Active in City of Sacramento (9 permits)
Raw permit filing name: PACIFIC BUILDERS CONSTRUCTION INC
8 issued · 8 parcels
vs 6 prior 24m
Includes 1 ADU permits
Sum of permit job values
Application → issuance
Latest: Jan 20, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 3 | 3 | 6 | $1,690,190 | 477d (n=3) | 184d (416d p75) | Above 75th pct turnaround | |
| 2 | 1 | — | $170,000 | — | 41d (93d p75) | — | |
| 1 | 1 | 1 | $140,000 | — | 97d (172d p75) | — | |
| 1 | 1 | — | $20,000 | — | 42d (83d p75) | — | |
| 1 | 1 | — | $120,000 | — | 63d (119d p75) | — | |
| 1 | 1 | — | $5,000 | — | 0d (0d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
1 units · $140,000 · 2 permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 1601 Broadway 200 City of Sacramento · APN 009-0264-024-0000 | Commercial tenant improvement COM-2503920Portal ↗ | Issued Jan 20, 2026 328d review | Issued | $120,000 | EPC - EXPEDITED - T.I. to convert (E) Restaurant to (N) Restaurant. Addition of Pony walls, electrical branch circuits, hot/cold water and Type I hood. (E) hvac and restrooms to remain. Filed as: PACIFIC BUILDERS CONSTRUCTION INC |
| 7384 Tisdale Way City of Sacramento · APN 049-0590-003-0000 | Addition (adds square footage) RES-2405036Portal ↗ | Issued Dec 16, 2024 284d review | Finaled | $20,000 | EPC - 2 SHARED PLANS - 468 SF attached patio cover. Shared plans reviewed under RES-2405030 Filed as: PACIFIC BUILDERS CONSTRUCTION INC |
| 7386 Tisdale Way City of Sacramento · APN 049-0590-003-0000 | Accessory dwelling unit (new or conversion) RES-2405030Portal ↗ | Issued Dec 16, 2024 284d review | Finaled | $140,000 1 units | EPC - 2 SHARED PLANS - Construction of 1 bed, 1 bath 699 SF Conditioned Space ADU, 10 SF utility closet.Fire Sprinklers. Solar Exempt. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” Shared plans reviewed under RES-2405030 Filed as: PACIFIC BUILDERS CONSTRUCTION INC |
| 3121 Melinda Way City of Sacramento · APN 049-0212-010-0000 | Roof replacement RES-2411461Portal ↗ | Issued May 27, 2024 0d review | Finaled | $5,000 | E-Permit: Tear Off - Yes, Resheet - Yes, 1 layer(s), 10 squares of 30yr Laminated Dimensional Composition. In-progress inspection required if 10 squares or greater. Filed as: PACIFIC BUILDERS CONSTRUCTION INC |
| 3040 58th St City of Sacramento | Plan revision / deferred submittal COM-2409398Portal ↗ | Applied Apr 30, 2024 | Complete | — | EPC - REV TO COM-2317303, Revisions to storm drain. Filed as: PACIFIC BUILDERS CONSTRUCTION INC |
| 3056 58th St City of Sacramento · APN 015-0061-037-0005 | New duplex / half-plex RES-2226917Portal ↗ | Issued Apr 5, 2024 477d review | Finaled | $563,397 2 units | EPC - Shared Plans (3): Construct 3 identical 3-story, two-family dwelling structures on a single lot. Duplex at 3056/3060 58th St. - PV Solar 7.56kW UNIT A (2 bed, 2.5 bath): 1st flr - 150.50sqft, 2nd flr - 557.99sqft, 3rd flr - 542.60sqft. Garage - 244.69sqft, Porch - 17sqft, 2nd flr balcony - 172sqft, 3rd flr balcony - 172sqft. UNIT B (3 bed, 2.5 bath): 1st flr - 416.66sqft, 2nd flr - 635.32sqft, 3rd flr - 552.59 sqft. Garage - 256.60sqft, Porch - 17.88sqft, Patio - 63sqft, 2nd flr balcony - 61.28sqft, 3rd flr balcony - 61.28 sqft. Carport - 314.06sqft Shared plans with RES-2226914, RES-2226916 Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” Shared plans reviewed under RES-2226914 REVISION RES-2420270 Change to SMUD solar share program instead of rooftop PV panels. Replacing electrical one-line diagram with corrected information. SEE REVISION RES-2514792: Revision from duplex to condo designation and APN for 3 issued permits with shared plans. RES-2226914 is the Primary, plan check record. RES-2226916 and RES-2226917 are secondary. Revision requested by Inspections. Filed as: PACIFIC BUILDERS CONSTRUCTION INC |
| 3048 58th St City of Sacramento · APN 015-0061-037-0003 | New duplex / half-plex RES-2226916Portal ↗ | Issued Apr 5, 2024 477d review | Finaled | $563,397 2 units | EPC - Shared Plans (3): Construct 3 identical 3-story, two-family dwelling structures on a single lot. Duplex at 3048/3052 58th St. - PV Solar 7.56kW UNIT A (2 bed, 2.5 bath): 1st flr - 150.50sqft, 2nd flr - 557.99sqft, 3rd flr - 542.60sqft. Garage - 244.69sqft, Porch - 17sqft, 2nd flr balcony - 172sqft, 3rd flr balcony - 172sqft. UNIT B (3 bed, 2.5 bath): 1st flr - 416.66sqft, 2nd flr - 635.32sqft, 3rd flr - 552.59 sqft. Garage - 256.60sqft, Porch - 17.88sqft, Patio - 63sqft, 2nd flr balcony - 61.28sqft, 3rd flr balcony - 61.28 sqft. Carport - 314.06sqft Shared plans with RES-2226914,the Primary record. RES-2226917, the other secondary record. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” Shared plans reviewed under RES-2226914 REVISION RES-2420270 Change to SMUD solar share program instead of rooftop PV panels Replacing electrical one-line diagram with corrected information. SEE REVISION RES-2514792 for APN Correction and Change to Condo structure label. Filed as: PACIFIC BUILDERS CONSTRUCTION INC |
| 3040 58th St City of Sacramento · APN 015-0061-037-0001 | New duplex / half-plex RES-2226914Portal ↗ | Issued Apr 5, 2024 477d review | Finaled | $563,397 2 units | EPC - Shared Plans (3): Construct 3 identical 3-story, two-family dwelling structures on a single lot. Duplex at 3040 & 3044 58th St. - PV Solar 7.56kW UNIT A (2 bed, 2.5 bath): 1st flr - 150.50sqft, 2nd flr - 557.99sqft, 3rd flr - 542.60sqft. Garage - 244.69sqft, Porch - 17sqft, 2nd flr balcony - 172sqft, 3rd flr balcony - 172sqft. UNIT B (3 bed, 2.5 bath): 1st flr - 416.66sqft, 2nd flr - 635.32sqft, 3rd flr - 552.59 sqft. Garage - 256.60sqft, Porch - 17.88sqft, Patio - 63sqft, 2nd flr balcony - 61.28sqft, 3rd flr balcony - 61.28 sqft. Carport - 314.06sqft Shared plans with RES-2226916, RES-2226917. THIS is the Primary Record. (RES-2226914) Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” Shared plans reviewed under RES-2226914 SEE REVISION RES-2420270 Change to SMUD solar share program instead of rooftop PV panels Replacing electrical one-line diagram with corrected information. SEE REVISION:EPC - Relocation of fire riser SEE REVISION RES-2514792: Revision from duplex to condo designation and APN for 3 issued permits with shared plans. RES-2226914 is the Primary, plan check record. RES-2226916 and RES-2226917 are secondary. Revision requested by Inspections.” Filed as: PACIFIC BUILDERS CONSTRUCTION INC |
| 3040 58th St City of Sacramento | Plan revision / deferred submittal COM-2317303Portal ↗ | Issued Mar 18, 2024 215d review | Finaled | $170,000 | EPC - Civil site improvements for the 3040 58th St project. Associated building permit number RES2226914. Scope of work includes private (onsite) civil site improvements for the 3-building, 6 condo development. Includes new site paving, underground storm drain, sewer, and water. Storm drain includes underground detention. A new trash enclosure at northwest corner. A new 6' panel wall will be built along the north property line. - PLNG-INSP SEE REVISION COM-2409398, Revisions to storm drain. SEE REVISION 2512843: Revisions to storm drain. Contractor installed storm drain per original plans, not Rev 1 plans. Changes hereon revert back to original design with some alterations. Filed as: PACIFIC BUILDERS CONSTRUCTION INC |