Active in City of Sacramento (5 permits) · Unincorporated Marin (1 permit)
Raw permit filing name: SLE CONSTRUCTION INC
3 issued · 4 parcels
vs 2 prior 24m
3 construction/remodel
Sum of permit job values
Application → issuance
Latest: Nov 15, 2023
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 3 | 0 | — | — | — | 41d (93d p75) | — | |
| 1 | 1 | — | $371,500 | — | 69d (132d p75) | — | |
| 1 | 1 | — | $100,000 | — | 42d (83d p75) | — | |
| 1 | 1 | — | $70,000 | — | 4d (21d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 8563 Elder Creek Rd City of Sacramento · APN 062-0050-082-0000 | Plan revision / deferred submittal COM-2324419Portal ↗ | Applied Nov 15, 2023 | Complete | — | EPC - REVISION TO COM-2303936: Plans revised to remove grading and re-use existing paving at PEMB. Footing configuration adjusted by Structural Engineer. Footings and bollards shown on Architectural plan. Filed as: SLE CONSTRUCTION INC |
| 8563 Elder Creek Rd City of Sacramento | New garage / accessory structure COM-2303936Portal ↗ | Issued Nov 6, 2023 251d review | Finaled | $371,500 | EPC - New 3500sqft (70'x50') pre-engineered metal S-1 shade structure on concrete slab & foundation with electrical outlets & lighting. Remove existing asphalt paving as needed to install new structure. Site development 4,999sqft. - PLNG-INSP Filed as: SLE CONSTRUCTION INC |
| 41 Morey Ave City of Sacramento · APN 250-0352-004-0000 | Plan revision / deferred submittal RES-2204409Portal ↗ | Applied Feb 28, 2022 | Complete | — | EPC - REVISION TO RES-2123912: 1. Location for backup generator is moving to the backyard and 2. Removal of post/beam and footing for non-structural wall. Filed as: SLE CONSTRUCTION INC |
| 41 Morey Ave City of Sacramento · APN 250-0352-004-0000 | Plan revision / deferred submittal RES-2204407Portal ↗ | Applied Feb 28, 2022 | Void | — | EPC - REVISION TO RES-2123912: 1. Location for backup generator is moving to the backyard. 2. removal of post/beam and footing for non-structural wall. Filed as: SLE CONSTRUCTION INC |
| 41 Morey Ave City of Sacramento · APN 250-0352-004-0000 | Addition (adds square footage) RES-2123912Portal ↗ | Issued Jan 4, 2022 56d review | Finaled | $100,000 | EPC - Remodel existing single family , Fire Sprinklered, residence to use as a residential care facility for (2) non-ambulatory and (2) ambulatory individuals; two new concrete ramps totaling 263 sf; (N) wood fencing; Backup Generator; (B-M-E-P-F); Water conserving fixtures required; smoke alarms and carbon monoxide detectors required. SEE REVISION RES-2204409: 1. Location for backup generator is moving to the backyard and 2. Removal of post/beam and footing for non-structural wall. Filed as: SLE CONSTRUCTION INC |
| 257 Blackstone Dr Unincorporated Marin · APN 164-222-04 | Remodel / interior alteration 160702Portal ↗ | Issued Feb 6, 2019 154d review | Issued | $70,000 | New Deck With Ramp. Struct Rmdl Whole House R3.1 T.D. 9/20/18 Filed as: SLE CONSTRUCTION INC |