES AND STAIR LANDINGS. THE SCOPE OF WORK INCLUDES UPGRADING TWO (2) EXISTING UNITS (10%) TO BE FULLY ACCESSIBLE FOR THE MOBILITY IMPAIRED AND UPGRADING ONE (1) EXISTING UNIT (4%) FOR THE AUDITORY/VISUAL IMPAIRED. THE RENOVATIONS WILL ALSO PROVIDE SITE UPGRADES SUCH AS NEW ACCESSIBLE ROUTES, AND UPGRADES TO THE EXISTING COMMON SPACES. THE REHAB WILL COMPLY WITH THE DESIGN STANDARDS OF THE 2021 CTCAC QAP. Filed as: MFIB CA LLC |
| 2410 C St City of Sacramento · APN 003-0092-006-0000 | Commercial tenant improvement COM-2216472Portal ↗ | Issued Sep 13, 2022 40d review | Finaled | $611,405 | AFFORDABLE HOUSING EPC - EXPEDITED - FULL SCOPE OF WORK ON SHEET G2.0. THE SCOPE OF WORK WILL INCLUDE INTERIOR RENOVATIONS OF THE 16 UNITS, EXTERIOR RENOVATIONS AND REPLACING COMPONENTS THAT ARE IN DISREPAIR, INCLUDING KITCHEN AND BATH REMODELS, LED LIGHT FIXTURES, AS WELL AS ENERGY EFFICIENT HVAC SYSTEMS AND INTERIOR RE-PIPING OF DOMESTIC LINES. EXTERIOR RENOVATIONS WILL INCLUDE MINOR REPAIRS TO EXISTING STUCCO, REPLACING WINDOWS, ROOF MEMBRANES, AND APPLYING NEW WATERPROOFING COATINGS ATEXTERIOR BALCONIES AND STAIR LANDINGS. THE SCOPE OF WORK INCLUDES UPGRADING TWO (2) EXISTING UNITS (10%) TO BE FULLY ACCESSIBLE FOR THE MOBILITY IMPAIRED AND UPGRADING ONE (1) EXISTING UNIT (4%) FOR THE AUDITORY/VISUAL IMPAIRED. THE RENOVATIONS WILL ALSO PROVIDE SITE UPGRADES SUCH AS NEWACCESSIBLE ROUTES, AND UPGRADES TO THE EXISTING COMMON SPACES. THE REHAB WILL COMPLY WITH THE DESIGN STANDARDS OF THE 2021 CTCAC QAP. Filed as: MFIB CA LLC |
| 1217 D St City of Sacramento · APN 002-0082-021-0000 | Commercial tenant improvement COM-2206846Portal ↗ | Issued Sep 13, 2022 167d review | Finaled | $333,586 | EXPEDITED - EPC. Part of shared plan set notated below. Interior and exterior renovations and replacing components that are in disrepair. Construction type VB, Occupancy R-2. Shared Plans: COM-2206845: 1215 D Street (plan review permit) COM-2206846: 1217 D Street THERE IS A TOTAL OF 2 BUILDINGS INCLUDING 23 UNITS WITH A MIX OF 19 ONE-BEDROOM AND 4 TWO-BEDROOMS UNITS. THE BUILDINGS ARE TWO STORY, SLAB ON GRADE WITH CONVENTIONAL WOOD FRAMING. THE FAÇADE CONSISTS OF CEMENT PLASTER STUCCO WITH PAINTED WOOD SIDING AND TRIM ACCENTS. AN EXISTING ONE-BEDROOM UNIT WILL BE CONVERTED INTO A COMMUNITY ROOM / LEASING OFFICE. THE SCOPE OF WORK WILL INCLUDE INTERIOR AND EXTERIOR RENOVATIONS AND REPLACING COMPONENTS THAT ARE IN DISREPAIR, INCLUDING KITCHEN AND BATH REMODELS, LED LIGHT FIXTURES, AS WELL AS ENERGY EFFICIENT HVAC SYSTEMS AND INTERIOR RE-PIPING OF DOMESTIC LINES. EXTERIOR RENOVATIONS WILL INCLUDE MINOR REPAIRS TO EXISTING STUCCO, REPLACING WINDOWS, ROOF MEMBRANES, AND APPLYING NEW WATERPROOFING COATINGS AT EXTERIOR BALCONIES AND STAIR LANDINGS. THE SCOPE OF WORK INCLUDES UPGRADING THREE (3) EXISTING UNITS (10%) TO BE FULLY ACCESSIBLE FOR THE MOBILITY IMPAIRED AND UPGRADING ONE (1) EXISTING UNITS (4%) FOR THE AUDITORY/VISUAL IMPAIRED. THE RENOVATIONS WILL ALSO PROVIDE NEW ACCESSIBLE ROUTES, AND UPGRADES TO THE EXISTING LEASING OFFICE AND COMMON SPACES. THE REHAB WILL COMPLY WITH THE DESIGN STANDARDS OF THE 2021 CTCAC QAP. Filed as: MFIB CA LLC |