75 B San Miguel Way
Novato 94945 · Novato · Coordinates: 38.11733, -122.59973
Executive Verdict · Public-Records Synthesis
Zoned R1-7.5 in Novato with likely ministerial ADU eligibility and mapped FEMA AE flood due diligence; benchmark value $1,086,000 ($923,000–$1,249,000).
Upsides & Opportunities
- ✓ Ministerial ADU / JADU pathway likely eligible
Zone R1-7.5 allows residential use qualifying for ministerial ADU review under state law.
Source: Novato zoning · CA Gov. Code 66314
Watchouts & Due Diligence
- ! FEMA Special Flood Hazard Area (AE, about 62% of the lot of lot)
Zone AE: 1% annual chance flood (Special Flood Hazard Area) overlaps this parcel. Expect mandatory flood insurance for federally backed loans and floodplain elevation/mitigation rules for new units or SB 9 applications.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! Delayed or open permit activity on this parcel
Tessin JADU: Active in "Issued" for 18 mo (first record May 22, 2025) with no new permit activity recorded in 18 mo.
Source: County of Marin Community Development Agency, Building Permits (unincorporated Marin) (review-time benchmark)
- ! 5 slow or stalled nearby projects within ½ mile
Closest lead: Comstock Commons (0.33 mi N, entitled). Inspect timeline history before assuming near-term completion.
Source: County of Marin Community Development Agency, Building Permits (unincorporated Marin) · HCD APR (½-mile radius)
- ! Bulk building permits not published for Novato
Permit counts and nearby activity on this page may omit municipal counter records. Request a parcel permit report directly from the local building department.
Source: Source coverage registry (Novato)
Parcel & Assessor
- Lot size:
- 7,841 sq ft (0.18 ac)
- Assessor use:
- Single-Resid. - Improved
- Addresses on lot:
- 75B SAN MIGUEL WAY; 75 SAN MIGUEL WAY
Zoning & Land Use
R1-7.5 — Low Density Residential (Novato)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADULikely eligible
Zoned R1-7.5 (single-family residential): state law allows ADUs where homes are allowed. We read R1-7.5 from the zoning code's name; we haven't checked it against Novato's code text.
- SB 9: two homes on the lotPossible, with conditions
Zoned R1-7.5, a single-family residential zone. We read R1-7.5 from the zoning code's name; we haven't checked it against Novato's code text. FEMA Special Flood Hazard Area (Zone AE) covers about 62% of the lot: the project must meet the National Flood Insurance Program floodplain standards, or the lot needs a map revision.
- SB 9: split into two lotsPossible, with conditions
Zoned R1-7.5, a single-family residential zone. We read R1-7.5 from the zoning code's name; we haven't checked it against Novato's code text. The lot is 7,841 sq ft by the assessor, room for two lots of at least 1,200 sq ft, each at least 40% of the original. FEMA Special Flood Hazard Area (Zone AE) covers about 62% of the lot: the project must meet the National Flood Insurance Program floodplain standards, or the lot needs a map revision.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone AE: 1% annual chance flood (Special Flood Hazard Area) (about 62% of the lot); Zone X: 0.2% annual chance flood hazard (shaded X) (about 38% of the lot) · FIRM panel 06041C0276D, effective May 4, 2009
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $923,000 – $1,249,000 · Status: Off market
HUD Small Area FMR (ZIP 94945) · FY 2026
Studio $2,050 · 1BR $2,510 · 2BR $2,990 · 3BR $3,770 · 4BR $3,960
Nearby Activity (½ mile radius, since —)
3 active or recent development projects (5 housing units across completed, permitted, and pipeline stages) and 0 total building permits recorded within ½ mile.
Developments Deserving Closer Investigation & Active Area Builders
- Tessin JADU (Issued)On this parcel
Active in "Issued" for 18 mo (first record May 22, 2025) with no new permit activity recorded in 18 mo.
- Comstock Commons (Entitled)0.33 mi N
Active in "Entitled" for 4.5 yr (first record May 10, 2022) with no new permit activity recorded in 4.5 yr. High-impact scale (6 housing units across 0 permits).
- New home (Issued)0.18 mi NW
Active in "Issued" for 2.6 yr (first record Apr 16, 2024) with no new permit activity recorded in 2.6 yr.
- New home (Entitled)0.34 mi SW
Active in "Entitled" for 2.2 yr (first record Aug 23, 2024) with no new permit activity recorded in 2.2 yr.
Permit & Project History on This Parcel (0 permits, 1 grouped projects)
No building permits recorded on this parcel in our dataset.
State HCD Housing Element APR records on this parcel: 1 entry (report years 2025).