Active in City of Sacramento (2 permits)
Raw permit filing name: WATERMAN CONSTRUCTION
1 issued · 1 parcels
vs 0 prior 24m
1 construction/remodel
Sum of permit job values
Application → issuance
Latest: Oct 15, 2025
Where this builder's geocoded permits cluster
Compares this builder's median days from permit application to issuance against all peer permits in City of Sacramento (trailing 5-year benchmark).
| Permit Category | Permits | Issued | Units | Declared Valuation | Builder Median Review | City Median (75th pct) | Relative Pace |
|---|---|---|---|---|---|---|---|
| 1 | 1 | — | $50,000 | — | 63d (119d p75) | — | |
| 1 | 0 | — | — | — | 41d (93d p75) | — |
Click any address to open the full property dossier or inspect the official agency record
| Property / Parcel | Record & Category | Applied / Issued | Status | Valuation | Work Description & Raw Attribution |
|---|---|---|---|---|---|
| 2304 N St City of Sacramento · APN 007-0255-002-0000 | Plan revision / deferred submittal COM-2521706Portal ↗ | Applied Oct 15, 2025 | Complete | — | EPC - REV TO COM-2505890. Revision per the field inspection: Markup on field print showed missing existing beams in the floor system and marking the two SSU's to remain due to a pocket in the floor system: Beams and note were added to piping plan. The two SSU's were marked to remain as is. Office 6: SSP heads were new and remain as is. Hallway: SSPs were marked as new and to remain as is. The Heads located in Office 6 that were designed as demo'ed and relocated were revised to remain as is. The heads in the hallway were also designed to be relocated and demo'ed. Those were also revised to remain as is. Filed as: WATERMAN CONSTRUCTION |
| 2304 N St City of Sacramento · APN 007-0255-002-0000 | Commercial tenant improvement COM-2505890Portal ↗ | Issued Jun 2, 2025 69d review | Finaled | $50,000 | EXPEDITED - EPC - INTERIOR REMODEL INCLUDING: THE REMOVAL OF WALLS TO CREATE A LARGER LOBBY SPACE AND THE ADDITION OF A RESTROOM. SEE REVISION COM-2518489: Revision to the fire sprinkler plans. SEE REVISION COM-2521706: Revision per the field inspection: Markup on field print showed missing existing beams in the floor system and marking the two SSU's to remain due to a pocket in the floor system: Beams and note were added to piping plan. The two SSU's were marked to remain as is. Office 6: SSP heads were new and remain as is. Hallway: SSPs were marked as new and to remain as is. The Heads located in Office 6 that were designed as demo'ed and relocated were revised to remain as is. The heads in the hallway were also designed to be relocated and demo'ed. Those were also revised to remain as is. REVISION COM-2602620: Changing one ADA bathroom to non-ADA bathroom so that there is a total of 1 ADA compliant and 1 non-ADA compliant bathroom. Filed as: WATERMAN CONSTRUCTION |