4721 Kelton Way
Sacramento 95838 · Pell/Main Industrial Park · City of Sacramento · Coordinates: 38.65368, -121.46737
Executive Verdict · Public-Records Synthesis
Zoned M-1S-R in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $412,000 ($363,000–$461,000).
Upsides & Opportunities
- ✓ 3 documented municipal building permits on file
On-parcel permit history is indexed through Mar 4, 2026, letting you verify roof, HVAC, electrical, or structural work against seller disclosures.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
Watchouts & Due Diligence
- ! Mapped flood awareness zone (Zone X: reduced flood risk due to levee)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
- ! 5 slow or stalled nearby projects within ½ mile
Closest lead: Pela Place Development (0.46 mi SE, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
- ! Year 1 Prop 13 tax reset (~$5,147/yr at $412,000)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$429/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Parcel & Assessor
- Lot size:
- 219,107 sq ft (5.03 ac)
- Assessor use:
- Industrial · Warehouse · Distribution
- Tax rate area:
- 03252
- Addresses on lot:
- 4721 KELTON WAY; 4725 KELTON WAY
Zoning & Land Use
M-1S-R — Light Industrial Zone (I)
2040 General Plan: Employment Mixed Use (FAR up to 1)
State Housing Pathways Screen (ADU & SB 9)
- ADU or junior ADUUnlikely
Zoned M-1 (industrial): the zone doesn't allow homes, so state ADU rules don't apply.
- SB 9: two homes on the lotUnlikely
Zoned M-1 (industrial), not a single-family residential zone.
- SB 9: split into two lotsUnlikely
Zoned M-1 (industrial), not a single-family residential zone.
Mapped Hazard Zones on This Lot
- CAL FIRE Fire Hazard Severity Zone
- Not in a State-mapped fire hazard severity zone
- FEMA National Flood Hazard Layer
- Zone X: reduced flood risk due to levee (all of the lot) · FIRM panel 06067C0064J, effective June 16, 2015
- CGS Alquist-Priolo Earthquake Fault Zone
- Not in an Alquist-Priolo Earthquake Fault Zone
Surrounding Rent & Value Benchmarks (Public Records)
Range: $363,000 – $461,000 · Status: Off market
HUD Small Area FMR (ZIP 95838) · FY 2026
Studio $1,610 · 1BR $1,690 · 2BR $2,080 · 3BR $2,770 · 4BR $3,190
Developments Deserving Closer Investigation & Active Area Builders
- Pela Place Development (Entitled)0.46 mi SE
In "Entitled" for 3.1 yr (since Oct 12, 2023), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (7 housing units across 0 permits).
- Sandhu Residence (Entitled)0.22 mi NE
In "Entitled" for 4.1 yr (since Oct 11, 2022), exceeding the 45d median and 184d 90th percentile for new single-family home permits in City of Sacramento (n=3,657).
- New home at 230 Main Ave (Issued)0.22 mi E
Active in "Issued" for 3.2 yr (first record Sep 5, 2023) with no new permit activity recorded in 2.2 yr.
- New home at 240 Main Ave (Issued)0.23 mi E
Active in "Issued" for 3.2 yr (first record Sep 5, 2023) with no new permit activity recorded in 2.2 yr.
Entity-resolved builders & contractors in ½ mile: Sun Kiss Solar (2 on parcel, 2 in ½ mi · Solar / battery storage); Mmcw Construction (1 on parcel, 1 in ½ mi · Commercial tenant improvement); Kaylar Construction (4 in ½ mi · New single-family home); Premier Pools (4 in ½ mi · Pool / spa); Red Hill Construction (3 in ½ mi · New commercial / non-residential building).
Permit & Project History on This Parcel (3 permits, 0 grouped projects)
| Record # | Category | Status | Applied / Issued | Valuation | Description |
|---|---|---|---|---|---|
| COM-2526186 | Commercial tenant improvement | Certificate of Occupancy | Iss. Mar 4, 2026 | $100,000 | EPC - CONVERT EXISTING FACTORY SPACE TO 1,200 SQFT OFFICE WITH NEW SQUARE FOOTAGES · FACTORY 21,000 SQFT (EXISTING), … |
| COM-2106882 | Solar / battery storage | Expired Application | App. Apr 2, 2021 | $49,500 | EPC - Shared Plans (2) 3.9kw Solar PV System - Roof top (60panels) Shared Plans - Main Review - COM 2106877 |
| COM-2106877 | Solar / battery storage | Expired Application | App. Apr 2, 2021 | $75,000 | EPC - 2.96kw Solar PV System - Roof top (94 array panels @ 300 Watts) - Roof top Square footage = 1705 sf (Shared… |