Active in City of Sacramento (2 permits)
Raw permit filing name: TITAN FIRE PROTECTION INC
2 issued · 2 parcels
vs 0 prior 24m
0 construction/remodel
Sum of permit job values
Application → issuance
Latest: Sep 17, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 2 | 2 | — | $19,120 | 20d (n=2) | 14d (29d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 3160 Folsom Blvd City of Sacramento · APN 007-0214-005-0000 | Fire alarm / sprinkler COM-2518211Portal ↗ | Issued Sep 17, 2025 20d review | Finaled | $9,560 | EPC - FIRE ALARM CELLULAR DIALER INSTALLATION: PROVIDE AND INSTALL A UL-LISTED CELLULAR DIALER TO INTERFACE WITH THE EXISTING FIRE ALARM CONTROL PANEL (FACP) AND ENABLE SIGNAL TRANSMISSION TO THE CENTRAL STATION. VERIFY COMPATIBILITY, CONFIRM PROPER COMMUNICATION, AND COORDINATE POWER CONNECTIONS AS REQUIRED. ALL WORK SHALL COMPLY WITH NFPA 72 (2022), LOCAL CODES, AND AHJ REQUIREMENTS. THE CONTRACTOR SHALL PERFORM FINAL TESTING, COMMISSION THE DIALER, AND PROVIDE DOCUMENTATION TO THE AHJ AND BUILDING OWNER. NO MODIFICATIONS TO EXISTING INITIATING OR NOTIFICATION CIRCUITS. Filed as: TITAN FIRE PROTECTION INC |
| 1315 Alhambra Blvd City of Sacramento · APN 007-0214-006-0000 | Fire alarm / sprinkler COM-2518210Portal ↗ | Issued Sep 17, 2025 20d review | Finaled | $9,560 | EPC - FIRE ALARM CELLULAR DIALER INSTALLATION: PROVIDE AND INSTALL A UL-LISTED CELLULAR DIALER TO INTERFACE WITH THE EXISTING FIRE ALARM CONTROL PANEL (FACP) AND ENABLE SIGNAL TRANSMISSION TO THE CENTRAL STATION. VERIFY COMPATIBILITY, CONFIRM PROPER COMMUNICATION, AND COORDINATE POWER CONNECTIONS AS REQUIRED. ALL WORK SHALL COMPLY WITH NFPA 72 (2022), LOCAL CODES, AND AHJ REQUIREMENTS. THE CONTRACTOR SHALL PERFORM FINAL TESTING, COMMISSION THE DIALER, AND PROVIDE DOCUMENTATION TO THE AHJ AND BUILDING OWNER. NO MODIFICATIONS TO EXISTING INITIATING OR NOTIFICATION CIRCUITS. Filed as: TITAN FIRE PROTECTION INC |