Active in City of Sacramento (4 permits)
Raw permit filing name: SULLIANO CORPORATION
1 issued · 1 parcels
vs 1 prior 24m
2 construction/remodel
Sum of permit job values
Application → issuance
Latest: Apr 24, 2023
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 1 | 0 | — | $95,600 | — | 241d (334d p75) | — | |
| 1 | 1 | — | $150,000 | — | 42d (83d p75) | — | |
| 1 | 0 | — | $50,000 | — | 0d (0d p75) | — | |
| 1 | 0 | — | — | — | 41d (93d p75) | — |
Multi-permit and HCD housing projects linked to this builder's permits
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 6000 88th St City of Sacramento · APN 062-0060-103-0000 | Plan revision / deferred submittal COM-2308116Portal ↗ | Applied Apr 24, 2023 | Complete | — | EPC - REVISION TO COM-1921648: Removed bollards on floor plan that were not installed. Revised stairs on structural plans to match architectural and update structural details. Removed details pertaining to metal canopy on structural drawings that weren’t used since building plans were provided by metal building company. Filed as: SULLIANO CORPORATION |
| 6000 88th St City of Sacramento · APN 062-0060-103-0000 | Addition (adds square footage) COM-1921648Portal ↗ | Issued Sep 15, 2020 314d review | Finaled | $150,000 | EPC Submittal - Addition to Commercial Building - Addition of 3672 metal roof canopies. 1898sf canopy used to store new tank storage area (4) tanks at 25,000gal each with concrete containment. 1774sf canopy to cover transfer area.**** ****EPC - REVISION COM-2111003: DELTA 5 Revisions (Tankfarm): West Side Containment wall widened; Steel stairs moved to South End of Tankfarm; Adding a steel stair inside tankfarm to for the door; Tanks relocated to South of tankfarm; North side of containment aligned with existing bldg (gridline C); Northwest corner of containment re-angled; Truck transfer area moved to the WEST to align with western wall of containment area; (SEE revision checklist for other changes)** **SEE REVISION COM-2224211: Updated the lighting plan to show the correct number of light fixtures installed at the job site.** **SEE REVISION COM-2308116: Removed bollards on floor plan that were not installed. Revised stairs on structural plans to match architectural and update structural details. Removed details pertaining to metal canopy on structural drawings that weren’t used since building plans were provided by metal building company.** Filed as: SULLIANO CORPORATION |
| 6000 88th St City of Sacramento · APN 062-0060-103-0000 | New commercial / non-residential building COM-1906300Portal ↗ | Applied Apr 11, 2019 | Expired Application | $95,600 | EPC Submittal - Addition to Commercial Building - New Open Air Storage Containment area: New CMU wall with chain link fence / gate, & metal roof Filed as: SULLIANO CORPORATION |
| 6000 88th St City of Sacramento · APN 062-0060-103-0000 | Roof replacement COM-1906277Portal ↗ | Applied Apr 11, 2019 | Void | $50,000 | EPC Submittal - New Open Air Storage Containment area: New CMU wall with chain link fence / gate, & metal roof (2,000 SF) Filed as: SULLIANO CORPORATION |