Active in City of Sacramento (17 permits)
Raw permit filing name: VASYL AC INC
16 issued · 15 parcels
vs 2 prior 24m
1 construction/remodel
Sum of permit job values
Application → issuance
Latest: Oct 15, 2026
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 12 | 11 | — | $165,259 | 0d (n=11) | 0d (0d p75) | Within typical range | |
| 3 | 3 | — | $46,573 | 0d (n=3) | 0d (0d p75) | Within typical range | |
| 1 | 1 | — | $15,788 | — | 4d (21d p75) | — | |
| 1 | 1 | — | $7,101 | — | 0d (0d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 8180 Signal Ct City of Sacramento · APN 038-0320-023-0000 | HVAC / heat pump COM-2623064Portal ↗ | Applied Oct 15, 2026 | Plan Check Target | $24,656 | Like-for-like replacement of existing commercial rooftop GAS package HVAC unit, conversion to Heat Pump. No change to circuits Filed as: VASYL AC INC |
| 7770 River Landing Dr City of Sacramento · APN 031-1360-048-0000 | HVAC / heat pump RES-2616863Portal ↗ | Issued Aug 5, 2026 0d review | Issued | $10,561 | Change-out Split System to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 380 Alcantar Cir City of Sacramento · APN 225-1640-074-0000 | HVAC / heat pump RES-2611386Portal ↗ | Issued Jun 2, 2026 0d review | Finaled | $12,000 | Change-out Split System to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 2823 Belle Fleur Way City of Sacramento · APN 225-1050-077-0000 | HVAC / heat pump RES-2604738Portal ↗ | Issued Mar 10, 2026 0d review | Finaled | $11,310 | Change-out Split System to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 2264 University Ave City of Sacramento · APN 295-0440-003-0000 | Roof replacement RES-2520956Portal ↗ | Issued Oct 3, 2025 0d review | Finaled | $12,090 | Change-out Roof Mount (all-electric heat pump) to Roof Mount (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 4112 57th St City of Sacramento · APN 021-0132-005-0000 | HVAC / heat pump RES-2520647Portal ↗ | Issued Oct 1, 2025 0d review | Finaled | $9,857 | Change-out Split System to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 1410 47th St City of Sacramento · APN 008-0333-003-0000 | HVAC / heat pump RES-2519883Portal ↗ | Issued Sep 21, 2025 0d review | Finaled | $23,150 | Like for like change out conversion of 2 HVAC systems from gas to electric. Change-out Split System to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314. All work subject to field inspection. Filed as: VASYL AC INC |
| 7427 Patero Cir City of Sacramento · APN 049-0411-019-0000 | HVAC / heat pump RES-2517672Portal ↗ | Issued Aug 21, 2025 0d review | Finaled | $8,790 | Change-out Split System to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 3430 River Shoal Ave City of Sacramento · APN 274-0640-094-0000 | HVAC / heat pump RES-2512129Portal ↗ | Issued Jun 11, 2025 0d review | Finaled | $12,770 | Change-out Split System to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 1921 26th St City of Sacramento · APN 010-0046-025-0000 | Remodel / interior alteration COM-2507898Portal ↗ | Issued May 27, 2025 39d review | Finaled | $15,788 | EPC - Window AC change-out for mini-split heat pumps at four units (Unit # 1,2,3,4) - PLNG-INSP Filed as: VASYL AC INC |
| 3783 Bilsted Way City of Sacramento · APN 225-1330-035-0000 | HVAC / heat pump RES-2508745Portal ↗ | Issued Apr 30, 2025 0d review | Finaled | $17,065 | Change-out Split System to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 111 Arches Cir City of Sacramento · APN 225-1470-004-0000 | HVAC / heat pump RES-2507937Portal ↗ | Issued Apr 18, 2025 0d review | Finaled | $8,790 | Change-out Split System to Split System (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 1306 36th St City of Sacramento · APN 007-0232-001-0000 | Roof replacement RES-2506537Portal ↗ | Issued Apr 2, 2025 0d review | Finaled | $21,048 | New install/New location Split System (all-electric heat pump). A unit will be installed in a new location. This unit will be fully screened behind a solid fence or alternatively behind shrubs or buildings providing screening resulting in the unit not being visible from any street views. Roof top installations will be located on back roof slopes and below ridge lines, and not visible from street views. Filed as: VASYL AC INC |
| 1306 36th St City of Sacramento · APN 007-0232-001-0000 | HVAC / heat pump RES-2506415Portal ↗ | Issued Apr 1, 2025 0d review | Finaled | $13,815 | Change-out Ground Mount (all-electric heat pump) to Ground Mount (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 5351 79th St City of Sacramento · APN 023-0282-016-0000 | Roof replacement RES-2504215Portal ↗ | Issued Mar 3, 2025 0d review | Finaled | $13,435 | Change-out Roof Mount to Roof Mount (all-electric heat pump). The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. Filed as: VASYL AC INC |
| 18 Minnow Ct City of Sacramento · APN 274-0600-033-0000 | HVAC / heat pump RES-2416745Portal ↗ | Issued Jul 30, 2024 1d review | Finaled | $12,495 | HVAC conversion gas to electric, using an existing 120V line in attic The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314 Filed as: VASYL AC INC |
| 5351 79th St City of Sacramento · APN 023-0282-016-0000 | Plumbing / water heater / sewer RES-2401636Portal ↗ | Issued Jan 22, 2024 0d review | Finaled | $7,101 | Change-out installation of Gas - 040 gallon to Electric - 052 gallon, located inside building, screening not required. Filed as: VASYL AC INC |