Active in City of Sacramento (6 permits)
Raw permit filing name: TAYLOR BILT CONSTRUCTION
6 issued · 4 parcels
vs 2 prior 24m
4 construction/remodel
Sum of permit job values
Application → issuance
Latest: May 2, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 3 | 3 | — | $205,000 | 18d (n=3) | 4d (21d p75) | Within typical range | |
| 2 | 2 | — | $11,500 | 0d (n=2) | 0d (0d p75) | — | |
| 1 | 1 | — | $250,000 | — | 42d (83d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 2609 Harkness St City of Sacramento · APN 009-0305-026-0000 | Electrical / panel RES-2508981Portal ↗ | Issued May 2, 2025 0d review | Finaled | $6,000 | Electric Panel Upgrade. AA: existing panel 200 Amps - Overhead service, new main panel 400 Amps, New Install weather head/masthead work, main breaker replacement. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Filed as: TAYLOR BILT CONSTRUCTION |
| 2609 Harkness St City of Sacramento · APN 009-0305-026-0000 | Addition (adds square footage) RES-2414040Portal ↗ | Issued Aug 19, 2024 54d review | Finaled | $250,000 | EXPEDITED - EPC - 95 SF ADDITION OF FAMILY ROOM ON 1ST FLOOR, 395 SF ADDITION OF BEDROOM, BATHROOM, AND OFFICE ON EXPANDED 2ND FLOOR. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314, Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt).” Filed as: TAYLOR BILT CONSTRUCTION |
| 2657 Castro Way City of Sacramento · APN 013-0043-013-0000 | Electrical / panel RES-2302276Portal ↗ | Issued Feb 7, 2023 0d review | Finaled | $5,500 | E-Permit: existing panel 200 Amps - Overhead service, new main panel 200 Amps, Reuse Existing weather head/masthead work, main breaker replacement. Filed as: TAYLOR BILT CONSTRUCTION |
| 2657 Castro Way City of Sacramento · APN 013-0043-013-0000 | Remodel / interior alteration RES-2219621Portal ↗ | Issued Oct 10, 2022 26d review | Finaled | $40,000 | EPC - Kitchen and Laundry Room Remodel to include countertops, cabinets, plumbing, floors. Replace one window. Add knee wall and new doorway opening. Filed as: TAYLOR BILT CONSTRUCTION |
| 1330 Grant Ln City of Sacramento · APN 016-0301-007-0000 | Remodel / interior alteration RES-2204391Portal ↗ | Issued Mar 15, 2022 15d review | Expired Permit | $45,000 | REMOVE ALL CABINETS, COUNTERTOPS, APPLIANCES,TILE FLOORING, AND REPLACE WITH NEW LIKE FOR LIKE, IN SAME LOCATIONS. NEW CABINETRY, COUNTERTOPS, BACKSPLASH, PLUMBING, APPLIANCES PER PLAN. SAME FOOTPRINT AS ORGINAL WITH MINOR MODIFICATIONS. NEW TILE FLOORING. Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994, are exempt). Filed as: TAYLOR BILT CONSTRUCTION |
| 1741 4th Ave City of Sacramento · APN 012-0131-015-0000 | Remodel / interior alteration RES-2017115Portal ↗ | Issued Oct 9, 2020 18d review | Finaled | $120,000 | EPC - INCLUDES DEMO OF EXISTING KITCHEN, BATHROOMS AND ALL INTERIOR PLASTER WALLS AND CEILINGS. REMODEL OF EXISTING KITCHEN TO INCLUDE NEW CABINETRY, FLOORING, APPLIANCES (OFCI), LIGHTING AND PLUMBING FIXTURES. REMODEL OF EXISTING BATHROOM TO INCLUDE NEW WALK IN SHOWER, PLUMBING FIXTURES, LIGHTING AND CABINETRY. EXPANSION OF AN EXISTING EXISTING HALF BATH INTO A FULL BATH WHICH INCLUDES ADDITION OF NEW SHOWER AND BATHTUB. DEMO OF ALL INTERIOR PLASTER WALLS TO BE REPLACED WITH NEW GYP BOARD. INCLUDES VAULTED CEILINGS AT THE LIVING SPACES AND NEW FRAMING PER EOR DRAWINGS. DEMO OF THE EXISTING ROOFING SYSTEM TO BE REPLACED WITH NEW COMPOSITE ROOFING SYSTEM. NO CHANGES TO EXTERIOR OF HOUSE OR SITE. Filed as: TAYLOR BILT CONSTRUCTION |