8521 Younger Creek Dr
Sacramento 95828 · Florin Fruitridge Industrial Park · City of Sacramento · Coordinates: 38.51713, -121.38904
Executive Verdict · Public-Records Synthesis
Zoned M-2S in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $388,000 ($341,000–$435,000).
Upsides & Opportunities
- ✓ 9 documented municipal building permits on file
On-parcel permit history is indexed through May 4, 2020, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
- ✓ Above-average reinvestment in Florin Fruitridge Industrial Park
46 substantial renovation & housing permits over 24 months (174.2 per 1,000 parcels vs. 30.4 citywide baseline) (#40 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Florin Fruitridge Industrial Park)
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: 0.2% annual chance flood hazard (shaded X))
all of the lot of the parcel intersects Zone X: 0.2% annual chance flood hazard (shaded X). Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! Delayed or open permit activity on this parcel
Plan revision / deferred submittal (SUB-2001575): Pending in review for 6.8 yr (60.5× the 41d median) — slower than 90% of plan revision / deferred submittal permits in City of Sacramento (median 41d, 90th pct 190d, n=69).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
- ! 2 slow or stalled nearby projects within ½ mile
Closest lead: Mark III Estimate (0.41 mi SE, fee estimate). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$4,873/yr at $388,000)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$406/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- 53,143 sq ft (1.22 ac)
- Assessor use:
- Industrial · Light · Other
- Tax rate area:
- 03267
- Addresses on lot:
- 8521 YOUNGER CREEK DR
Zoning & Land Use
M-2S — Heavy Industrial Zone (I)
2040 General Plan: Industrial Mixed Use (FAR up to 1)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADUUnlikely
Zoned M-2 (industrial): the zone doesn't allow homes, so state ADU rules don't apply.
- SB 9: two homes on the lotUnlikely
Zoned M-2 (industrial), not a single-family residential zone.
- SB 9: split into two lotsUnlikely
Zoned M-2 (industrial), not a single-family residential zone.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: 0.2% annual chance flood hazard (shaded X) (all of the lot) · FIRM panel 06067C0195H, effective August 16, 2012
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $341,000 – $435,000 · Status: Off market
HUD Small Area FMR (ZIP 95828) · FY 2026
Studio $1,630 · 1BR $1,710 · 2BR $2,100 · 3BR $2,800 · 4BR $3,220
Developments Deserving Closer Investigation & Active Area Builders
- Mark III Estimate (Fee estimate)0.41 mi SE
In "Fee estimate" for 8 yr (since Nov 20, 2018), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($3,472,204 declared valuation across 3 permits).
- Plan revision / deferred submittal (SUB-2001575) (Abandoned)On this parcel
Pending in review for 6.8 yr (60.5× the 41d median) — slower than 90% of plan revision / deferred submittal permits in City of Sacramento (median 41d, 90th pct 190d, n=69).
- Commercial tenant improvement (COM-1808407) (Certificate of Occupancy)On this parcel
Issued after 15 mo (7.2× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
- Plan revision / deferred submittal (SUB-1907946) (Abandoned)On this parcel
Pending in review for 7.5 yr (67.1× the 41d median) — slower than 90% of plan revision / deferred submittal permits in City of Sacramento (median 41d, 90th pct 190d, n=69).
Entity-resolved builders & contractors in ½ mile: Timco Construction (2 on parcel, 2 in ½ mi · Commercial tenant improvement); Foothill Fire Protection (2 on parcel, 2 in ½ mi · Fire alarm / sprinkler); J And D Greenberg Enterprises (1 on parcel, 1 in ½ mi · General repair); Buzz Oates Construction (9 in ½ mi · Commercial tenant improvement); Mark Iii Construction (8 in ½ mi · Remodel / interior alteration).
Permit & Project History on This Parcel (9 permits, 0 grouped projects)
| Record # | Category | Status | Applied / Issued | Valuation | Description |
|---|---|---|---|---|---|
| COM-2007356 | Plan revision / deferred submittal | Complete | App. May 4, 2020 | — | EPC - REVISION TO COM-1808407. •Modifications to CO2 system; •Remove abandoned equipment at roof; •Remove Clone area; •… |
| COM-2003801 | Other | Finaled | Iss. Mar 5, 2020 | $7,350 | EXPEDITED - EPC - Install bollards for vehicle protection at storefront. Life safety approval OTC on 3/2/2020. Cannabis… |
| COM-2003335 | Fire alarm / sprinkler | Finaled | Iss. Feb 26, 2020 | $2,518 | Fire Sprinklers (16 New) to be installed : Adding Upright sprinklers to existing overhead service |
| COM-2001581 | Plan revision / deferred submittal | Complete | App. Jan 30, 2020 | — | EPC - REVISION TO COM-1808407. MEP Revisions: #1. Room 118 Processing. Remove 2- FAU’s and AC’s replacing with 1- 5ton… |