Active in City of Sacramento (6 permits)
Raw permit filing name: THERMOTECH SOLUTIONS INC
6 issued · 6 parcels
vs 3 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Sep 16, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 3 | 3 | — | $38,702 | 0d (n=3) | 0d (0d p75) | Within typical range | |
| 2 | 2 | — | $32,054 | 0d (n=2) | 0d (0d p75) | — | |
| 1 | 1 | — | $6,039 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 6005 Machado Way City of Sacramento · APN 029-0184-009-0000 | Plumbing / water heater / sewer RES-2519495Portal ↗ | Issued Sep 16, 2025 0d review | Finaled | $6,039 | Change-out installation of Gas - 050 gallon to Electric - 052 gallon, located inside building, screening not required. Filed as: THERMOTECH SOLUTIONS INC |
| 28 Nautica Ct City of Sacramento · APN 274-0550-015-0000 | HVAC / heat pump RES-2512888Portal ↗ | Issued Jun 19, 2025 0d review | Finaled | $18,502 | No Duct Work Permitted. Change-out Ground Mount to Ground Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: THERMOTECH SOLUTIONS INC |
| 2504 34th Ave City of Sacramento · APN 025-0153-019-0000 | Roof replacement RES-2510355Portal ↗ | Issued May 20, 2025 0d review | Finaled | $17,150 | No Duct Work Permitted. Change-out Roof Mount to Roof Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: THERMOTECH SOLUTIONS INC |
| 146 Cedro Cir City of Sacramento · APN 225-0612-037-0000 | HVAC / heat pump RES-2419083Portal ↗ | Issued Sep 20, 2024 24d review | Finaled | $11,000 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: THERMOTECH SOLUTIONS INC |
| 2228 15th Ave City of Sacramento · APN 018-0022-008-0000 | Roof replacement RES-2419796Portal ↗ | Issued Sep 6, 2024 0d review | Finaled | $14,904 | No Duct Work Permitted. New install/New location Split System. A unit will be installed in a new location. This unit will be fully screened behind a solid fence or alternatively behind shrubs or buildings providing screening resulting in the unit not being visible from any street views. Roof top installations will be located on back roof slopes and below ridge lines, and not visible from street views. Filed as: THERMOTECH SOLUTIONS INC |
| 776 El Macero Way City of Sacramento · APN 031-0340-040-0000 | HVAC / heat pump RES-2419082Portal ↗ | Issued Aug 27, 2024 0d review | Expired Permit | $9,200 | No Duct Work Permitted. Change-out Ground Mount to Ground Mount. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: THERMOTECH SOLUTIONS INC |