15 Stride Ct
Sacramento 95817 · Fairgrounds · City of Sacramento · Coordinates: 38.55010, -121.44375
Executive Verdict · Public-Records Synthesis
Zoned R-1A in City of Sacramento with likely ministerial ADU eligibility and zero mapped flood, fire, or fault hazard overlaps; benchmark value $432,000 ($380,000–$484,000).
Upsides & Opportunities
- ✓ Ministerial ADU / JADU pathway likely eligible
Zone R-1A allows residential use qualifying for ministerial ADU review under state law (11 ADU permits permitted within ¼ mile in 36 months).
Source: City of Sacramento zoning · CA Gov. Code 66314
- ✓ 1 documented municipal building permit on file
On-parcel permit history is indexed through Apr 23, 2018, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: minimal flood hazard)
all of the lot of the parcel intersects Zone X: minimal flood hazard. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! 6 slow or stalled nearby projects within ½ mile
Closest lead: Accessory dwelling unit at 4850 U St (0.43 mi NW, issued). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$5,375/yr at $432,000)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$448/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- 4,652 sq ft (0.11 ac)
- Assessor use:
- Residential · Single Family · Subdivision
- Tax rate area:
- 03005
- Addresses on lot:
- 15 STRIDE CT
Zoning & Land Use
R-1A — Single-Unit or Duplex Dwelling Zone (R)
2040 General Plan: Residential Mixed Use (FAR up to 4)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADULikely eligible
Zoned R-1A (two-family residential): state law allows ADUs where homes are allowed.
- SB 9: two homes on the lotCan't tell
Zoned R-1A (two-family residential): we can't tell whether it counts as a single-family zone for SB 9. Single-Unit or Duplex Dwelling Zone.
- SB 9: split into two lotsCan't tell
Zoned R-1A (two-family residential): we can't tell whether it counts as a single-family zone for SB 9. Single-Unit or Duplex Dwelling Zone.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: minimal flood hazard (all of the lot) · FIRM panel 06067C0190H, effective August 16, 2012
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $380,000 – $484,000 · Status: Off market
HUD Small Area FMR (ZIP 95817) · FY 2026
Studio $1,580 · 1BR $1,660 · 2BR $2,040 · 3BR $2,720 · 4BR $3,130
Developments Deserving Closer Investigation & Active Area Builders
- Accessory dwelling unit at 4850 U St (Issued)0.43 mi NW
Active in "Issued" for 2.8 yr (first record Feb 7, 2024) with no new permit activity recorded in 19 mo. current_status changed to "Finaled" in snapshot Nov 1, 2026.
- Accessory dwelling unit at 5317 V St (In review)0.2 mi N
In "In review" for 4 mo (since Jul 16, 2026), exceeding the 45d median and 85d 75th percentile for new single-family home permits in City of Sacramento (n=3,657). issued_date changed to "2026-10-02" in snapshot Nov 1, 2026.
- New home at 2951 57th St (Issued)0.32 mi SE
Active in "Issued" for 17 mo (first record Jun 12, 2025) with no new permit activity recorded in 16 mo.
- Accessory dwelling unit at 5912 2nd Ave (Issued)0.42 mi E
Active in "Issued" for 4.4 yr (first record Jun 9, 2022) with no new permit activity recorded in 3.5 yr.
Entity-resolved builders & contractors in ½ mile: Reynen And Bardis Homes (1 on parcel, 47 in ½ mi · New single-family home); Yancey (9 in ½ mi · Remodel / interior alteration); Redwood ADU (6 in ½ mi · Accessory dwelling unit (new or conversion)); Caldwell Construction (6 in ½ mi · Remodel / interior alteration); Solid Construction And Design (6 in ½ mi · Remodel / interior alteration).
Permit & Project History on This Parcel (1 permits, 1 grouped projects)
| Record # | Category | Status | Applied / Issued | Valuation | Description |
|---|---|---|---|---|---|
| RES-1806077 | New single-family home | Finaled | Iss. Apr 23, 2018 | $306,374 | Plan 2513; 1ST Floor 1118sf, 2nd Floor 1324 sf, Attached Garage 435 Sf, Attached Covered Porch 80 Sq. Ft. |
State HCD Housing Element APR records on this parcel: 1 entry (report years 2018).