Active in City of Sacramento (22 permits)
Raw permit filing name: RPM DEVELOPMENT AND ENGINEERING LLC
22 issued · 14 parcels
vs 4 prior 24m
Includes 16 ADU permits
Sum of permit job values
Application → issuance
Latest: Jul 20, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 16 | 16 | 25 | $3,078,853 | 312d (n=16) | 97d (172d p75) | Above 75th pct turnaround | |
| 4 | 4 | 4 | $1,030,438 | 487d (n=4) | 45d (85d p75) | Above 75th pct turnaround | |
| 1 | 1 | 2 | $296,605 | — | 184d (416d p75) | — | |
| 1 | 1 | — | $12,000 | — | 0d (0d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
2 units · $363,812 · 1 permit
2 units · $200,530 · 2 permits
1 units · $101,910 · 2 permits
2 units · $203,776 · 1 permit
2 units · $197,810 · 1 permit
2 units · $197,810 · 1 permit
2 units · $197,810 · 1 permit
2 units · $197,810 · 1 permit
1 units · $120,000 · 2 permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 4590 Martin Luther King Jr Blvd City of Sacramento · APN 020-0275-007-0000 | Accessory dwelling unit (new or conversion) RES-2517268Portal ↗ | Issued Jul 20, 2026 339d review | Issued | $363,812 2 units | EXPEDITED - EPC - New 2-story Duplex w/ enrollment in SMUD SolarShares. Primary SFD: 1243-sqft 3-bed / 2-.5-bath dwelling w/ 242-sqft attached garage and 20-sqft porch. Attached ADU: 2-bed / 1.5-bath dwelling 834 sq ft. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Any new landscaping done on this property must be compliant with the City’s Water Efficient Landscape Ordinance 15.92. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 5247 Martin Luther King Jr Blvd City of Sacramento · APN 022-0300-019-0000 | Accessory dwelling unit (new or conversion) RES-2518985Portal ↗ | Issued Jul 17, 2026 311d review | Issued | $200,530 2 units | EPC - EXPEDITED - COMMERCIAL METER SETUP - NEW TWO STORY DUPLEX ADU - 1ST FLOOR UNIT 597 SQ FT - 2ND FLOOR UNIT 597 SQ FT , 20 SQ FT LANDING - TOTAL 1194 SQ. FT. WITH 2 BEDROOM AND 1 BATH. PV SOLAR EXEMPT. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” SEPARATE PERMIT TO BE ISSUED FOR NSFR UNDER RES-2518981 Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 5251 Martin Luther King Jr Blvd City of Sacramento · APN 022-0300-019-0000 | Accessory dwelling unit (new or conversion) RES-2518981Portal ↗ | Issued Jul 17, 2026 311d review | Issued | $259,774 1 units | EPC - EXPEDITED - COMMERCIAL METER SETUP - NEW TWO STORY CUSTOM RESIDENCE OF 1ST FLOOR 602 SQ FT , GARAGE 256 SQ FT AND PORCH 82 SQ FT , 2ND FLOOR 835 SQ FT = TOTAL 1436 SQ. FT. WITH 3 BEDROOM AND 2.5 BATH. SOLAR KW 2.20 KW. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” SEPARATE PERMIT TO BE ISSUED FOR DETACHED ADU DULPEX UNDER RES-2518985. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 3539 7th Ave City of Sacramento · APN 013-0292-039-0000 | Accessory dwelling unit (new or conversion) RES-2523993Portal ↗ | Issued Jul 14, 2026 239d review | Issued | $146,701 1 units | EPC - EXPEDITED - New detached garage with ADU above. ADU is 600 sq. ft. with 2 bedrooms and 1 bathroom. The garage is 564 sq. ft. WITH FIRE SPRINKLERS. Solar share program. SEE RES-2517965 for parcel Primary Dwelling. Expedited cycle days = 10, 7, 3, 3. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 3541 7th Ave City of Sacramento · APN 013-0292-039-0000 | Accessory dwelling unit (new or conversion) RES-2517965Portal ↗ | Issued Jul 14, 2026 322d review | Issued | $302,404 1 units | EPC - New custom 2-story 1,780 SF 3-bed / 3-bath home with office and 130-sqft Covered Patio The solar share program used for this project. Detached ADU / Garage on separate permit. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Any new landscaping done on this property must be compliant with the City’s Water Efficient Landscape Ordinance 15.92. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 2610 45th Ave City of Sacramento · APN 036-0063-002-0000 | Accessory dwelling unit (new or conversion) RES-2508104Portal ↗ | Issued Aug 21, 2025 121d review | Finaled | $186,450 2 units | EPC - EXPEDITED - CONSTRUCTION OF A 2-STORY DUPLEX ADU. 1ST FLOOR - 557 SQ.FT. WITH 1 BEDROOM AND 1 BATHROOM. 2ND FLOOR - 557 SQ.FT. WITH 1 BEDROOM AND 1 BATHROOM. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). All work subject to field inspections. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 2792 35th Ave City of Sacramento · APN 025-0191-009-0000 | Accessory dwelling unit (new or conversion) RES-2422465Portal ↗ | Issued Aug 7, 2025 300d review | Finaled | $202,516 2 units | EXPEDITED - EPC - (N) 1ST FLOOR 2 BED, 1 BATH ADU 598 SF (N) 2ND FLOOR 2 BED, 1 BATH ADU 598 SF TOTAL EXTERIOR SF FOR 2 ADU 1196 SF WATER HEATER CLOSET 26 SF 2ND FLOOR LANDING 19 SF Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). REVISION RES-2603849 - Relocate windows REVSION RES-2605413: W2 WINDOWS AT 1ST AND 2ND FLOOR MOVED TO EAST SIDE NORTH ELEVATION WINDOWS ON 1ST AND 2ND FLOOR HAVE BEEN REMOVED. ENERGY DOCS UPDATED. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 3258 Bozeman St City of Sacramento · APN 250-0314-003-0000 | New single-family home RES-2324153Portal ↗ | Issued Apr 24, 2025 528d review | Finaled | $256,026 1 units | EXPEDITED - EPC - NSFR 3 bed, 3 bath, 1437 sq. ft. 1st floor 602 sq. ft., 240 sq. ft. garage , 74 sq. ft. porch. 2nd floor 835 sq. ft. Participating in SMUD Solar Share Program Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 317 Fairbanks Ave City of Sacramento · APN 250-0314-001-0000 | Accessory dwelling unit (new or conversion) RES-2408914Portal ↗ | Issued Apr 21, 2025 362d review | Finaled | $197,810 2 units | EPC - EXPEDITED - New ADU duplex, 597SF each for a total of 1194 SF under same roofing. 2 bed, 1 bath each unit. Solar exempt. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). All work subject to field inspections. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 3260 Bozeman St City of Sacramento · APN 250-0314-004-0000 | Accessory dwelling unit (new or conversion) RES-2408970Portal ↗ | Issued Apr 18, 2025 358d review | Finaled | $197,810 2 units | EPC - EXPEDITED - New ADU duplex, 597SF each for a total of 1194 SF under same roofing. 2 bed, 1 bath each unit Solar exempt. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). All work subject to field inspections. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 3256 Bozeman St City of Sacramento · APN 250-0314-003-0000 | Accessory dwelling unit (new or conversion) RES-2408965Portal ↗ | Issued Apr 18, 2025 358d review | Finaled | $197,810 2 units | EPC - EXPEDITED - New ADU duplex, 597SF each for a total of 1194 SF under same roofing. 2 bed, 1 bath each unit Solar exempt. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). All work subject to field inspections. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 3252 Bozeman St City of Sacramento · APN 250-0314-002-0000 | Accessory dwelling unit (new or conversion) RES-2408956Portal ↗ | Issued Apr 18, 2025 358d review | Finaled | $197,810 2 units | EPC - EXPEDITED - New ADU duplex, 597SF each for a total of 1194 SF under same roofing. 2 bed, 1 bath each unit. Solar exempt. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). All work subject to field inspections. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 1402 Mcallister Ave City of Sacramento · APN 035-0083-001-0000 | Accessory dwelling unit (new or conversion) RES-2421964Portal ↗ | Issued Apr 15, 2025 190d review | Finaled | $120,000 1 units | EPC - EXPEDITED - New 413 SF 1 bd /1 ba detached ADU. PV Solar Exempt. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 6140 Ventura St City of Sacramento · APN 036-0024-011-0000 | Roof replacement RES-2506260Portal ↗ | Issued Mar 28, 2025 0d review | Finaled | $12,000 | HDB # 25-005628. Re-roof Aprox. 9 squares and Replace 1 bathroom window. Put the unpermitted room addition back to original condition. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 6207 Belleau Wood Ln City of Sacramento · APN 035-0083-001-0000 | Accessory dwelling unit (new or conversion) RES-2500777Portal ↗ | Issued Mar 28, 2025 74d review | Expired Permit | $97,830 1 units | EPC - EXPEDITED - Addition to existing house to create 1 bdrm / 1 bth ADU. New addition 280 sq. ft. New covered porch 28 sq. ft. Convert 405 sq. ft. of existing family room into kitchen for Unit #B. Total square footage for new ADU is 685. Kitchen remodeling and bathroom remodeling. Value for addition is $45,000 Value for remodeling $50,000. All electric. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. All work subject to field inspections. - PLNG-INSP SEE REVISION RES-2516779- The location of ADU change. Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 3250 Bozeman St City of Sacramento · APN 250-0314-001-0000 | New single-family home RES-2324332Portal ↗ | Issued Mar 14, 2025 486d review | Finaled | $257,088 1 units | EPC - EXPEDITED - New 1,768 sq. ft. 2-story single family home (3 bed, 2.5 bath) with an attached garage. All-Electric, participating in SMUD Solar Share Program. 1st floor: 602 sq. ft. // 2nd floor: 835 sq. ft. // Garage 256 sq. ft., Covered Porch; 75 sq. ft. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 3262 Bozeman St City of Sacramento · APN 250-0314-004-0000 | New single-family home RES-2324154Portal ↗ | Issued Mar 14, 2025 487d review | Finaled | $257,993 1 units | EXPEDITED - EPC - New Single-Family 3 bed, 3 bath residence. 1st floor 602 sf, 2nd floor 83 5sf, garage 240 sf, porch 131 sf. Participating in SMUD Solarshare Program. Carbon monoxide & smoke alarms required. Reference crc sections r315 & r314, water conserving fixtures are required to be installed throughout this residence per sb 407 (note: residences built after January 1, 1994, are exempt).” “Any new landscaping done on this property is to be in compliance with the city’s water efficient landscape ordinance 15.92.” Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 3254 Bozeman St City of Sacramento · APN 250-0314-002-0000 | New single-family home RES-2324124Portal ↗ | Issued Mar 14, 2025 487d review | Finaled | $259,330 1 units | EXPEDITED - EPC - New 3 bed, 3 bath two story residence. 1st Floor 602 sq. ft., Garage 256 sq. ft., 140 sq. ft. Porch 2nd Floor 835 sq. ft. 1437 sq. ft. of habitable space Participating in SMUD Solar Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 6315 Ventura St City of Sacramento · APN 036-0071-010-0000 | Accessory dwelling unit (new or conversion) RES-2318431Portal ↗ | Issued Jul 16, 2024 322d review | Finaled | $203,776 2 units | EPC - EXPEDITED - Duplex ADU- ADU#1-595 SQ.FT. COVERED PORCH- 89 SQ.FT. ADU#2-595 SQ.FT. COVERED PORCH- 89 SQ.FT. total - 1190 sq ft , porch 178 sq ft - PV Solar Exempt Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. All work subject to field inspections. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 6310 Ventura St 2 City of Sacramento · APN 036-0063-005-0000 | Accessory dwelling unit (new or conversion) RES-2318408Portal ↗ | Issued Jul 5, 2024 311d review | Finaled | $101,910 1 units | EXPEDITED - EPC - 2 bed, 1 bath 597 Sq Ft Detached ADU W/ 80 Sq Ft Porch. Solar Exempt. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 6310 Ventura St 1 City of Sacramento · APN 036-0063-005-0000 | Accessory dwelling unit (new or conversion) RES-2318334Portal ↗ | Issued Jul 5, 2024 312d review | Finaled | $101,910 1 units | EPC - 2 bed, 1 bath 597 Sq Ft Detached ADU W/ 80 Sq Ft Porch. Solar Exempt. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |
| 793 Lampasas Ave City of Sacramento · APN 263-0172-030-0000 | New duplex / half-plex RES-2127225Portal ↗ | Issued Dec 6, 2023 707d review | Finaled | $296,605 2 units | EXPEDITED - EPC - New 2 Story duplex. UNIT A: 1st Floor - 502sqft, 2nd Floor - 576sqft, Porch - 25sqft. UNIT B: 1st Floor - 440sqft, 2nd Floor - 470sqft, Porch - 25sqft. Total Habitable: 1988sqft. Solar Shares Program Participant Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” “Any new landscaping done on this property is to be in compliance with the City’s Water Efficient Landscape Ordinance 15.92.” Filed as: RPM DEVELOPMENT AND ENGINEERING LLC |