4025 Deerbrook Dr
Sacramento 95823 · Valley Hi / North Laguna · City of Sacramento · Coordinates: 38.47233, -121.46012
Executive Verdict · Public-Records Synthesis
Zoned R-1 in City of Sacramento with likely ADU & SB 9 infill eligibility and zero mapped flood, fire, or fault hazard overlaps; benchmark value $437,000 ($385,000–$489,000).
Upsides & Opportunities
- ✓ ADU & SB 9 infill pathways screen as likely eligible
Zoned R-1 supports ministerial ADU/JADU review plus SB 9 both two-unit development and ministerial urban lot split on a 5,600 sq ft lot.
Source: City of Sacramento zoning · CA Gov. Code 66314 & 65852.21
- ✓ Documented permitted upgrades (+$12,600 contributory est.)
Public building records show issued construction/renovation work on this parcel (6 total permits, latest Oct 19, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: reduced flood risk due to levee)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! 5 slow or stalled nearby projects within ½ mile
Closest lead: 3990 Deer Run Way ADU (0.12 mi N, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$5,432/yr at $437,000)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$453/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- 5,600 sq ft (0.13 ac)
- Assessor use:
- Residential · Single Family · Subdivision
- Tax rate area:
- 03117
- Addresses on lot:
- 4025 DEERBROOK DR
Zoning & Land Use
R-1 — Single-Unit Dwelling Zone (R)
2040 General Plan: Neighborhood (FAR up to 1)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADULikely eligible
Zoned R-1 (single-family residential): state law allows ADUs where homes are allowed.
- SB 9: two homes on the lotLikely eligible
Zoned R-1, a single-family residential zone.
- SB 9: split into two lotsLikely eligible
Zoned R-1, a single-family residential zone. The lot is 5,600 sq ft by the assessor, room for two lots of at least 1,200 sq ft, each at least 40% of the original.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: reduced flood risk due to levee (all of the lot) · FIRM panel 06067C0302H, effective August 16, 2012
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $385,000 – $489,000 · Status: Off market
HUD Small Area FMR (ZIP 95823) · FY 2026
Studio $1,530 · 1BR $1,610 · 2BR $1,980 · 3BR $2,640 · 4BR $3,040
Nearby Activity (½ mile radius, since November 2024)
3 active or recent development projects (3 housing units across completed, permitted, and pipeline stages) and 327 total building permits recorded within ½ mile.
- New construction2 permits (1 units)
- Adds housing (ADU)1 permit (1 units)
- Additions & renovations35 permits
- Building systems271 permits
- Repairs9 permits
- Other9 permits
Developments Deserving Closer Investigation & Active Area Builders
- 3990 Deer Run Way ADU (Entitled)0.12 mi N
In "Entitled" for 5.4 yr (since Jun 17, 2021), exceeding the 45d median and 184d 90th percentile for new single-family home permits in City of Sacramento (n=3,657).
- New home at 0 Detroit Blvd (In review)0.37 mi NW
In "In review" for 8 mo (since Mar 11, 2026), exceeding the 45d median and 184d 90th percentile for new single-family home permits in City of Sacramento (n=3,657).
- 2 Lander Ct ADU (Entitled)0.38 mi E
In "Entitled" for 5.3 yr (since Jul 29, 2021), exceeding the 45d median and 184d 90th percentile for new single-family home permits in City of Sacramento (n=3,657).
- New home at 4415 Montril Way (Fee estimate)0.44 mi SE
In "Fee estimate" for 9.4 yr (since Jul 7, 2017), exceeding the 45d median and 184d 90th percentile for new single-family home permits in City of Sacramento (n=3,657).
Entity-resolved builders & contractors in ½ mile: Bell Brothers Heating And Air (3 on parcel, 3 in ½ mi · HVAC / heat pump); Sacramento Window And Door (1 on parcel, 1 in ½ mi · Windows / doors / siding); Nanofy Of California (1 on parcel, 1 in ½ mi · Solar / battery storage); Woodside 05n (28 in ½ mi · New single-family home); Pacific Builders (7 in ½ mi · Addition (adds square footage)).
Permit & Project History on This Parcel (6 permits, 0 grouped projects)
| Record # | Category | Status | Applied / Issued | Valuation | Description |
|---|---|---|---|---|---|
| RES-2623021 | Solar / battery storage | Issued | Iss. Oct 19, 2026 | $28,000 | 0kw Solar PV System, 27 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply sid… |
| RES-2515653 | Windows / doors / siding | Finaled | Iss. Jul 25, 2025 | $47,117 | R/R (9) aluminum windows and (2) doors replaced with (9) composite windows. Per site site plan window 114 and glider 102… |
| RES-2316091 | Windows / doors / siding | Finaled | Iss. Aug 1, 2023 | $2,000 | Remove existing window on street side, living room, and surrounding trim, install flashing, reinstall same window with n… |
| RES-2120916 | Plumbing / water heater / sewer | Expired Permit | Iss. Sep 27, 2021 | $1,390 | Change-out installation of Gas - 050 gallon to Gas - 050 gallon, located inside building, screening not required. |
| RES-2100751 | HVAC / heat pump | Expired Permit | Iss. Jan 13, 2021 | $3,748 | Change-out Ducts Only to Ducts Only. The existing unit shall be removed. The new unit shall be placed in the same locati… |
| RES-2005661 | HVAC / heat pump | Expired Permit | Iss. Apr 3, 2020 | $12,198 | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall … |