Sacramento 95838 · Pell/Main Industrial Park · APN 237-0400-026-0000 · City of Sacramento
Zoned M-1S-R in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $441,000 ($388,000–$494,000).
Public building records show issued construction/renovation work on this parcel (26 total permits, latest Jun 24, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
HVAC / heat pump (COM-2518110): Issued after 3 mo — slower than 90% of hvac / heat pump permits in City of Sacramento (median 0d, 90th pct 2d, n=19,324).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$441,000
Benchmark range: $388,000 – $494,000
Closest lead: Self Storage Building (0.23 mi S, fee estimate). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$456/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 2 homes completed.
2 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
147 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of M-1 as industrial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Fee estimate" for 4.8 yr (since Jan 27, 2022), with no new permit record in 4.8 yr. · $5,667,060 declared valuation
In "Fee estimate" for 9.2 yr (since Aug 28, 2017), with no new permit record in 4.2 yr. · $12,000,000 declared valuation
Nearby roof replacement (4350 Pell Dr): First appeared in published agency feed
Record COM-2623890 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby windows / doors / siding (30 Keely Ct): First appeared in published agency feed
Record RES-2623799 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (278 La Plata Way): Status changed from Issued to Expired Permit
Record RES-2520500 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (4540 Bollenbacher Ave): First appeared in published agency feed
Record RES-2622237 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (4510 Breckenridge Way): First appeared in published agency feed
Record RES-2621960 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (225 Bell Ave): Status changed from Issued to Expired Permit
Record RES-2518229 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (4455 Bollenbacher Ave): Status changed from Issued to Finaled
Record RES-2620328 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby electrical / panel (156 Gunnison Ave): Status changed from Issued to Finaled
Record RES-2614575 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby addition (adds square footage) (4100 Northgate Blvd): Status changed from Triage Flood to Plan Check Target
Record COM-2621187 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby addition (adds square footage) (4100 Northgate Blvd): Applied date changed from 2026-09-23 to 2026-10-15
Record COM-2621187 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby addition (adds square footage) (278 La Plata Way): Status changed from Plan Check Target to Plan Check Wait
Record RES-2621289 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (4100 Northgate Blvd): Status changed from Plan Check Target to Plan Check Wait
Record COM-2621287 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby windows / doors / siding (212 Waunita Way): Status changed from Issued to Finaled
Record RES-2618635 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plumbing / water heater / sewer (4612 Kelton Way): First appeared in published agency feed
Record RES-2621667 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby hvac / heat pump (4510 Breckenridge Way): First appeared in published agency feed
Record RES-2621963 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Fee estimate" for 4.8 yr (since Jan 27, 2022), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($5,667,060 declared valuation across 2 permits).
In "Fee estimate" for 9.2 yr (since Aug 28, 2017), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($12,000,000 declared valuation across 4 permits).
Issued after 3 mo — slower than 90% of hvac / heat pump permits in City of Sacramento (median 0d, 90th pct 2d, n=19,324).
Issued after 16 mo (7.6× the 63d median) — slower than 90% of commercial tenant improvement permits in City of Sacramento (median 63d, 90th pct 201d, n=2,366).
Pending in review for 7.2 yr (64.3× the 41d median) — slower than 90% of plan revision / deferred submittal permits in City of Sacramento (median 41d, 90th pct 190d, n=69).
Pending in review for 7.6 yr (67.3× the 41d median) — slower than 90% of plan revision / deferred submittal permits in City of Sacramento (median 41d, 90th pct 190d, n=69).
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Ti Builders | Commercial tenant improvement | 9 on parcel11 in ½ mi | $3,052,095 | 0 vs 5 prior |
| Ardent Roofing | Roof replacement | 1 on parcel1 in ½ mi | $585,844 | 0 vs 0 prior |
| Floriani Engineering | Commercial tenant improvement | 1 on parcel1 in ½ mi | $380,000 | 0 |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95838
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($4,400/yr) + local voter-approved bond debt ($616/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$14,872/yr
Cash needed: $96,800
NOI: $11,827/yr
P&I: $2,225/mo
For $0/mo net cash flow
At $2,075/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,909/mo | −$1,478/mo | -18.3% | $3,972/mo | −$1,445/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $2,075/mo | −$1,239/mo | -15.4% | $3,676/mo | −$1,089/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $2,200/mo | −$1,102/mo | -13.7% | $3,591/mo | −$818/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
REMODEL
EPC - - REPLACING 2 EXISTING GAS HEATERS - INSTALLATION OF 2 NEW GAS HEATERS - 4 EXISTING MANUAL ROLL-UP DOORS TO BE MOTORIZED. - INSTALLATION OF NEW ACCESS CONTROL IN EXISTING WIRE CAGE
E-Permit: Tear Off - No, Resheet - No, 1 layer(s), 1082 squares of TPO Single Ply. CRRC: 0676-0001
hvac c/o
EPC - Demolition and like-for-like replacement of two existing rooftop HVAC units.
MS INTERNATIONAL
EXPEDITED - EPC Submittal - Remodel of Commercial Building - Installation of 5 ton capacity freestanding bridge crane system.
MSI SURFACES - RACKING INSTALLATION
EPC Submittal - Remodel of Commercial Building - install storage racking in an existing warehouse.
EPC Submittal - Remodel of Commercial Building - install storage racking in a existing warehouse
EPC Submittal - Remodel of Commercial Building - Installation of 5 ton capacity freestanding bridge crane system.
Electrical Equipment Only
EXPEDITED - New200A 480V meter socket, main breaker, sub-feed and panel run (3) 60A circuits for crane. NO crane installation on this permit.
4291 Pell Electrical Work
new 200amp/480v Meter socket, main breaker, subfeed and panel run (3) 60 amp circuits for cranes - Cranes not included in permit - MSI stone.
Fire Alarm Panel
Fire Alarm Panel and connection "BA" fans to FACP
Revision To Com-1901774 Truncated Domes
EXPEDITED - Revision To Com-1901774 Truncated Domes
MSI Signage
Install (1) attached / non-illuminated reverse pan channel letter sign & (1) face-change to monument sign
New Truck Ramp
EXPEDITED - EPC Submittal - New Commercial Building - New 52' x 59' truck ramp. Remove two 12' roll up doors and replace with two 12' roll up doors.
msi stone remodel
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
4.94 acres
Assessor's classification for assessment purposes. This is not zoning.
4291 PELL DR; 4291 PELL DR STE A STE A; 4291 PELL DR STE B STE B
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 237-0400-026-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| Danco Ventures | Commercial tenant improvement | 1 on parcel1 in ½ mi | $152,750 | 0 vs 3 prior |
| Haggerty Construction | Commercial tenant improvement | 1 on parcel1 in ½ mi | $128,000 | 2 vs 3 prior |
| Material Handling | Commercial tenant improvement | 1 on parcel1 in ½ mi | $107,082 | 6 vs 3 prior |
| Icon General Contractors | Commercial tenant improvement | 1 on parcel1 in ½ mi | $71,340 | 39 vs 62 prior−37% |
| Century Commercial Service | HVAC / heat pump | 1 on parcel1 in ½ mi | $21,360 | 2 vs 1 prior |
| Big Joe California North | Other | 1 on parcel1 in ½ mi | $15,000 | 0 vs 1 prior |
| Sacramento Control | Fire alarm / sprinkler | 1 on parcel1 in ½ mi | $4,615 | 0 vs 2 prior |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
| Roof replacementOn this parcel | 19,072 | 0d | 0d | 0d | 2d | 0d |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
EXPEDITED - EPC Submittal - Remodel of Commercial Building - Interior remodel-new interior walls, for new conference room and new storage room. conditioning ware house space, New electrical receptacles, new lighting, new roof top HVAC units. See Rev Com-1905563 Truncated Domes
EPC Submittal - New Commercial Building - New 52' x 59' truck ramp. Remove two 12' roll up doors and replace with two 12' roll up doors.
REVISION TO COM-1900285
REVISION TO COM-1900285-remove 6 heads from sprinkler plans.
EPC Submittal - Remodel of Commercial Building - Interior remodel-new interior walls, for new conference room and new storage room. New electrical receptacles, new lighting, new roof top HVAC units.
MSI STONE
EXPEDITED - Construct interior walls in existing 2480sf office space, ELECTRICAL RECEPTACLES, LIGHTING, NEW SINK IN RESTROOM, RES-STRIPING ACCESSIBLE PARKING SPACES, AND PARKING SIGNES.
STE # A - REMODEL
EXPEDITED - STE #A - REMODEL: DEMOLITION OF INTERIOR NON-STRUCTURAL WALLS; REPLACE EXISTING LIGHT FIXTURES WITL LED FIXTURES; FIRE SPRINKLERS TO BE ADDED; ALL WORK IS SUBJECT TO FIELD INSPECTION Revision COM-1901806 remove 6 heads from sprinkler system
Interior Demo
EXPEDITED - Interior Demo, non-structural demo
Racking - Dept. of Social Services
Install new High Pile Storage Racking - Dept. of Social Services
Soligent
Install one attached non illuminated sign. "Soligent"
PGE Safety Inspection
PG&E Safety Inspection
RACKS
Install 2287 linear feet total racking. The project covers a total of 21,464sf of floor space.
Suite B
EXPEDITED - Suite B, Remove 3 hr. rated roll-up door and man door. Infill opening with 4 hr. rated metal stud and gypsum assembly. Provide emergency exit lighting in warehouse, install natural gas line for future space heaters. The State Fire Marshall will plan review and inspect.
PALLET RACKS
Installation of pallet racks up to 20'.