908 23rd St
Sacramento 95816 · Boulevard Park · City of Sacramento · Coordinates: 38.57647, -121.47584
Executive Verdict · Public-Records Synthesis
Zoned R-3A-SPD in City of Sacramento with likely ministerial ADU eligibility and zero mapped flood, fire, or fault hazard overlaps; benchmark value $656,000 ($577,000–$735,000).
Upsides & Opportunities
- ✓ Ministerial ADU / JADU pathway likely eligible
Zone R-3A-SPD allows residential use qualifying for ministerial ADU review under state law (7 ADU permits permitted within ¼ mile in 36 months).
Source: City of Sacramento zoning · CA Gov. Code 66314
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: reduced flood risk due to levee)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! 6 slow or stalled nearby projects within ½ mile
Closest lead: 2101 J Mixed Use (0.13 mi W, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$7,928/yr at $656,000)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$661/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- 1,526 sq ft (0.04 ac)
- Assessor use:
- Residential · Single Family · Planned Unit Development
- Tax rate area:
- 03005
- Addresses on lot:
- 908 23RD ST
Zoning & Land Use
R-3A-SPD — Multi-Unit Dwelling Zone (R)
2040 General Plan: Neighborhood (FAR up to 2)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADULikely eligible
Zoned R-3A (multifamily residential): state law allows ADUs where homes are allowed. On a multifamily lot the state allowance is different: ADUs in non-living space of the building, plus up to eight detached ADUs.
- SB 9: two homes on the lotUnlikely
Zoned R-3A (multifamily residential), not a single-family residential zone.
- SB 9: split into two lotsUnlikely
Zoned R-3A (multifamily residential), not a single-family residential zone.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: reduced flood risk due to levee (all of the lot) · FIRM panel 06067C0180J, effective June 16, 2015
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $577,000 – $735,000 · Status: Off market
HUD Small Area FMR (ZIP 95816) · FY 2026
Studio $2,120 · 1BR $2,220 · 2BR $2,730 · 3BR $3,630 · 4BR $4,190
Developments Deserving Closer Investigation & Active Area Builders
- 2101 J Mixed Use (Entitled)0.13 mi W
In "Entitled" for 3.9 yr (since Jan 5, 2023), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (40 housing units, $11,357,445 declared valuation across 2 permits).
- 23rd & F Street - Mixed Use Apartments (In review)0.29 mi N
In "In review" for 2.7 yr (since Mar 6, 2024), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (33 housing units, $2,961,763 declared valuation across 1 permit).
- Juno Mixed-Use (In review)0.46 mi W
In "In review" for 9.6 yr (since Apr 18, 2017), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (198 housing units, $55,118,716 declared valuation across 11 permits).
- K St Hotel (Fee estimate)0.44 mi W
In "Fee estimate" for 3.8 yr (since Feb 1, 2023), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($14,597,000 declared valuation across 2 permits).
Entity-resolved builders & contractors in ½ mile: Davis Reed Construction (24 in ½ mi · New commercial / non-residential building); Wfc Builders (17 in ½ mi · Commercial tenant improvement); Jeff Gunnell Construction (15 in ½ mi · Commercial tenant improvement); West Fork Construction (12 in ½ mi · Commercial tenant improvement); Mack Construction (12 in ½ mi · Addition (adds square footage)).
Permit & Project History on This Parcel (0 permits, 0 grouped projects)
No building permits recorded on this parcel in our dataset.