Retired / historical parcel number
Recorded at 246 6th St; 350 Stanford Ln; 400 Railyards Blvd · Records from 2021–2025
RAILYARDS: Central Shops at the Railyards - Paint Shop
EPC - Historic building renovation (Paint Shop) and associated site improvements (Central Shops Plaza) at the Railyards. Change of use from railyard paint shop to mixed-use public entertainment venue. Remodel to include building exterior restoration, raising a portion of the roof, modify loading dock, a central utility plant and associated site upgrades. Interior improvements to include an entertainment venue with support facilities. Per City Code 18.56.125, landmark designation exempts PIF/HTF/TDIF for renovation change of use; STA exempt per 18.48.080 (3). - see attached emails in pdf "Impact Fees Waived" (The Pavilion building under a separate review/permit COM-2226439). FIRE ALARM PLANS WILL BE ACCPTED AS A DEFERRED SUBMITTAL AS PER JASON LEE. - PLNG-INSP
Railyards: Sac Valley Station Tunnel
EPC- This project will construct a new intermodal access to the Sacramento Valley Station (SVS) within the proposed Central Shops Plaza at the Sacramento Railyards. The scope of work includes selective demolition of the existing egress stairwell, grading, drainage and site utility improvements, construction of a new staircase, accessible ramp with handrails, lighting, landscape, and perimeter retaining walls on Lot 22 of the Railyards Tentative Map (last revised January 19, 2022). The existing exterior stairs and portions of the existing exterior walls at the Central Tunnel North Entrance will be removed. The proposed improvements will join to the existing tunnel and tunnel walls to remain. A proposed drainage pump station will pump the storm water that collects in this area into the proposed storm drain system that serves the Railyards Central Shops. - PLNG-INSP
PHASED PERMIT- RAILYARDS: Central Shops at the Railyards - Paint Shop
EPC - PHASED PERMIT- This application is for a phased permit under approved record # COM-2223065. The work for this application includes demolition of interior slab, soil prep, exterior roll-up doors + 1 pair double doors removal only.
Railyard: Parking Lots
EPC - Permit is for three surface parking lots at the Sacramento Railyards to support operation of the Central Shops per the approved Railyards Development Agreement. Scope to include water tower up lighting. - PLNG-INSP
Railyards Car shop Temp Shoring & Stabilization
EPC - SHARED PLANS- This record is for the Railyards car shop. The project is for historic building temporary shoring and stabilization at the Railyards. Shared plans reviewed under COM-2313349
Railyards Paint shop Temp Shoring & Stabilization
EPC - SHARED PLANS- This record is for the Railyards paint shop. The project is for historic building temporary shoring and stabilization at the Railyards. Shared plans reviews includes COM-2313352.
Railyards: Lot 3 Telegrapher Retail
*********Application is withdrawn************** SHARED PLANS -EPC - Shared plan set. Site improvements and construction of 3 buildings. 475,619 total square feet with 20,742 landscape area. 1 five story, type IIIA, slab on grade, multifamily building. 1 five story, type IIA, slab on grade multifamily building wrapping a four level, type IA, parking garage. 1 single story, type VA, retail building. Project is designed as all-electric, which utility fees coming from Telegrapher, and the south corners of 5th and 6th street. Includes shared amenities and a pool within a centrally secured courtyard. For inspection purposes this permit is for the following: Cold shell 1 story, retail building, type VB, occupancy A-2. 4,000 sqft. Permits under this shared plans set: COM-2226659: East Building and Site Work (plan review permit) COM-2226663: West Building COM-2226665: Retail Building - PLNG-INSP
Railyards: Lot 3 Telegrapher West Building
SHARED PLANS - MULTI-FAMILY HOUSING - EPC. Shared plan set. Site improvements and construction of 3 buildings. 475,619 total square feet with 20,742 landscape area. 1 five story, type IIIA, slab on grade, multifamily building. 1 five story, type IIA, slab on grade multifamily building wrapping a four level, type IA, parking garage. Project is designed as all-electric, which utility fees coming from Telegrapher, and the south corners of 5th and 6th street. Includes shared amenities and a pool within a centrally secured courtyard. For inspection purposes this permit is for the following: West Building. 153,077 sqft. Type VA, Occupancy R-2. five story slab on grade multifamily building. Permits under this shared plans set: COM-2226659: East Building and Site Work (plan review permit) COM-2226663: West Building - PLNG-INSP
Shared Plans - Railyards: Lot 3 Telegrapher East Building and Site Work
MULTI-FAMILY HOUSING - EPC. Two (2) New 4-Story Buildings and site work. (25-20-15). The East building (255,006 sf) is a Type V-A residential building wrapped around a Type I-A parking structure. The West Building (133,324 sf) is Type V-A residential and amenity building. For inspection purposes this permit is for the following: Site improvements and construction of East Building and site work. Permits under shared plans set: COM-2226659: East Building and Site Work (plan review permit) COM-2226663: West Building - PLNG-INSP
ESTIMATE - Utility Plant Yard - Railyard Lot 21c
EPC - One single story non-occupied CMU building 726 sf (U occupancy) with steel framed roof and masonry enclosed yard intended to house Central Utility Plant for the Paint Shop building (Paint Shop fee request under separate cover). The building will house boiler and pumps, the yard will house the chillers that will support the hydronic HVAC system as well as the main electrical service for the adjacent Paint Shop building. The central utility plant area (yard and building) is located across a private use drive, under which all lines (electrical conduit and HW/CW supply) will be run underground between the Central Utility Plant and the Paint Shop. - PLNG-INSP
ESTIMATE - Pavilion - Railyard Lot 19
EPC - New single story retail pavilion (Occupancy A-2), constructed using prefab metal building structure. Scope will include a new common area restroom core and utility rooms, enclosing the pavilion in storefront and exterior wall materials. The interior of the space is speculative at this time and will be constructed to a cold shell with a rooftop platform for future HVAC units to be installed at the time of TI. The building will include fire sprinklers, exterior lighting, plumbing infrastructure (underground and overhead installation of main trunk and supply lines) and electrical up to panels for future tenant improvement use. - PLNG-INSP
ESTIMATE - Live Nation - Railyard Lot 20
Retrofit of existing two story historic Paint Shop building. Scope includes exterior improvements (brick repair and re-pointing, new roof, awnings, storefront doors and repair of existing windows/doors) as well as a tenant improvement conversion of first floor from warehouse (S1/S2 occupancy) to new live concert venue (A2 occupancy), including all support spaces (bars, kitchens, restrooms, lobby, music hall, electrical rooms, coolers, office/admin support, storage, fixed seating and dressing rooms). The ground floor will also include some small speculative retail spaces meant to support and engage the overall plaza and two speculative restaurant/bar spaces. Limited site work is included with this scope to address ramps, stairs, access, and outdoor seating areas to the north, but the remainder of site improvements are not included with this phase of the project. The second floor (existing office use) will be retrofitted for for future, speculative office with a new elevator and stairs. A new hydronic HVAC system will be added (central plant building covered under separate fee request attached) including mezzanines, air handlers and full distribution, as well as new lighting and power, fire sprinklers and plumbing infrastructure. The entire building will be structurally retrofitted to current code standards. - PLNG-INSP
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN as recorded on the permit) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · The city publishes current status without a date, so status changes are dated by the window between our snapshots.
APN 002-0010-083-0000 · 2 permits matched by address and location
APN 002-0300-017-0000 · 2 permits matched by address and location
Matched by checking which current parcel holds each permit's mapped point, or carries its street address. This is our inference, not an official County lineage record.
Source: Sacramento County GIS, Parcels · Geography: current parcel polygons · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Search by parcel number 002-0010-075-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
County systems may not return results for a retired number. If so, use a current parcel listed above. Most recent record here: Dec 15, 2025.