New Commercial Building
EPC - New construction of a 870 S.F. Dutch Bros Coffee Stand with double drive-thru lanes, small parking area, and trash enclosure. Exterior work approved as part of planning project number P19-039 - PLNG-INSP SEE COM-2020289: REVISION TO COM-2007383: Revision to MEP plans to remove gas service to the building and replace previously proposed water heater and roof top equipment with electric units.
ross security shutter
EPC - Install manual security shutters to the interior of the store front only. No mechanical, electrical or plumbing scope. Project name: Ross 1837 Shutters
fire equipment
EPC - Fire system upgrade with replacement of old fire panel and new cellular communicator.
SHARED PLANS W/SIG-2007104 5140 Stockton Blvd (Dutch Bros)
Install two (2) free-standing menu board signs, install six (6) non-illuminated directional signs, install one (1) non-illuminated double-arm clearance bar sign.
SHARED PLANS W/SIG-2007106 5140 Stockton Blvd. (Dutch Bros)
Install two (2) illuminated wall signs, install four (4) wall-mounted menu board signs.
ROSS 1837 SHUTTERS
INSTALL MANUAL SECURITY SHUTTERS
western dental & orthodonitics
remove 2 existing exterior signs to be replaced 2 illuminated signs WESTERN DENTAL & ORTHODONITCS 91.3 sq ft and 51 sq ft.
Dutch Bros - Stockton Blvd.*ESTIMATE*
*ESTIMATE* A request to construct a 1000-square-foot Dutch Bros drive-thru coffee kiosk on a 9.37-acre parcel (0.574-acre lease area) in the General Commercial - Broadway/Stockton Special Planning District (C-2-SPD) zone. Requires approval by the Planning and Design Commission for Site Plan and Design Review and Conditional Use Permit for a drive-thru restaurant.
REVISION TO COM-1918692-Addition to existing sprinkler monitoring system
EXPEDITED - REVISION TO COM-1918692-AS BUILT-Addition to existing sprinkler monitoring system w/ a common area occupant notifying device. System shall monitor all fire alarm initiating devices and supervisory devices as indicated on the design plan. HVAC equipment shall shut down as required. System shall have capability to be monitotrd remotely with full point ID.
REVISION TO COM-1918692
EXPEDITED - REVISION TO COM-1918692: REMOVING ( 32) OF SPRINKLER HEADS FROM SOFFIT AREA ONLY (PER INSPECTION CORRECTION NOTICE)
5118 Stockton Blvd - Racking
EXPEDITED - Installation racking,shelving, register cabinets and fitting rooms only. No MEP work to be completed under this permit.
EPC Submittal - Deferred/Revision to Issued Permit com-1822245 - Per building inspection notice, ladder and hatch to roof was asked to be removed from drawings by building inspector
Revision - Smart & Final
EPC - Revision to Issued Permit COM-1810793 - Per building inspection notice, ladder and hatch to roof was asked to be removed from drawings by building inspector.
Permit to complete work from SIG-1815027: Smart & Final Signs (4)
Permit to complete work from SIG-1815027: Install (3) illuminated/ attached signs & (1) illuminated / detached Sign
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN as recorded on the permit) · Source updated Oct 1, 2026 · Retrieved Oct 22, 2026 · The city publishes current status without a date, so status changes are dated by the window between our snapshots.
APN 022-0280-044-0000 · 57 permits matched by address and location
Matched by checking which current parcel holds each permit's mapped point, or carries its street address. This is our inference, not an official County lineage record.
Source: Sacramento County GIS, Parcels · Geography: current parcel polygons · Source updated Oct 25, 2026 · Retrieved Oct 25, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Search by parcel number 022-0280-039-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
County systems may not return results for a retired number. If so, use a current parcel listed above. Most recent record here: Sep 16, 2020.
Shelving at Smart & Final
EPC - Original permit (COM-1820124) expired on 5/27/2019. New permit created and scope is for Storage Racking/Shelving installation 7' H or less (no high pile storage).
Suite 300, 5118 Stockton Blvd - Fire Alarm and Sprinklers
Suite 300, Adding new sprinkler heads to existing system. New fire alarm.****EXPEDITED - REVISION TO COM-1918692: REMOVING ( 32) OF SPRINKLER HEADS FROM SOFFIT AREA ONLY (PER INSPECTION CORRECTION NOTICE)****
ROSS Sign Permit - Stockton Blvd
Install (2) attached / illuminated
Suite 300
EPC - Suite 300, Remodel of Commercial Building - Tenant Improvement of existing shell building 26,726 SF. Scope includes rear loading dock addition (249 sf.), new RTU's (HVAC), new restrooms and new interior walls and finishes. - PLNG-INSP
Utilities Revision
EPC - Revision to COM-1808348 - Revised utilities to eliminate water main reconstruction requirement.
CC8 Revision
EPC - Revision to COM-1808348. Remove demising wall between Tenants 'D & 'E' from the drawings. Demising wall between the tenant spaces is not being constructed at this time.
EPC Submittal - Deferred/Revision to Issued Permit COM-1808348 - Revised utilities to eliminate water main reconstruction requirement.
Suite 300
Suite 300, Remodel of Commercial Building - Tenant Improvement of existing shell building. Scope includes rear loading dock addition, new RTU's (HVAC), new restrooms and new interior walls and finishes.
Revision CC7 - Stockton Plaza - Electrical & Mechanical
EPC - Revision to COM-1821441 -Single line and plan review revisions for Smart and Final tenant coordination.
PLANET FITNESS Sign Permit - Stockton Blvd
Install (1) attached / Illuminated Wall Sign
Revision CC6 - Stockton Plaza - Electrical & Mechanical
EPC - Revision to COM-1821441 - Conduit Connection of future Ross tenant to existing 1600 A 277/480V distribution board, conduit connection of future Smart & Final tenant to existing 1600A 277/480 distribution board. New 400 277/480 distribution tenant spaces, shown reconnection of existing house panel to new 400A 277/480 distribution board. Outdoor canopy lighting.
Stockton Plaza - Electrical & Mechanical
EXPEDITED - EPC -Expedite- (New scope of work for Shell Permit COM-1808348) Provide a 400 AMP, 480/277 volt 3 Phase, 4 wire service. The existing house panel well disconnected from the existing service and connected to the new 400 amp service. New 480 volt 400 amp service. New 480 volt 400 amp distribution panel is being added. New 480 volt to 120/8208 volt, 30 kva transformer is being added (4) 480/277 volt lighting panels for future retail spaces, (4) 120/208 volt 50 amp panel for future loads, new lighting fixtures, new convenience outlets, provide power
Revision CC5 - Stockton Plaza
EPC Submittal - Revision to COM-1808348 - revise rooftop HVAC units to tenant space 'B', change doors from swinging to double doors automatic sliding with emergency break away panels.
Revision CC5 - Stockton Plaza
EPC Submittal - Revision to COM-1808348 - Revised Rooftop HVAC units to tenant 'B' space, changes to the doors from swinging double doors to automatic sliding with emergency break away panels.
Revision - Smart & Final Remodel
EPC - Revision to COM-1810793, Removal of five (5) smoke detector, one (1) heat detector, and adding one (1) in the rotiiserie room.
Revision - Stockton Plaza CC4
EPC Submittal - Revision to COM-1808348 - Provide additional structural support for three existing columns at grid line 18.
Revision -Stockton Plaza (CC3)
EPC Submittal- Revision to COM-1808348 - Removal of any tenant improvement plumbing design from the main permit (COM-1808348). Plumbing revision will not impact Smart & Final tenant space (COM-1810793), plumbing revisions are for the adjacent spaces.
Ansul System
Install new UL-300 fire system 100 sq. ft.
Revision - Smart & Final
EPC - Revision to Com-1810793. Revised equipment layout and room and door configurations.
Shelving at Smart & Final
EPC - Storage Racking/Shelving installation 7' H or less (no high pile storage)
Stockton Plaza Revision CC2
EPC - Existing demolition single line diagram revised to show demolition of existing 400A/3P, 400A/3P, 200A/3P & 200A/3p Breakers at existing 1600A 277/480V distribution Panel "A". Single line diagram and load calculations revised to show new 800A 3P Breaker for the new Smart & Final tenant, and three (3) spaces to represent. Main Shell Permit COM-1808348, Revision #CC1 COM-1819550.
Stockton Plaza
EPC - (Revision to COM-18086348) New Electrical Equipment Room adjacent to tenant space 'E". Re-use existing 1600 AMP. 277/480v, 3phm 4W service.
Smart & Final Remodel
EPC Submittal - remodel of 32,820 s.f. of retail space to include; concrete slab patch back in areas, new interior partition walls, new cooler boxes, new refrigerated cases, new plumbing lines & fixtures, new lighting & electrical, and new HVAC interior duct runs. (At second cycle 10 the entire slab is being removed in the smart and final space. 2) Three(3) new doors are being cut into the back wall. Additional valuation would be $100,000) (SEE REVISION COM-1822245 Revision to Com-1810793. Revised equipment layout and room and door configurations.)
Smart & Final Signs
4 illuminated signs
Stockton Plaza
EXPEDITED - EPC - Remodel and addition to an existing commercial building, 3124 sf additions, 93750 sf existing building, total sf is 96874, type IIIB and V-B, Occupancy M and A3. Project includes reroof of 29.24 squares of TPO membrane. Accessibility Features in front of the future Ross Tenant space to be Completed under the Ross TI Permit. Interior demolition was under separate permit COM-1806577. - PLNG-INSP
REMODEL
EXPEDITED - REMODEL TO INCLUDE INSTALLATION OF INTERIOR PARTITION WALLS, COOLER PANELS, REFRIGERATOR CASES, PLUBMING LINES AND FIXTURES, LIGHTING AND ELECTRICAL, MERCHANDISE GONDOLAS AND HVAC INTERIOR DUCT RUNS.NEW CONCRETE SLAB PATCH IN REAR.
Smart & Final
EPC Submittal - Remodel of Commercial Building - Tenant improvement of 32,820 s.f. retail space to include; concrete slab patch back in areas, new interior partition walls, new cooler boxes, new refrigerated cases, new plumbing lines & fixtures, new lighting & electrical, and new HVAC interior duct runs.
EPC Submittal - Remodel of Commercial Building - Remodel of existing commercial retail building.
Stockton Plaza Partners LLC Interior Demolition
EXPEDITED - Interior Demolition ONLY
AARONS
EPC Submittal - Remodel of Commercial Building - new non load bearing walls, new cash wraps, carpet and paint.
Stockton Plaza Partners LLC Interior Demolition
Interior Demolition ONLY
EPC Submittal - Remodel of Commercial Building - new non load bearing walls, new cash wraps, carpet and paint.
COM REROOF
OVERLAY ONLY ON PLANET FITNESS ROOF***. E-Permit: Tear Off - No, Resheet - No, 1 layer(s), 22 squares of TPO Single Ply. CRRC: 0628-0002.
BLUE HILLS DENTAL Sign Permit
Install (2) attached / illuminated sets of channel letters w/ Logo & LED illumination. Re-Facing of existing detached monument sign is mentioned for reference only as no permit is required
REVISION TO COM-1613712
EPC Submittal REVISION TO COM-1613712 FOR TITLE 24 (LIGHTING REMOVED), SUITE NUMBER ADDED TO PLAN
replace parking lights
EXPEDITED - remove & replace 2 light pedestals
ACCESS DENTAL FIRE SPRINKLERS
Relocate 50 fire sprinkler heads within an existing tenant space.
EPC REMODEL SUITE 100
EPC Submittal SUITE 100- Remodel of Commercial Building - Interior remodel for dentist office TO INCLUDE LIFE SAFETY, STRUCTURAL, ELEC,PLMG, MECH FOR A FIRE SPRINKLER BUILDING WITH INTERIOR DEMO WORK. ***INTERIOR DEMO PULLED UNDER COM-1616762 10/18/16 ALS. REVISION FOR TITLE 24 (LIGHTING REMOVED), SUITE NUMBER ADDED TO PLAN UNDER COM-1703998
SUITE 100/110 INTERIOR DEMO
EXPEDITED - SUITE 100/110 INTERIOR DEMO OF WALLS, FIXTURES, FINISHES. (REMODEL PERMITS COM-1613712 / COM-1613729)
EPC REMODEL W/ PLANS SUITE 110
EPC Submittal - Ste 110. Remodel of Commercial Building - Interior remodel of a dentist office.
EPC SHARED PLANS W/ COM-1613712 REMODEL W/ PLANS SUITE 110
EPC Submittal -SHARED PLANS W/ COM-1613712 SUITE 110 Remodel of Commercial Building - Remodel of Commercial Building - Interior remodel for dentist office TO INCLUDE LIFE SAFETY, STRUCTURAL, ELEC,PLMG, MECH FOR A FIRE SPRINKLER BUILDING WITH INTERIOR DEMO WORK. ***INTERIOR DEMO PULLED UNDER COM-1616762 10/18/16 ALS
EPC Submittal - Remodel of Commercial Building - Interior remodel of a dentist office. This application for is for Ste 110.
EPC Submittal - Remodel of Commercial Building - Interior remodel for dentist office.