2304 F St
Sacramento 95816 · Boulevard Park · City of Sacramento · Coordinates: 38.57970, -121.47376
Executive Verdict · Public-Records Synthesis
Zoned R-1B-SPD in City of Sacramento with likely ministerial ADU eligibility and zero mapped flood, fire, or fault hazard overlaps; benchmark value $878,000 ($773,000–$983,000).
Upsides & Opportunities
- ✓ Ministerial ADU / JADU pathway likely eligible
Zone R-1B-SPD allows residential use qualifying for ministerial ADU review under state law (7 ADU permits permitted within ¼ mile in 36 months).
Source: City of Sacramento zoning · CA Gov. Code 66314
- ✓ 7 documented municipal building permits on file
On-parcel permit history is indexed through Jun 30, 2023, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: reduced flood risk due to levee)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! 6 slow or stalled nearby projects within ½ mile
Closest lead: 23rd & F Street - Mixed Use Apartments (360 ft NW, in review). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$10,459/yr at $878,000)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$872/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- 3,049 sq ft (0.07 ac)
- Assessor use:
- Residential · Two Family · Duplex
- Tax rate area:
- 03005
- Addresses on lot:
- 2304 F ST; 2306 F ST
Zoning & Land Use
R-1B-SPD — Single-Unit or Duplex Dwelling Zone (R)
2040 General Plan: Residential Mixed Use (FAR up to 4)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADULikely eligible
Zoned R-1B (two-family residential): state law allows ADUs where homes are allowed.
- SB 9: two homes on the lotCan't tell
Zoned R-1B (two-family residential): we can't tell whether it counts as a single-family zone for SB 9. Single-Unit or Duplex Dwelling Zone.
- SB 9: split into two lotsCan't tell
Zoned R-1B (two-family residential): we can't tell whether it counts as a single-family zone for SB 9. Single-Unit or Duplex Dwelling Zone.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: reduced flood risk due to levee (all of the lot) · FIRM panel 06067C0180J, effective June 16, 2015
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $773,000 – $983,000 · Status: Off market
HUD Small Area FMR (ZIP 95816) · FY 2026
Studio $2,120 · 1BR $2,220 · 2BR $2,730 · 3BR $3,630 · 4BR $4,190
Developments Deserving Closer Investigation & Active Area Builders
- 23rd & F Street - Mixed Use Apartments (In review)360 ft NW
In "In review" for 2.7 yr (since Mar 6, 2024), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (33 housing units, $2,961,763 declared valuation across 1 permit).
- 2101 J Mixed Use (Entitled)0.32 mi SW
In "Entitled" for 3.9 yr (since Jan 5, 2023), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (40 housing units, $11,357,445 declared valuation across 2 permits).
- Democracy Alley Residences (Entitled)0.44 mi E
In "Entitled" for 2.4 yr (since Jun 20, 2024), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (10 housing units across 0 permits).
- Equipment Building, fiber-optic (Issued)0.38 mi NE
Active in "Issued" for 21 mo (first record Feb 7, 2025) with no new permit activity recorded in 13 mo. current_status changed to "Expired Permit" in snapshot Nov 1, 2026.
Entity-resolved builders & contractors in ½ mile: Sunpower (2 on parcel, 2 in ½ mi · Solar / battery storage); Superior Solar (1 on parcel, 1 in ½ mi · Solar / battery storage); Davis Reed Construction (24 in ½ mi · New commercial / non-residential building); Mack Construction (11 in ½ mi · Addition (adds square footage)); West Fork Construction (9 in ½ mi · Commercial tenant improvement).
Permit & Project History on This Parcel (7 permits, 1 grouped projects)
| Record # | Category | Status | Applied / Issued | Valuation | Description |
|---|---|---|---|---|---|
| RES-2313519 | Plan revision / deferred submittal | Complete | App. Jun 30, 2023 | — | EPC - REVISION TO RES-2110390 1. Revised the electrical panels to 200A with a 100A service from SMUD. 2. Revised the s… |
| RES-2301007 | Solar / battery storage | Void | App. Jan 18, 2023 | $8,942 | 2.5kw Solar PV System, and 0gal Solar WH System (water heater installed null). |
| RES-2210886 | Plan revision / deferred submittal | Complete | App. May 24, 2022 | — | EPC - revision to RES-2110390 provided truss calc package. missing from issued documents |
| RES-2110390 | New duplex / half-plex | Finaled | Iss. Feb 7, 2022 |