6350 Sky Creek Dr
Sacramento 95828 · Florin Fruitridge Industrial Park · City of Sacramento · Coordinates: 38.51377, -121.38602
Executive Verdict · Public-Records Synthesis
Zoned M-2S in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $348,000 ($306,000–$390,000).
Upsides & Opportunities
- ✓ 5 documented municipal building permits on file
On-parcel permit history is indexed through Sep 3, 2026, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
- ✓ Above-average reinvestment in Florin Fruitridge Industrial Park
46 substantial renovation & housing permits over 24 months (174.2 per 1,000 parcels vs. 30.4 citywide baseline) (#40 of 102 neighborhoods).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (Florin Fruitridge Industrial Park)
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: 0.2% annual chance flood hazard (shaded X))
all of the lot of the parcel intersects Zone X: 0.2% annual chance flood hazard (shaded X). Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! 1 slow or stalled nearby project within ½ mile
Closest lead: Mark III Estimate (0.14 mi S, fee estimate). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$4,417/yr at $348,000)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$368/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- 242,194 sq ft (5.56 ac)
- Assessor use:
- Industrial · Warehouse · Storage
- Tax rate area:
- 03303
- Addresses on lot:
- 6350 SKY CREEK DR
Zoning & Land Use
M-2S — Heavy Industrial Zone (I)
2040 General Plan: Industrial Mixed Use (FAR up to 1)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADUUnlikely
Zoned M-2 (industrial): the zone doesn't allow homes, so state ADU rules don't apply.
- SB 9: two homes on the lotUnlikely
Zoned M-2 (industrial), not a single-family residential zone.
- SB 9: split into two lotsUnlikely
Zoned M-2 (industrial), not a single-family residential zone.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: 0.2% annual chance flood hazard (shaded X) (all of the lot) · FIRM panel 06067C0195H, effective August 16, 2012
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $306,000 – $390,000 · Status: Off market
HUD Small Area FMR (ZIP 95828) · FY 2026
Studio $1,630 · 1BR $1,710 · 2BR $2,100 · 3BR $2,800 · 4BR $3,220
Developments Deserving Closer Investigation & Active Area Builders
- Mark III Estimate (Fee estimate)0.14 mi S
In "Fee estimate" for 8 yr (since Nov 20, 2018), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($3,472,204 declared valuation across 3 permits).
- Viking Steel - New Office Bldg & Site Improvements (In review)0.36 mi S
High-impact scale ($2,339,123 declared valuation across 1 permit).
- Depot Park Logistics Facility (Finaled / completed)0.46 mi NW
High-impact scale ($18,813,806 declared valuation across 39 permits).
Entity-resolved builders & contractors in ½ mile: Material Handling (1 on parcel, 6 in ½ mi · Commercial tenant improvement); Madsen Roofing And Waterproofing (1 on parcel, 1 in ½ mi · Roof replacement); Sacramento Control (1 on parcel, 1 in ½ mi · Fire alarm / sprinkler); Buzz Oates Construction (13 in ½ mi · Commercial tenant improvement); Mark Iii Construction (10 in ½ mi · Commercial tenant improvement).
Permit & Project History on This Parcel (5 permits, 0 grouped projects)
| Record # | Category | Status | Applied / Issued | Valuation | Description |
|---|---|---|---|---|---|
| COM-2619446 | Plan revision / deferred submittal | Complete | App. Sep 3, 2026 | — | REVISION TO COM-2426191:REVISED RACK LAYOUT |
| COM-2609305 | Fire alarm / sprinkler | Issued | Iss. May 18, 2026 | $600 | EPC - THE SCOPE OF THIS PROJECT IS TO INSTALL A NEW GSM CELLULAR COMMUNICATOR TO AN EXISTING SPRINKLER MONITORING SYSTE… |
| COM-2600231 | Plan revision / deferred submittal | Complete | App. Jan 6, 2026 | — | EPC - REVISION TO COM-2426191 - Not installing phase II racking. |
| COM-2426191 | Commercial tenant improvement | Finaled | Iss. Jan 7, 2025 | $49,800 | EPC - install steel storage racks REVISION COM-2600231 - Not installing phase II racking. SEE REVISION COM-2619446: RE… |
| COM-2406846 |