Active in City of Sacramento (8 permits) · Unincorporated Marin (4 permits)
Raw permit filing name: SUSTAINABLE ENERGY SOLUTIONS INC
9 issued · 8 parcels
vs 8 prior 24m(−100%)
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Jul 28, 2023
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 6 | 6 | — | $267,518 | 1d (n=6) | 3d (8d p75) | Within typical range | |
| 3 | 0 | — | $18,200 | — | 41d (93d p75) | — | |
| 2 | 2 | — | $45,900 | 8d (n=2) | 0d (0d p75) | — | |
| 1 | 1 | — | $2,500 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 4340 U St City of Sacramento · APN 011-0123-001-0000 | Plan revision / deferred submittal RES-2315855Portal ↗ | Applied Jul 28, 2023 | Complete | — | REVISION TO RES-2304042 REVISED PLANS TO SHOW SMUD REQUIRED PV METER SOCK AND 15A PV BREAKER Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 3260 Foggy Bank Way City of Sacramento · APN 274-0590-021-0000 | Plan revision / deferred submittal RES-2310336Portal ↗ | Applied May 22, 2023 | Complete | — | REVISION TO RES-2307921. removed EV charger from scope of work Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 3260 Foggy Bank Way City of Sacramento · APN 274-0590-021-0000 | Solar / battery storage RES-2307921Portal ↗ | Issued May 1, 2023 10d review | Finaled | $67,619 | 9.6kw Solar PV System, ESS 10.08kWh, EV Charger and 0gal Solar WH System (water heater installed null). Including ATS with (N) 125A backup loads panel. All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). SEE REVISION RES-2310336.Removed EV charger from scope of work Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 4340 U St City of Sacramento · APN 011-0123-001-0000 | Plan revision / deferred submittal RES-2306193Portal ↗ | Applied Mar 29, 2023 | Complete | $18,200 | REVISION TO RES-2304042- The 60A AC disconnect has been changed to a 30A AC disconnect along with the wire size was changed from #8 to #10 as requested. The SMUD PV meter socket was removed as requested. Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 45 Riposto Pl City of Sacramento · APN 225-2470-024-0000 | Solar / battery storage RES-2304373Portal ↗ | Issued Mar 7, 2023 1d review | Finaled | $28,400 | 8.0kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 4340 U St City of Sacramento · APN 011-0123-001-0000 | Solar / battery storage RES-2304042Portal ↗ | Issued Mar 2, 2023 1d review | Finaled | $18,200 | 3.6kw Solar PV System, and 0gal Solar WH System (water heater installed null). REVISION TO RES-2304042 REVISED PLANS TO SHOW SMUD REQUIRED PV METER SOCK AND 15A PV BREAKER Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 2204 Mogan Ave City of Sacramento · APN 238-0201-088-0000 | Solar / battery storage RES-2225222Portal ↗ | Issued Nov 29, 2022 1d review | Finaled | $21,600 | 7.2kw Solar PV System, and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 3459 River Shoal Ave City of Sacramento · APN 274-0640-078-0000 | Roof replacement RES-2223228Portal ↗ | Issued Nov 17, 2022 16d review | Finaled | $22,400 | Roof Mount 4.4 KW. All supply side connections, main breaker change-out, and/or panel upgrade will require a second inspection. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 323 Laurel Ave Unincorporated Marin · APN 157-126-08 | Solar / battery storage B30713Portal ↗ | Issued Aug 12, 2022 0d review | Issued | $81,699 | Installation of a roof mount, 8.4kW PV system with two (2) batteries Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 254 Cleveland Ave Unincorporated Marin · APN 051-232-19 | Electrical / panel B30631Portal ↗ | Issued Aug 4, 2022 0d review | Issued | $2,500 | Main Panel Upgrade — Service Upgrade Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 254 Cleveland Ave Unincorporated Marin · APN 051-232-19 | Roof replacement B29929Portal ↗ | Issued Jun 2, 2022 0d review | Issued | $23,500 | Installation of a 6kW / Roof Mount (flat roof) / 15 Hanwha Q-cells Q.PEAK DUO BLK ML-G10.a+ 400 / No micro inverters / 1 POMCube capacity 20kwh / No MPU Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |
| 200 Wetmore Ln Unincorporated Marin · APN 106-170-10 | Solar / battery storage B29146Portal ↗ | Issued Mar 21, 2022 0d review | Issued | $50,000 | 14.4kW Roof mount PV 40 QCell 360's + IQ7+ Filed as: SUSTAINABLE ENERGY SOLUTIONS INC |