605 Sunbeam Ave
Sacramento 95811 · Dos Rios Triangle · City of Sacramento · Coordinates: 38.59397, -121.47992
Executive Verdict · Public-Records Synthesis
Zoned C-2-SPD in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $200,000 ($170,000–$230,000).
Upsides & Opportunities
- ✓ 1 documented municipal building permit on file
On-parcel permit history is indexed through Jul 19, 2024, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: reduced flood risk due to levee)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! 5 slow or stalled nearby projects within ½ mile
Closest lead: River District Condon- Club House (0.29 mi NW, in review). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$2,730/yr at $200,000)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$228/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- 29,450 sq ft (0.68 ac)
- Assessor use:
- Vacant · Site (Under 2ac)
- Tax rate area:
- 03083
- Addresses on lot:
- 605 SUNBEAM AVE
Zoning & Land Use
C-2-SPD — General Commercial Zone (C)
2040 General Plan: Residential Mixed Use (FAR up to 4)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADUUnlikely
Zoned C-2 (commercial): the zone doesn't allow homes, so state ADU rules don't apply.
- SB 9: two homes on the lotUnlikely
Zoned C-2 (commercial), not a single-family residential zone.
- SB 9: split into two lotsUnlikely
Zoned C-2 (commercial), not a single-family residential zone.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: reduced flood risk due to levee (all of the lot) · FIRM panel 06067C0176J, effective June 16, 2015
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $170,000 – $230,000 · Status: Off market
HUD Small Area FMR (ZIP 95811) · FY 2026
Studio $1,840 · 1BR $1,930 · 2BR $2,380 · 3BR $3,170 · 4BR $3,650
Developments Deserving Closer Investigation & Active Area Builders
- River District Condon- Club House (In review)0.29 mi NW
In "In review" for 16 mo (since Jul 29, 2025), exceeding the 210d median and 365d 75th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (6 housing units, $988,717 declared valuation across 4 permits). current_status changed to "Plan Check Wait" in snapshot Nov 1, 2026.
- GD Site 200 (Fee estimate)0.29 mi S
In "Fee estimate" for 4.4 yr (since Jun 3, 2022), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (100 housing units, $16,250,000 declared valuation across 4 permits).
- 168 new homes at 701 Dos Rios St (Fee estimate)0.31 mi NW
In "Fee estimate" for 7.7 yr (since Mar 8, 2019), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (168 housing units, $35,000,000 declared valuation across 1 permit).
- Grower's District Multi-Family Site 215 (Entitled)0.32 mi S
In "Entitled" for 4.3 yr (since Jul 15, 2022), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (70 housing units, $10,346,547 declared valuation across 2 permits).
Entity-resolved builders & contractors in ½ mile: Frank Construction (1 on parcel, 1 in ½ mi · Electrical / panel); Midstate Construction (31 in ½ mi · New multifamily / condos / mixed-use); Quality Telecom Consultants (6 in ½ mi · Remodel / interior alteration); Jd Rodli Construction (5 in ½ mi · Commercial tenant improvement); Avanti Builders (4 in ½ mi · Commercial tenant improvement).
Permit & Project History on This Parcel (1 permits, 0 grouped projects)
| Record # | Category | Status | Applied / Issued | Valuation | Description |
|---|---|---|---|---|---|
| COM-2415900 | Electrical / panel | Finaled | Iss. Jul 19, 2024 | $3,500 | minor electrical permit for main service change-out, and repairs to existing load-side equipment per BI BHILL inspection… |