Active in City of Sacramento (6 permits)
Raw permit filing name: SUN VALLEY CONSTRUCTION
4 issued · 3 parcels
vs 0 prior 24m
4 construction/remodel
Sum of permit job values
Application → issuance
Latest: Feb 17, 2021
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 3 | 3 | — | $1,323,078 | 93d (n=3) | 63d (119d p75) | Within typical range | |
| 2 | 0 | — | — | — | 41d (93d p75) | — | |
| 1 | 1 | — | $540,264 | — | 42d (83d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 5151 Franklin Blvd City of Sacramento · APN 022-0151-036-0000 | Commercial tenant improvement COM-2021162Portal ↗ | Issued Feb 17, 2021 93d review | Expired Permit | $694,708 | EPC - CANNABIS REMODEL OF 8078 SQ FT OF WAREHOUSE TO CANNABIS CULTIVATION. SEPERATECANNABIS REMODEL PERMIT TO BE ISSUED UNDER COM-2012534. THE NEW CULTIVATION BUILD-OUT CONSIST OF ELECTRICAL, MECHANICAL, PLUMBING, STRUCTURAL, FIRE SPRINKLER, ALARM & SIGNAL, AND LIFE SAFETY WORK. Co2 ENRICHMENT IS BEING USED IN THE FACILITY. EXTERIOR GROUND MOUNTED MECHANICAL EQUIPMENT IS BEING BEING ADDED TO EAST SIDE OF THE BUILDING. EQUIPMENT WILL BE LOCATED BEHIND SITE FENCES. NO OTHER MODIFICATIONS TO THE EXISTING SITE. - PLNG-INSP Filed as: SUN VALLEY CONSTRUCTION |
| 5151 Franklin Blvd City of Sacramento · APN 022-0151-036-0000 | Commercial tenant improvement COM-2012534Portal ↗ | Issued Jan 6, 2021 173d review | Expired Permit | $496,470 | EPC - 7638 SQ FT REMODEL OF AN EXISTING BUILDING to cannabis use . SCOPE OF WORK CONSIST OF ELECTRICAL, MECHANICAL, PLUMBING, STRUCTURAL, FIRE SPRINKLER, ALARM & SIGNAL, AND LIFE SAFETY. INTERIOR SPACES CONSIST OF VOLATILE EXTRACTION, PRODUCT PACKAGING, DISTRIBUTION, SECURED SHIPPING, OFFICE SPACE AND NEW ELECTRICAL ROOM. REMOVE EXISTING EXTERIOR EQUIPMENT IS EITHER PLACED AT GRADE OR ON A MECHANICAL PLATFORM AGAINST THE BUILDING WITH NEW SECURITY ENCLOSURE / SCREENS. SITE ENTRY GATE FOR ACCESS TO THE PUBLIC RIGHT OF WAY. - PLNG-INSP Filed as: SUN VALLEY CONSTRUCTION |
| 8838 Elder Creek Rd City of Sacramento · APN 064-0020-081-0013 | Plan revision / deferred submittal COM-1918131Portal ↗ | Applied Sep 23, 2019 | Complete | — | EXPEDITED 3,3,3 - revision to com-1813509 striping for new accessible parking stall Filed as: SUN VALLEY CONSTRUCTION |
| 8838 Elder Creek Rd City of Sacramento · APN 064-0020-081-0013 | Plan revision / deferred submittal COM-1904480Portal ↗ | Applied Mar 13, 2019 | Complete | — | Revision to COM-1813509- move two AC condenser units to exterior, change wall height to 12', change plant rack layout in veg room #2, 3, 4. Added drop down ceiling in storage room, added doorway to upstairs storage, change bathroom doors swing outward, specify the sizes of spacing of joist and beams in storage room and drying room Filed as: SUN VALLEY CONSTRUCTION |
| 8838 Elder Creek Rd City of Sacramento · APN 064-0020-081-0013 | Addition (adds square footage) COM-1813509Portal ↗ | Issued Jan 10, 2019 178d review | Expired Permit | $540,264 | convert existing 13200 sq ft warehouse/office space to cannabis cultivation and legalize 362 sq ft mezzanine area for storage. legalize 341 sq ft mezzanine storage area above clone room and vegetation room 3. additional work to include new partition walls, electrical, mechanical, plumbing and finishes. Co2 being proposed with permit - PLNG-INSP See revision COM-1904480 - move two AC condenser units to exterior, change wall height to 12', change plant rack layout in veg room #2, 3, 4. Added drop down ceiling in storage room, added doorway to upstairs storage, change bathroom doors swing outward, specify the sizes of spacing of joist and beams in storage room and drying room EXPEDITED - REVISION TO COM-1813509: Add T-bar ceiling details to the approved plans. revision - COM-1918131 new accessible parking stall crf 9-23-2019 Filed as: SUN VALLEY CONSTRUCTION |
| 2075 Fair Oaks Blvd 100 City of Sacramento | Commercial tenant improvement COM-1704701Portal ↗ | Issued Apr 27, 2017 30d review | Certificate of Occupancy | $131,900 | EXPEDITED - 1st Time Tenant Improvement: New partition walls, three new restrooms, wax rooms, break room and main floor area. Filed as: SUN VALLEY CONSTRUCTION |