930 S St
Sacramento 95811 · Southside Park · City of Sacramento · Coordinates: 38.57025, -121.49815
Executive Verdict · Public-Records Synthesis
Zoned C-2-SPD in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $591,000 ($520,000–$662,000).
Upsides & Opportunities
- ✓ 3 documented municipal building permits on file
On-parcel permit history is indexed through Apr 29, 2024, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
- ✓ Above-average reinvestment in Southside Park
33 substantial renovation & housing permits over 24 months (47.4 per 1,000 parcels vs. 30.4 citywide baseline) (#18 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Southside Park)
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: reduced flood risk due to levee)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! 6 slow or stalled nearby projects within ½ mile
Closest lead: Sakura Apartments - Affordable Housing Mixed Use (0.48 mi SE, issued). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$7,187/yr at $591,000)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$599/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- 7,535 sq ft (0.17 ac)
- Assessor use:
- Retail / Commercial · Small Retail · Single Tenant
- Tax rate area:
- 03005
- Addresses on lot:
- 930 S ST
Zoning & Land Use
C-2-SPD — General Commercial Zone (C)
2040 General Plan: Residential Mixed Use (FAR up to 4)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADUUnlikely
Zoned C-2 (commercial): the zone doesn't allow homes, so state ADU rules don't apply.
- SB 9: two homes on the lotUnlikely
Zoned C-2 (commercial), not a single-family residential zone.
- SB 9: split into two lotsUnlikely
Zoned C-2 (commercial), not a single-family residential zone.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: reduced flood risk due to levee (all of the lot) · FIRM panel 06067C0180J, effective June 16, 2015
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $520,000 – $662,000 · Status: Off market
HUD Small Area FMR (ZIP 95811) · FY 2026
Studio $1,840 · 1BR $1,930 · 2BR $2,380 · 3BR $3,170 · 4BR $3,650
Developments Deserving Closer Investigation & Active Area Builders
- Sakura Apartments - Affordable Housing Mixed Use (Issued)0.48 mi SE
Active in "Issued" for 2.8 yr (first record Jan 29, 2024) with no new permit activity recorded in 15 mo. High-impact scale (134 housing units, 133 deed-restricted affordable, $16,753,756 declared valuation across 25 permits). current_status changed to "Process Wait" in snapshot Nov 1, 2026.
- 10th & R Mixed Use (Entitled)470 ft NE
In "Entitled" for 2.7 yr (since Feb 29, 2024), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (27 housing units, $7,500,000 declared valuation across 1 permit).
- 2401 13th St. Apartment Complex (Fee estimate)0.48 mi S
In "Fee estimate" for 21 mo (since Feb 11, 2025), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (15 housing units, $2,450,000 declared valuation across 1 permit).
- The Monarch - 805 R ST State Building (Issued)0.14 mi N
Active in "Issued" for 3.9 yr (first record Dec 13, 2022) with no new permit activity recorded in 19 mo. High-impact scale (241 housing units, 239 deed-restricted affordable, $33,544,000 declared valuation across 13 permits).
Entity-resolved builders & contractors in ½ mile: Bhandal Construction (3 on parcel, 3 in ½ mi · Plan revision / deferred submittal); Icon General Contractors (30 in ½ mi · Commercial tenant improvement); Indie Capital Constructors (29 in ½ mi · New duplex / half-plex); Marketone Builders (20 in ½ mi · Commercial tenant improvement); Reynen And Bardis Homes (14 in ½ mi · New single-family home).
Permit & Project History on This Parcel (3 permits, 0 grouped projects)
| Record # | Category | Status | Applied / Issued | Valuation | Description |
|---|---|---|---|---|---|
| COM-2409181 | Plan revision / deferred submittal | Complete | App. Apr 29, 2024 | — | EPC - REV TO COM-2225342. Field revisions (Electrical) per site conditions. |
| COM-2323023 | Plan revision / deferred submittal | Complete | App. Oct 27, 2023 | — | EPC - Revisions per Environmental Health Dept. Changes to back room, #105, including sink waste and water connection, eq… |
| COM-2225342 | Commercial tenant improvement | Finaled | Iss. Feb 28, 2023 | $70,000 | EPC - interior remodel of an existing 3500 sq.ft. neighborhood market to include modifying ceiling, electrical, and plum… |