Retired / historical parcel number
Recorded at 2115 6th St · Records from 2017–2018
EVgo Southside Park
Permit for on site only, no parking or street work. Construction of a new 744 sq. ft. equipment enclosure walls only no roof, construction of 3 concrete dispensing islands, installation of 3 electrical chargers and all associated appurtenances. New electrical service. - PLNG-INSP
South Side Park High Speed Charging Plaza
Construct a new 20.67' x 36 ' x 8.17' Communication equipment enclosure constructed of split face blocks 8"x8" x16" (744SF total) . Electric Vehicle Charging Station, including 480V-2000A Electric Switch gear, (3) 150kw Power Unit & Charger, (3) Provisions for future 150kw Power Unit & Chargers
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN as recorded on the permit) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · The city publishes current status without a date, so status changes are dated by the window between our snapshots.
APN 009-0420-002-0000 · 2 permits matched by address and location
Matched by checking which current parcel holds each permit's mapped point, or carries its street address. This is our inference, not an official County lineage record.
Source: Sacramento County GIS, Parcels · Geography: current parcel polygons · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Search by parcel number 009-0183-016-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
County systems may not return results for a retired number. If so, use a current parcel listed above. Most recent record here: Oct 12, 2018.