36 Tajero Ct
Sacramento 95838 · Northpointe · City of Sacramento · Coordinates: 38.65728, -121.46530
Executive Verdict · Public-Records Synthesis
Zoned R-1-PUD in City of Sacramento with likely ADU & SB 9 infill eligibility and zero mapped flood, fire, or fault hazard overlaps; benchmark value $421,000 ($370,000–$472,000).
Upsides & Opportunities
- ✓ ADU & SB 9 infill pathways screen as likely eligible
Zoned R-1-PUD supports ministerial ADU/JADU review plus SB 9 both two-unit development and ministerial urban lot split on a 5,620 sq ft lot.
Source: City of Sacramento zoning · CA Gov. Code 66314 & 65852.21
- ✓ Documented permitted upgrades (+$4,800 contributory est.)
Public building records show issued construction/renovation work on this parcel (3 total permits, latest Jun 13, 2017).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: reduced flood risk due to levee)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! 6 slow or stalled nearby projects within ½ mile
Closest lead: Sandhu Residence (0.18 mi SE, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$5,249/yr at $421,000)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$437/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- 5,620 sq ft (0.13 ac)
- Assessor use:
- Residential · Single Family · Subdivision
- Tax rate area:
- 03390
- Addresses on lot:
- 36 TAJERO CT
Zoning & Land Use
R-1-PUD — Single-Unit Dwelling Zone (R)
2040 General Plan: Neighborhood (FAR up to 1)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADULikely eligible
Zoned R-1 (single-family residential): state law allows ADUs where homes are allowed.
- SB 9: two homes on the lotLikely eligible
Zoned R-1, a single-family residential zone.
- SB 9: split into two lotsLikely eligible
Zoned R-1, a single-family residential zone. The lot is 5,620 sq ft by the assessor, room for two lots of at least 1,200 sq ft, each at least 40% of the original.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: reduced flood risk due to levee (all of the lot) · FIRM panel 06067C0062H, effective August 16, 2012
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $370,000 – $472,000 · Status: Off market
HUD Small Area FMR (ZIP 95838) · FY 2026
Studio $1,610 · 1BR $1,690 · 2BR $2,080 · 3BR $2,770 · 4BR $3,190
Developments Deserving Closer Investigation & Active Area Builders
- Sandhu Residence (Entitled)0.18 mi SE
In "Entitled" for 4.1 yr (since Oct 11, 2022), exceeding the 45d median and 184d 90th percentile for new single-family home permits in City of Sacramento (n=3,657).
- Xiong Residence (Entitled)0.32 mi NE
In "Entitled" for 15 mo (since Aug 5, 2025), exceeding the 45d median and 184d 90th percentile for new single-family home permits in City of Sacramento (n=3,657).
- 2 new homes at 5107 Alii Way (Entitled)0.43 mi NE
In "Entitled" for 22 mo (since Jan 6, 2025), exceeding the 184d median and 575d 90th percentile for new duplex / half-plex permits in City of Sacramento (n=115).
- New home (Entitled)0.45 mi NE
In "Entitled" for 22 mo (since Jan 7, 2025), exceeding the 45d median and 184d 90th percentile for new single-family home permits in City of Sacramento (n=3,657).
Entity-resolved builders & contractors in ½ mile: 360 Management Group (3 on parcel, 3 in ½ mi · Plan revision / deferred submittal); Red Hill Construction (3 in ½ mi · New commercial / non-residential building); Ti Builders (3 in ½ mi · Addition (adds square footage)); Tamarack Builders (3 in ½ mi · Addition (adds square footage)); Kcs West (2 in ½ mi · Commercial tenant improvement).
Permit & Project History on This Parcel (3 permits, 0 grouped projects)
| Record # | Category | Status | Applied / Issued | Valuation | Description |
|---|---|---|---|---|---|
| RES-1710135 | Plan revision / deferred submittal | Complete | App. Jun 13, 2017 | — | REVISION (2) TO RES-1617133: Relocation of panels due to fire set back. RSD added. Updated system to 2016 codes. |
| RES-1618329 | Plan revision / deferred submittal | Complete | App. Nov 15, 2016 | — | REVISION TO RES-1617133: E125A/ derate main Breaker to 100A w/30A solar |
| RES-1617133 | Solar / battery storage | Finaled | Iss. Oct 27, 2016 | $14,000 | 4.25kw Solar PV System, and 0gal Solar WH System (water heater installed null). |