Active in Unincorporated Marin (3 permits)
Raw permit filing name: NERD ENERGY
3 issued · 3 parcels
vs 1 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Jan 26, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in Unincorporated Marin (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 2 | 2 | — | $16,719 | 0d (n=2) | 0d (0d p75) | — | |
| 1 | 1 | — | $3,900 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 19 Mariele Dr Unincorporated Marin · APN 174-082-08 | EV charger B45625Portal ↗ | Issued Jan 26, 2026 0d review | Issued | $12,819 | 1) Remove the existing, unsafe 200A Zinsco Main Panel. Reusing the existing service mast and wires, install a 200A, "solar ready" main panel with 40 full sized spaces. 2) Install a 60 amp / 240 volt circuit from new main to Garage via conduit in attic. Add a 48-amp WallBox Pulsar Plus Smart Charger. 3) Remove and replace the unsafe F.P.E. sub-panel in the Entry Closet and flip 180 degrees to face a code compliant location. Add supplemental ground wire (EGC) from main panel to sub via attic. — New Circuits / Outlets, Service Upgrade, EV Charging Station Filed as: NERD ENERGY |
| 15 Knob Hill Rd Unincorporated Marin · APN 119-181-11 | Solar / battery storage B40390Portal ↗ | Issued Dec 3, 2024 0d review | Issued | $3,900 | Install a customer supplied Eco-Flow Smart Home Panel 2, compatible with Portable Battery Power Source(s) AND portable generator input. Panel includes BOTH battery ESS and MANUAL backup power capabilities. — New Circuits / Outlets Filed as: NERD ENERGY |
| 120 Montecito Rd Unincorporated Marin · APN 016-033-03 | EV charger B39589Portal ↗ | Issued Sep 24, 2024 0d review | Issued | $3,900 | Replace 100 Amp Zinsco Sub-Panel 1 for 1. Add 48A EVSE with load management. — EV Charging Station Filed as: NERD ENERGY |