Sacramento 95815 · Erikson Industrial Park · APN 277-0151-026-0000 · City of Sacramento
Since October 2024 within ½ mile: 4 homes completed, 2 permitted.
5 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
147 permits within ½ mile since October 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
$329,000
Benchmark range: $290,000 – $368,000
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Oct 1, 2026 · Retrieved Oct 22, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Oct 22, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Oct 26, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Oct 26, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Oct 26, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Oct 26, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Oct 26, 2026) · Zoning classes: our classification of C-2 as commercial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Fee estimate" for 9.2 yr (since Aug 14, 2017), with no new permit record in 9.2 yr. · $21,439,420 declared valuation
In "Fee estimate" for 5 yr (since Oct 29, 2021), with no new permit record in 5 yr. · 300 units · $75,000,000 declared valuation
In "Entitled" for 5.2 yr (since Aug 3, 2021), with no new permit record in 5.2 yr. · 47 units
In "Entitled" for 5.2 yr (since Aug 30, 2021), with no new permit record in 5.2 yr. · 1 unit
In "Entitled" for 4.7 yr (since Feb 16, 2022), with no new permit record in 4.7 yr. · 1 unit
Nearby permit (bbb211bcd9f786c4eab1711e63d5379de3b9019a): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby permit (43356de47ef668f20ccfcd9d846b22bd31793184): First appeared in published agency feed
Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Latest published Zillow Home Value Index (ZHVI) update
Changed from $354,204 in September 2025 to $348,970 in September 2026.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95815 (not a parcel appraisal)
Commercial tenant improvement permit issued (COM-2611459)
Community Care Campus Sac Remodel (Office Bldg)
SCOPE OF WORK UNDER THIS PERMIT IS LIMITED TO CHANGE OF USE FROM OFFICE TYPE B TO R-2 OCCUPANCY, CREATING SLEEPING ALCOVES, CONVERTING AND CONSTRUCTION OF NEW RATED WALL LINE FOR OCCUPANCY SEPARATION, INSTALLATION OF SMOKE DETECTORS IN PROPOSED SLEEPING AREA. REPLACE HARDWARE ON EXTERIOR FENCE GATES, ADDITION OF EXIT DOOR FROM (N) SLEEPING AREA, ASSOCIATED MECHANICAL, ELECTRICAL, AND FIRE PROTECTION WORK. SEE APPROVED AMMR ITEMS PER AMR-2600962. AREA SCOPE OF WORK IS 7,624 S.F. THIS FACILITY IS FOR HOMELESS AND SIMILAR TO SHORT-TERM DORMITORY, AND TYPICAL DURATION OF THE STAY IS FOR A FEW WEEKS TO A FEW MONTHS. RESIDENTS ARE AMBULATORY, INDEPENDENT, AND CAPABLE OF SELF-PRESERVATION IN CASE OF EMERGENCY. FULL-TIME ONSITE STAFF ARE FOR PROGRAM OVERSIGHT AND CASE MANAGEMENT, NOT FOR PROVIDING PERSONAL OR MEDICAL CARE. CLIENTS OCCUPY SHARED SLEEPING AREAS AND UTILIZE COMMON RESTROOMS + SHOWERS. MEALS ARE PREPACKAGED AND PROVIDED ON-SITE BY AN OUTSIDE CATERING COMPANY. · Declared valuation: $245,000 · Contractor: Icon General Contractors Llc
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
2649 Taft St · 1 unit · $138,209 valuation
Records span Apr 14, 2026 to Jun 8, 2026 (2 permits).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
Commercial tenant improvement permit application filed (COM-2611459)
Community Care Campus Sac Remodel (Office Bldg)
SCOPE OF WORK UNDER THIS PERMIT IS LIMITED TO CHANGE OF USE FROM OFFICE TYPE B TO R-2 OCCUPANCY, CREATING SLEEPING ALCOVES, CONVERTING AND CONSTRUCTION OF NEW RATED WALL LINE FOR OCCUPANCY SEPARATION, INSTALLATION OF SMOKE DETECTORS IN PROPOSED SLEEPING AREA. REPLACE HARDWARE ON EXTERIOR FENCE GATES, ADDITION OF EXIT DOOR FROM (N) SLEEPING AREA, ASSOCIATED MECHANICAL, ELECTRICAL, AND FIRE PROTECTION WORK. SEE APPROVED AMMR ITEMS PER AMR-2600962. AREA SCOPE OF WORK IS 7,624 S.F. THIS FACILITY IS FOR HOMELESS AND SIMILAR TO SHORT-TERM DORMITORY, AND TYPICAL DURATION OF THE STAY IS FOR A FEW WEEKS TO A FEW MONTHS. RESIDENTS ARE AMBULATORY, INDEPENDENT, AND CAPABLE OF SELF-PRESERVATION IN CASE OF EMERGENCY. FULL-TIME ONSITE STAFF ARE FOR PROGRAM OVERSIGHT AND CASE MANAGEMENT, NOT FOR PROVIDING PERSONAL OR MEDICAL CARE. CLIENTS OCCUPY SHARED SLEEPING AREAS AND UTILIZE COMMON RESTROOMS + SHOWERS. MEALS ARE PREPACKAGED AND PROVIDED ON-SITE BY AN OUTSIDE CATERING COMPANY. · Declared valuation: $245,000 · Contractor: Icon General Contractors Llc
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
2450 Knoll St · 1 unit · $299,449 valuation
Records span May 28, 2025 to Dec 24, 2025 (1 permit).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
Commercial tenant improvement permit issued (COM-2522199)
Community Care Campus Sac Remodel (Gym)
EPC - EXPEDITED - SCOPE OF WORK UNDER THIS PERMIT IS LIMITED TO: - CHANGE OF USE FROM A-3 & B TO R-2 OCCUPANCY - REMOVE DOUBLE DOORS BETWEEN SLEEPING AREA - INSTALL NEW STOREFRONT EXIT DOOR WITHIN SLEEPING AREA. CONSTRUCT CONCRETE LANDING TO CONNECT TO EXISTING SIDEWALK. - RELATED MECHANICAL, ELECTRICAL, FIRE SPRINKLER, AND FIRE ALARM WORK. - PLNG-INSP FACILITY IS SIMILAR TO SHORT-TERM DORMITORY, AND TYPICAL DURATION OF THE STAY IS FOR A FEW WEEKS TO A FEW MONTHS. RESIDENTS ARE AMBULATORY, INDEPENDENT, AND CAPABLE OF SELF-PRESERVATION IN CASE OF EMERGENCY. FULL-TIME ONSITE STAFF ARE FOR PROGRAM OVERSIGHT AND CASE MANAGEMENT, NOT FOR PROVIDING PERSONAL OR MEDICAL CARE. CLIENTS OCCUPY SHARED SLEEPING AREAS AND UTILIZE COMMON RESTROOMS + SHOWERS. MEALS ARE PREPACKAGED AND PROVIDED ON-SITE BY AN OUTSIDE CATERING COMPANY. PROPOSED AREA OF WORK : AREA OF WORK: 3,644 S.F. +/- · Declared valuation: $66,445 · Contractor: Icon General Contractors Llc
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
Commercial tenant improvement permit application filed (COM-2522199)
Community Care Campus Sac Remodel (Gym)
EPC - EXPEDITED - SCOPE OF WORK UNDER THIS PERMIT IS LIMITED TO: - CHANGE OF USE FROM A-3 & B TO R-2 OCCUPANCY - REMOVE DOUBLE DOORS BETWEEN SLEEPING AREA - INSTALL NEW STOREFRONT EXIT DOOR WITHIN SLEEPING AREA. CONSTRUCT CONCRETE LANDING TO CONNECT TO EXISTING SIDEWALK. - RELATED MECHANICAL, ELECTRICAL, FIRE SPRINKLER, AND FIRE ALARM WORK. - PLNG-INSP FACILITY IS SIMILAR TO SHORT-TERM DORMITORY, AND TYPICAL DURATION OF THE STAY IS FOR A FEW WEEKS TO A FEW MONTHS. RESIDENTS ARE AMBULATORY, INDEPENDENT, AND CAPABLE OF SELF-PRESERVATION IN CASE OF EMERGENCY. FULL-TIME ONSITE STAFF ARE FOR PROGRAM OVERSIGHT AND CASE MANAGEMENT, NOT FOR PROVIDING PERSONAL OR MEDICAL CARE. CLIENTS OCCUPY SHARED SLEEPING AREAS AND UTILIZE COMMON RESTROOMS + SHOWERS. MEALS ARE PREPACKAGED AND PROVIDED ON-SITE BY AN OUTSIDE CATERING COMPANY. PROPOSED AREA OF WORK : AREA OF WORK: 3,644 S.F. +/- · Declared valuation: $66,445 · Contractor: Icon General Contractors Llc
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
Annual ZIP 95815 home-value index checkpoint
Changed from $364,821 in September 2024 to $354,204 in September 2025.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95815 (not a parcel appraisal)
900 Calvados Ave · 2 units · $199,840 valuation
Records span Jun 17, 2025 to Sep 15, 2025 (3 permits).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
2356 Boxwood St · 1 unit · $202,845 valuation
Records span Jan 22, 2025 to May 2, 2025 (1 permit).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
2400 Knoll St · 1 unit · $270,904 valuation
Records span Mar 3, 2023 to Mar 5, 2025 (2 permits).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) & HCD APR (grouped project within ½ mile)
Annual ZIP 95815 home-value index checkpoint
Changed from $352,152 in September 2023 to $364,821 in September 2024.
Source: Zillow Home Value Index (ZHVI) · Data provided by Zillow · Geography: ZIP 95815 (not a parcel appraisal)
Commercial tenant improvement permit issued (FPP-2418856)
REMODEL - 2241 HARVARD STE 300
EPC - EXPEDITED - DEMO OF EXISTING IMPROVEMENTS, CONSTRUCTION OF NEW TENANT IMPROVEMENTS. WORK TO INCLUDE NEW INTERIOR PARTITIONS AND FINISHES. MODIFICATION OF EXISTING HVAC,ELECTRICAL, FIRE SPRINKLER AND FIRE ALARM. · Declared valuation: $69,379 · Contractor: Icon General Contractors Llc
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →Active in "Fee estimate" for 5 yr (first record Oct 29, 2021) with no new permit activity recorded in 5 yr. High-impact scale (300 housing units, $75,000,000 declared valuation across 1 permit).
Active in "Fee estimate" for 9.2 yr (first record Aug 14, 2017) with no new permit activity recorded in 9.2 yr. High-impact scale ($21,439,420 declared valuation across 3 permits).
Active in "Entitled" for 5.2 yr (first record Aug 3, 2021) with no new permit activity recorded in 5.2 yr. High-impact scale (47 housing units across 0 permits).
Active in "Entitled" for 5.2 yr (first record Aug 30, 2021) with no new permit activity recorded in 5.2 yr.
Active in "Entitled" for 4.7 yr (first record Feb 16, 2022) with no new permit activity recorded in 4.7 yr.
High-impact scale (22 housing units, $4,302,712 declared valuation across 80 permits).
Substantial improvements (additions, interior remodels, ADUs, commercial TI, and new builds) across 182 parcels
Small prior baseline
City baseline: 30.6 / 1k
9 in trailing 24m
Includes 0 ADUs
HUD Small Area Fair Market Rent · ZIP 95815
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($3,300/yr) + local voter-approved bond debt ($462/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
−$9,033/yr
Cash needed: $72,600
NOI: $10,991/yr
P&I: $1,669/mo
For $0/mo net cash flow
At $1,850/mo rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,702/mo | −$965/mo | -16.0% | $3,049/mo | −$933/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $1,850/mo | −$753/mo | -12.4% | $2,823/mo | −$616/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $1,961/mo | −$631/mo | -10.4% | $2,757/mo | −$375/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
Fee estimate300 unitsOct 29, 2021 – Oct 29, 2021
Fee estimateAug 14, 2017 – Aug 25, 2017
We group related permits and State housing reports into projects. That grouping is our inference, not an official record.
Community Care Campus Sac Remodel (Office Bldg)
SCOPE OF WORK UNDER THIS PERMIT IS LIMITED TO CHANGE OF USE FROM OFFICE TYPE B TO R-2 OCCUPANCY, CREATING SLEEPING ALCOVES, CONVERTING AND CONSTRUCTION OF NEW RATED WALL LINE FOR OCCUPANCY SEPARATION, INSTALLATION OF SMOKE DETECTORS IN PROPOSED SLEEPING AREA. REPLACE HARDWARE ON EXTERIOR FENCE GATES, ADDITION OF EXIT DOOR FROM (N) SLEEPING AREA, ASSOCIATED MECHANICAL, ELECTRICAL, AND FIRE PROTECTION WORK. SEE APPROVED AMMR ITEMS PER AMR-2600962. AREA SCOPE OF WORK IS 7,624 S.F. THIS FACILITY IS FOR HOMELESS AND SIMILAR TO SHORT-TERM DORMITORY, AND TYPICAL DURATION OF THE STAY IS FOR A FEW WEEKS TO A FEW MONTHS. RESIDENTS ARE AMBULATORY, INDEPENDENT, AND CAPABLE OF SELF-PRESERVATION IN CASE OF EMERGENCY. FULL-TIME ONSITE STAFF ARE FOR PROGRAM OVERSIGHT AND CASE MANAGEMENT, NOT FOR PROVIDING PERSONAL OR MEDICAL CARE. CLIENTS OCCUPY SHARED SLEEPING AREAS AND UTILIZE COMMON RESTROOMS + SHOWERS. MEALS ARE PREPACKAGED AND PROVIDED ON-SITE BY AN OUTSIDE CATERING COMPANY.
Community Care Campus Sac Remodel (Gym)
EPC - EXPEDITED - SCOPE OF WORK UNDER THIS PERMIT IS LIMITED TO: - CHANGE OF USE FROM A-3 & B TO R-2 OCCUPANCY - REMOVE DOUBLE DOORS BETWEEN SLEEPING AREA - INSTALL NEW STOREFRONT EXIT DOOR WITHIN SLEEPING AREA. CONSTRUCT CONCRETE LANDING TO CONNECT TO EXISTING SIDEWALK. - RELATED MECHANICAL, ELECTRICAL, FIRE SPRINKLER, AND FIRE ALARM WORK. - PLNG-INSP FACILITY IS SIMILAR TO SHORT-TERM DORMITORY, AND TYPICAL DURATION OF THE STAY IS FOR A FEW WEEKS TO A FEW MONTHS. RESIDENTS ARE AMBULATORY, INDEPENDENT, AND CAPABLE OF SELF-PRESERVATION IN CASE OF EMERGENCY. FULL-TIME ONSITE STAFF ARE FOR PROGRAM OVERSIGHT AND CASE MANAGEMENT, NOT FOR PROVIDING PERSONAL OR MEDICAL CARE. CLIENTS OCCUPY SHARED SLEEPING AREAS AND UTILIZE COMMON RESTROOMS + SHOWERS. MEALS ARE PREPACKAGED AND PROVIDED ON-SITE BY AN OUTSIDE CATERING COMPANY. PROPOSED AREA OF WORK : AREA OF WORK: 3,644 S.F. +/-
REMODEL - 2241 HARVARD STE 300
EPC - EXPEDITED - DEMO OF EXISTING IMPROVEMENTS, CONSTRUCTION OF NEW TENANT IMPROVEMENTS. WORK TO INCLUDE NEW INTERIOR PARTITIONS AND FINISHES. MODIFICATION OF EXISTING HVAC,ELECTRICAL, FIRE SPRINKLER AND FIRE ALARM.
2241 Harvard Suite #310 REMODEL
EPC - EXPEDITED - Construction of new tenant improvements. Work to include new interior partitions & finishes. Modification of existing HVAC,Electrical Fire Sprinkler & Fire Alarm.
EPC - FPP Revision to FPP-2222046
EPC - EXPEDITED -- FPP Revision to FPP-2222046-This forms part of the addendum resubmittal for this same project. The addendum includes changes as requested by the tenant to provide an additional private office (Office 115). This change required changes to the following sheets: Sheet Changes made G-101 Showing new office 115 as part of the egress plan. A-201 Showing new office 115 as part of the new floor plan. A-202 Added door for new office in door schedule. A-601 Showing new office 115 and the ceiling change requirements. A-901 Updated Details to correctly reflect 2 layers of Gyp. Bd. on one side and 1 layer of Gyp. Bd. on the other for STC rating. M,E,F Mechanical, Electrical and Fire have also been updated to show new layout of air diffusers, lighting and horn strobes. Taking advantage of this resubmittal, the plans have also been updated to address comments made by the state fire marshal. Itemized items have been noted below. Sheet Changes made E2.1 Existing Horn Strobe is noted to be relocated. E2.1 Specifications for the bug-eye lighting used have been added to the plan (Lithonia ELM2L) D1/E1.2 Installation details for the EV Charging Station have been provided, see D1/E1.2 for A-001 & 2/A-002 A Wheel stop has been added to confirm that the EV Charging station will be protected. EVCS Spec: Specifications for the charge are attached. Note that IF ventilation is required, it is only because the vehicle requires ventilation and is not dependent on the EVCS. BTCPower User Manual & Installation instructions, Page 6 under Warning, bullet point #3.
2241 Harvard Street REMODEL (SUITE 310)
EPC - EXPEDITED - DEMO OF EXISTING IMPROVEMENTS, CONSTRUCTION OF NEW TENANT IMPROVEMENTS. WORK TO INCLUDE NEW INTERIOR PARTIONS & FINISHES. MODIFICATION OF EXISTING HVAC, ELECTRICAL,FIRE SPRLINKLER & FIRE ALARM FOR SUITE 310
FPP - 2251 HARVARD ST
EPC - EXPEDITED - TENANT IMPROVEMENT, CONSISTING OF OFFICE REMODEL , INCLUDING CONSTRUCTION OF NON-BEARING PARTITIONS, RECONFIGURATION OF EXISTING CEILING GRID AND TILE, RELOCATION OF EXISTING AND NEW LIGHT FIXTURES, HVAC GRILLES, NEW OUTLETS AND NEW FINISHES. THE EXISTING MECHANICAL, ELECTRICAL AND FIRE SPRINKLER ARE MODIFIED AS NEEDED TO ACCOMMODATE NEW LAYOUT. NO PLUMBING WORK PROPOSED. ***SEE REVISION FPP-2302930- This forms part of the addendum resubmittal for this same project. The addendum includes changes as requested by the tenant to provide an additional private office (Office 115). This change required changes to the following sheets: Sheet Changes made G-101 Showing new office 115 as part of the egress plan. A-201 Showing new office 115 as part of the new floor plan. A-202 Added door for new office in door schedule. A-601 Showing new office 115 and the ceiling change requirements. A-901 Updated Details to correctly reflect 2 layers of Gyp. Bd. on one side and 1 layer of Gyp. Bd. on the other for STC rating. M,E,F Mechanical, Electrical and Fire have also been updated to show new layout of air diffusers, lighting and horn strobes. Taking advantage of this resubmittal, the plans have also been updated to address comments made by the state fire marshal. Itemized items have been noted below. Sheet Changes made E2.1 Existing Horn Strobe is noted to be relocated. E2.1 Specifications for the bug-eye lighting used have been added to the plan (Lithonia ELM2L) D1/E1.2 Installation details for the EV Charging Station have been provided, see D1/E1.2 for A-001 & 2/A-002 A Wheel stop has been added to confirm that the EV Charging station will be protected. EVCS Spec: Specifications for the charge are attached. Note that IF ventilation is required, it is only because the vehicle requires ventilation and is not dependent on the EVCS. BTCPower User Manual & Installation instructions, Page 6 under Warning, bullet point #3. ***
PARKS & REC. - REMODEL
EPC - 2ND FLOOR OFFICE REMODEL - CONSISTING OF DEMOLITION AND CONSTRUCTION OF NON-BEARING PARTITIONS, RECONFIGURATION OF EXISTING CEILING GRID AND TILE, RELOCATION OF EXISTING AND NEW LIGHT FIXTURES, HVAC GRILLES, NEW OUTLETS AND NEW FINISHES. THE EXISTING MECHANICAL,PLUMBING, ELECTRICAL AND FIRE SPRINKLER ARE MODIFIED. NO CHANGE IN USE AND OCCUPANCY.
MAXIM HEALTHCARE - REMODEL
EPC - TENANT IMPROVEMENT, CONSISTING OF OFFICE REMODEL , INCLUDING DEMOLITION AND CONSTRUCTION OF NON-BEARING PARTITIONS, RECONFIGURATION OF EXISTING AND NEW CEILING GRID AND TILE, NEW LIGHT FIXTURES, HVAC GRILLES, NEW OUTLETS AND NEW FINISHES. THE EXISTING MECHANICAL, PLUMBING, ELECTRICAL AND FIRE SPRINKLER ARE MODIFIED AS NEEDED TO ACCOMMODATE NEW LAYOUT
Basin Apartments
EPC - Construction of an apartment complex with 300 units, total of 10 buildings plus a 2500 SF club house and a pool. Assumed all 100 one-bedroom units are less than 750 SF, and all 200 two-three bedroom units are between 750-2000 SF. Assumed overall size of all 10 apartment buildings are 502,500 SF - PLNG-INSP
Fire Alarm Modification
EPC - Replace existing fire alarm system like for like
HVAC C/O - 2241 Harvard STE 100
Like for like change out- inside air handler / roof top condenser unit. The existing unit shall be removed. The new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. CF-1R-ALT-HVAC on file: Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314.
Fire Alarm Modification Bldg #1
EPC - Add (1) new control relay to activate the fireman's hat; add additional smoke and heat detectors in the elevator mech room, to cover beam pockets. Bldg #1
EXPEDITED - EPC Submittal - Remodel of Commercial Building - Scope of Work limited to Accessibility Upgrades and Providing Electrical Charging Stations. This is additional work we are doing under Main Permit No. #FPP-1717255
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Oct 1, 2026 · Retrieved Oct 22, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Oct 26, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Oct 10, 2026 · Retrieved Oct 22, 2026
21.68 acres
Assessor's classification for assessment purposes. This is not zoning.
2201 HARVARD ST; 2211 HARVARD ST; 2241 HARVARD ST
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Oct 25, 2026 · Retrieved Oct 25, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 277-0151-026-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
1st thru 4th floor
EXPEDITED - EPC Submittal - Remodel of Commercial Building - The scope of work is for the Pedestrian Walkway. The State Fire Marshal requires Voice/Alarm System to be installed throughout the entire building. SFM also requested a separation be provided between this building and two other structures connected by means of a pedestrian walkway. Work is on all 4 floors for the SFM. This is a 4-Story building.
EPC Submittal - Remodel of Commercial Building - Scope of Work limited to Accessibility Upgrades and Providing Electrical Charging Stations. This is additional work we are doing under Main Permit No. #FPP-1717255
1st thru 4th floor
EPC Submittal - Remodel of Commercial Building - This project is associated with existing Permit No. FPP-1717255. The State Fire Marshal requires Voice/Alarm System to be installed throughout the entire building. SFM also requested a separation be provided between this building and two other structures connected by means of a pedestrian walkway. Work is on all four floors. This is a 4-Story building.
1st and 4th floor
EXPEDITED - 1st and 4th floor, Office remodel, single suite on the 1st floor and the entire 4th floor, includes mechanical, plumbing, electrical, 8 elect. charging stations, and some wall demo. The State Fire Marshall will plan review and inspect this project.
interior demo
EXPEDITED - work is limited to demolition of non-bearing, non structural wall only, tenant remodel to be pulled under separate permit, 1st floor- 8849 sq ft, 4th floor 31487 sq ft
145,000 sq. ft.
New 4 story office building, 145,000 sq. ft. Type VB building, 9.2 acres - PLNG-INSP
145,000 sq. ft.
New 4 story office building, 145,000 sq. ft. Type VB building, 21.68 acres - PLNG-INSP
108,750 sq. ft.
New 3 story office building, 108,750 sq. ft. Type VB building, 9.2 acres - PLNG-INSP
HARVARD PARK CORPORATE CAMPUS SIGN PERMIT
HARVARD PARK CORPORATE CAMPUS: Install new sign cabinet on a new detached monument base-to be provided by others (Base requires a Separate Commercial Permit)
monument base
installation of a monument sign base at the corner of arden & Harvard st
Suite 100 Interior Remodel
Revision to COM-1619211 - Added Sprinkler head missed on original plan set.
ALTA CALIF REGIONAL CENTER
EXPEDITED - REVISION TO FPP-1616139- Change of room designation and occupant load.
revision to com-1619211, revised door swings
EXPEDITED - revision to com-1619211, revised door swings
Suite 100 Interior Remodel
EXPEDITED - Suite 100 interior remodel: Demolition of existing interior partitions, new partitions with associated mechanical, electrical and fire sprinklers. New ceilings, relocation of lighting and HVAC. New finishes doors and hardware. (See Revision COM-1705396 for added sprinkler heads missed on original plans. SMB)
4th FL REMODEL
EXPEDITED - 4TH FL REMODEL TO INCLUDE INTERIOR WALL DEMO TO CREATE OPEN OFFICE AREA, NEW WALLS, DOORS AND 1 NEW OFFICE, MODIFICATIONS TO EXISTING MECHANICAL, ELECTRICAL AND FIRE SPRINKLER LAYOUT, NEW CARPET, BASE AND PAINT. CEILING MODIFICATIONS.
ALTA CALIF REGIONAL CENTER
EXPEDITED - Interior remodel to include new partitions, ceilings, with associated plumbing/mechanical, electrical fire alarm and fire sprinklers.
Suite 115
EXPEDITED - Suite 115. Interior remodel to include new partitions within an existing open office to create three rooms. Work to include the installation of two doors and one sidelite, new lighting and hvac relocation. Install new electrical outlets and switches.
Interior Demolition
EXPEDITED - Interior demolition only per approved plans.
5TH FLOOR REMODEL
EXPEDITED - REMODEL TO INCLUDE (2) WALL SECTIONS, INSTALL NEW ELECTRICAL OUTLETS, RELOCATE AND RE-SWITCH EXISTING LIGHTING, BALANCE HVAC, NO PLUMBING WORK UNDER THIS PERMIT, MODIFICATIONS TO EXISTING FIRE SPRINKLERS AND ALARM AS REQUIRED
Revision
EXPEDITED - Revision to FPP-1512755 Revised mechanical drawing to show existing dampers to remain.
c/o cooling tower
c/o existing cooling tower. like for like.
c/o cooling tower
c/o existing cooling tower. like for like.