Active in City of Sacramento (4 permits) · Unincorporated Marin (1 permit)
Raw permit filing name: SUNTERNAL CONSTRUCTION INC
4 issued · 4 parcels
vs 0 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Jul 1, 2022
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 4 | 4 | 1 | $93,900 | 6d (n=4) | 3d (8d p75) | Within typical range | |
| 1 | 0 | — | — | — | 41d (93d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 5061 Stoner Dr City of Sacramento · APN 023-0152-029-0000 | Solar / battery storage RES-2213824Portal ↗ | Issued Jul 1, 2022 2d review | Finaled | $15,000 | 3.55kw Solar PV System, and 0gal Solar WH System (water heater installed null).All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Filed as: SUNTERNAL CONSTRUCTION INC |
| 22 De Fer Cir City of Sacramento · APN 049-0440-008-0000 | Plan revision / deferred submittal RES-2211301Portal ↗ | Applied May 31, 2022 | Complete | — | Revision to Res-2206991-MPU from 125/100 to 200/125 Filed as: SUNTERNAL CONSTRUCTION INC |
| 18 Jefferson Ave Unincorporated Marin · APN 179-172-28 | Solar / battery storage 171360Portal ↗ | Issued May 6, 2022 11d review | Issued | $25,900 | 6.80kw Rooftop Photovotlaic - Express Filed as: SUNTERNAL CONSTRUCTION INC |
| 22 De Fer Cir City of Sacramento · APN 049-0440-008-0000 | Solar / battery storage RES-2206991Portal ↗ | Issued Apr 7, 2022 6d review | Finaled | $30,000 | 11.56kw Solar PV System, changing out existing 100amp service with 100amp main breaker to new 125amp service with 100amp main breaker. and 0gal Solar WH System (water heater installed null).All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” *** ( SEE Revision to Res-2206991-MPU from 125/100 to 200/125) *** Filed as: SUNTERNAL CONSTRUCTION INC |
| 740 La Contenta Way City of Sacramento · APN 031-0340-053-0000 | Solar / battery storage RES-2121649Portal ↗ | Issued Oct 12, 2021 5d review | Finaled | $23,000 1 units | 10.88kw Solar PV System, and 0gal Solar WH System (water heater installed null). Filed as: SUNTERNAL CONSTRUCTION INC |