Sacramento 95815 · Arden Fair · APN 277-0160-071-0000 · City of Sacramento
Zoned C-2 in City of Sacramento and zero mapped flood, fire, or fault hazard overlaps; benchmark value $555,000 ($488,000–$622,000).
Public building records show issued construction/renovation work on this parcel (312 total permits, latest Oct 14, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Sign (SIG-2612285): Pending in review for 5 mo (8.1× the 19d median) — slower than 90% of sign permits in City of Sacramento (median 19d, 90th pct 76d, n=1,075).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$555,000
Benchmark range: $488,000 – $622,000
Closest lead: 17th & S Street Mixed Use (0.42 mi N, entitled). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$565/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
Since November 2024 within ½ mile: 2 homes completed.
2 projects with a record in this window, grouped by us from permits and State housing reports. Units are as proposed on each project's latest record and counted at its current stage.
284 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of C-2 as commercial, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Fee estimate" for 9.9 yr (since Dec 9, 2016), with no new permit record in 8.7 yr. · $2,000,000 declared valuation
In "Fee estimate" for 7.6 yr (since Mar 21, 2019), with no new permit record in 7.6 yr. · 33 units · $10,172,244 declared valuation
In "Approved" for 6.7 yr (since Feb 13, 2020), with no new permit record in 6.7 yr.
In "Entitled" for 5.3 yr (since Aug 3, 2021), with no new permit record in 5.3 yr. · 47 units
In "Fee estimate" for 4.3 yr (since Aug 1, 2022), with no new permit record in 3.5 yr. · $1,400,000 declared valuation
Nearby electrical / panel (1535 River Park Dr): First appeared in published agency feed
Record COM-2623856 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1545 River Park Dr 500): Status changed from Plan Check Target to Complete
Record FPP-2621382 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby electrical / panel (1913 Waterford Rd): Status changed from Issued to Finaled
Record RES-2620466 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1601 Arden Way): First appeared in published agency feed
Record COM-2621862 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1601 Arden Way): Status changed from Plan Check Target to Plan Check Wait
Record COM-2621057 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1601 Arden Way): Description text was updated
Record COM-2621057 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1601 Arden Way): First appeared in published agency feed
Record COM-2622389 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby addition (adds square footage) (1625 Bowling Green Dr): First appeared in published agency feed
Record RES-2623275 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby solar / battery storage (1701 Arden Way): Status changed from Issued to Expired Permit
Record COM-2519828 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1601 Arden Way): Status changed from Verify to Complete
Record COM-2619316 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby roof replacement (2247 Royale Rd): First appeared in published agency feed
Record COM-2621794 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (2150 Harvard St): Status changed from Plan Check Target to Plan Check Wait
Record COM-2620426 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1735 Arden Way 230): First appeared in published agency feed
Record COM-2623268 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby fire alarm / sprinkler (1735 Arden Way 230): Description text was updated
Record COM-2618224 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1700 Arden Way): Status changed from Issued to Finaled
Record COM-2522946 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Entitled" for 5.3 yr (since Aug 3, 2021), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (47 housing units across 0 permits).
In "Fee estimate" for 7.6 yr (since Mar 21, 2019), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (33 housing units, $10,172,244 declared valuation across 1 permit).
In "Fee estimate" for 4.3 yr (since Aug 1, 2022), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($1,400,000 declared valuation across 3 permits).
In "Fee estimate" for 9.9 yr (since Dec 9, 2016), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($2,000,000 declared valuation across 2 permits).
Pending in review for 5 mo (8.1× the 19d median) — slower than 90% of sign permits in City of Sacramento (median 19d, 90th pct 76d, n=1,075).
Issued after 2 mo — slower than 90% of roof replacement permits in City of Sacramento (median 0d, 90th pct 2d, n=19,072).
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Phoenix Builders | Commercial tenant improvement | 42 on parcel42 in ½ mi | $2,458,200 | 11 vs 8 prior+38% |
| Horizon Retail Construction | Commercial tenant improvement | 11 on parcel11 in ½ mi | $1,885,000 | 1 vs 1 prior |
| Hubbard Sign | Sign | 11 on parcel11 in ½ mi | $17,300 |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| Accessory dwelling unit (new or conversion) |
HUD Small Area Fair Market Rent · ZIP 95815
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($5,550/yr) + local voter-approved bond debt ($777/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$25,251/yr
Cash needed: $122,100
NOI: $8,426/yr
P&I: $2,806/mo
For $0/mo net cash flow
At $1,850/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,702/mo | −$2,317/mo | -22.8% | $4,936/mo | −$2,303/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $1,850/mo | −$2,104/mo | -20.7% | $4,569/mo | −$1,985/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $1,961/mo | −$1,982/mo | -19.5% | $4,463/mo | −$1,744/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
Finaled / completedFeb 14, 2019 – Feb 14, 2019
We group related permits and State housing reports into projects. That grouping is our inference, not an official record.
racking
Submittal for a racking and remodel permit issued under COM-2609189
accessibility upgrades
ANNUAL ACCESSIBILITY UPGRADE FOR ENTIRE SITE. REMOVAL OF A PORTION OF BARRIERS AT CR25 & CR28 IN THE NORTH EASTERN PORTION OF THE PARKING LOT NEAR JCP WEST & NORTH ENTRIES, AND A PROTION OF SOUTH EAST MACY'S AT SITE WALKWAY.
1689 Adren Way Space #1034
True Religion: Sign SN1 - Channel Letter Set
SIGN HOLLISTER
install 2 sets of hollister letters 1 blade sign and 1 set of hollister letters on a panel
REVISION TO COM-2609189.
REVISION TO COM-2609189: This is a revision to an issued commercial building permit. This is a tenant improvement project within an existing building for a clothing retailer. The revision includes design updates such as paint finishes and fixtures. A structural sheet was added for wall fixture attachment.
HOLLISTER SPACE 2076
Installation of interior signage: (2) edge lit channel letter sets, (1) edge lit channel letter set on aluminum panel, and (1) illuminated blade sign
REMODEL
EPC - Remodel of an existing building for a clothing retailer. The scope includes new fitting room walls, finishes, and fixtures. Replace existing VAV with new in same location due to age of unit. Existing toilet room to remain and maintain ADA clearances. Reusing electrical panel with new power and lighting design per new layout. SEE REVISION COM-2620672: This is a revision to an issued commercial building permit. This is a tenant improvement project within an existing building for a clothing retailer. The revision includes design updates such as paint finishes and fixtures. A structural sheet was added for wall fixture attachment.
REMODEL
EPC - EXPEDITED - INTERIOR REMODEL FOR KIDS FOOTLOCKER--REMOVE WING WALL, REMOVE FLOOR FIXTURES, INSTALL NEW FLOOR FIXTURES, RELOCATE POST AND PANELS, NEW POWER/DATA RECEPTACLES, NEW LIGHTING.
SUITE 2076 HOLLISTER STORE
EPC - EXPEDITED - Partial minor remodel of the existing Hollister store in the Arden Fair Mall INCLUDING NEW STOREFRONT.
REVISION TO SIG-2609070
EPC - REVISION TO SIG-2609070 - Install (1) set of channel letters with logo. It was missed from the original permit. SIG-2609070
SUITE 2076 HOLLISTER STORE
Partial minor remodel of the existing Hollister store in the Arden Fair Mall.
1689 ARDEN WY - SEPHORA SPACE 1084 - REMODEL
EPC - 1689 ARDEN WY - SEPHORA SPACE 1084 - REMODEL - WORK INCLUDES, NEW AND RELOCATED SALES FLOOR FIXTURES, FLOOR FINISH REPLACEMENT AND MINOR ELECTRICAL and Plumbing WORK.
PERFUMANIA SUITE 2136
EPC - EXPEDITED - INTERIOR REMODEL FOR NEW PERFUMANIA STORE. DEMO INTERIOR WALLS, NEW INTERIOR WALLS, NEW LIGHTING, NEW FIXTURES AND FINISHES.
SUITE 1250 LEVI'S STORE
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
28.11 acres
Assessor's classification for assessment purposes. This is not zoning.
1689 ARDEN WAY; 1689 ARDEN WAY # 1000 # 1000; 1689 ARDEN WAY # 1020 # 1020
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 277-0160-071-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| 0 vs 0 prior |
| Johnson Controls Fire Protection | Fire alarm / sprinkler | 8 on parcel8 in ½ mi | $52,590 | 0 vs 1 prior |
| Ainor Signs | Sign | 8 on parcel8 in ½ mi | $28,350 | 2 vs 0 prior |
| Gray West Construction | Commercial tenant improvement | 6 on parcel6 in ½ mi | $2,490,000 | 5 vs 4 prior |
| Sunseri Associates | Commercial tenant improvement | 6 on parcel6 in ½ mi | $1,757,096 | 1 vs 1 prior |
| Cirks Construction | Commercial tenant improvement | 3 on parcel6 in ½ mi | $1,711,520 | 0 vs 8 prior−100% |
| Jb Construction General Electric And Mechanical | Commercial tenant improvement | 3 on parcel6 in ½ mi | $680,000 | 0 vs 0 prior |
| Hughes Nelson Painting | Commercial tenant improvement | 3 on parcel5 in ½ mi | $694,588 | 2 vs 8 prior−75% |
| 1,693 |
| 57d |
| 97d |
| 172d |
| 284d |
| 97d(vs 103d prior) |
| DemolitionOn this parcel | 705 | 0d | 1d | 7d | 35d | 2d |
| Addition (adds square footage)On this parcel | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
EPC - EXPEDITED - INTERIOR REMODEL-FPP-APPLICATION-- NEW INTERIOR WALLS, NEW LIGHTING, NEW FIXTURES AND FINISHES, NEW RACKING, NEW STOREFRONT FINISHES, NEW DRINKING FOUNTAIN. BUILD OUT FOR NEW LEVI'S STORE. 3498SF
1689 Arden Way suite 2136
EPC - New LED sign interior with install
HVAC C/O
EPC - LIKE FOR LIKE REPLACEMENT OF (2) EXISTING HVAC ROOFTOP PACKAGE UNITS WITH PROPOSED. NO DUCTWORK. EXISTING ROOF CURBS AND PLATFORMS TO BE REUSED. CURB ADAPTER INSTALLED.
SHELVING
EPC - Install anchorage of Fixed & Mobile retail shelving units.
TACO BELL SIGN
EPC - Installation of new TACO BELL LED Signs. See COM-2616949 - Install (1) set of channel letters with logo. It was missed from the original permit
lighting upgrade
EPC - This project is an enhancement of an existing tenant fit-out of approximately 5,489 SF. Work includes removal of existing lighting throughout sales area with installation of new lighting in close to the same location.
REMODEL
EPC - EXPEDITED - TACO BELL BUILD OUT FOR EXPANSION OF EXISTING TACO BELL. NEW INTERIOR WALLS, NEW WALK IN COOLERS, NEW BEVERAGE EQUIPMENT, NEW FIXTURES AND FINISHES.
SIGN - Interior Arden Mall CHAMP
EPC - Install a new store front sign and connect to existing electric CHAMPS
HVAC C/O
LIKE FOR LIKE REPLACEMENT OF (2) EXISTING HVAC ROOFTOP PACKAGE UNITS WITH PROPOSED. NO DUCTWORK. EXISTING ROOF CURBS AND PLATFORMS TO BE REUSED. CURB ADAPTER INSTALLED.
REVISION TO COM-2526428
EPC - REVISION TO COM-2526428: Owner directed revisions that impact Architectural and Electrical Drawings.
REMODEL STE 1250
EPC - EXPEDITED - EXPANDING STE 1250 SIZE BY 164SF TO TOTAL SIZE 3498SF. NEW DEMISING WALL. DEMO & RECONFIGURE SERVICE DOOR ALCOVE AND PROVIDE NEW SERVICE DOOR. PROVIDE NEW STOREFRONT. INSTALL NEW UNISEX RESTROOM. INSTALL NEW 200 AMP SERVICE WITH TRANSFORMER AND PANELS.
REVISION TO COM-2523952
EPC - REVISION TO COM-2523952 - REVISIONS TO LAYOUT, LIGHTING, ETC. SEE REVISION LETTER FOR FULL SCOPE
Remodel, Retail Store
EXPEDITED - EPC - Tenant fit out of existing mercantile occupancy including new storefront, interior partitions, merchandise fixtures, millwork, electrical, mechanical, plumbing and flooring modifications. SEE REVISION COM-2607277: Owner directed revisions that impact Architectural and Electrical Drawings.
interior demo
EXPEDITED - INTERIOR DEMO-DEMO TENANT SPACE AND STOREFRONT TO UNDERSIDE OF MALL BULKHEAD. SAFE OFF SPRINKLER & ALARM PER SPRINKLER PLANS. NO OCCUPANCY UNDER THIS PERMIT.
Interior Demo - EOTC
INTERIOR DEMO.DEMO INTERIOR WALLS,& PARTITIONS. DEMO FIXTURES AND FINISHES. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residences built after January 1, 1994 are exempt). ALL WORK SUBJECT TO FIELD INSPECTION.
REMODEL
EPC - EXPEDITED - SCOPE OF WORK TO INCLUDE REMOVEL OF CEILING SOFFIT AT FRONT COUNTER-REMOVAL OF SMALL PARTS (6" POP-OUTS) AT DEMISING WALL. HOT DOG ON A STICK 586 SF
REMODEL & DEMO - ARDEN MALL STE 1348
EPC - EXPEDITED - INTERIOR REMODEL-DEMO INTERIOR NON LOAD BEARING WALLS, FIXURES AND FINISHES. BUILD NEW INTERIOR WALLS, NEW STOREFRONT, NEW SOFFITS. PLUMBING, MECHANICAL AND ELECTRICAL WORK TO CONFORM TO NEW LAYOUT. NEW FIXTURES AND FINISHES. REVISION COM-2605036 - REVISIONS TO LAYOUT, LIGHTING, ETC. SEE REVISION LETTER FOR FULL SCOPE
LOVISA - TENANT IMPROVEMENT - SPACE # 2048
EPC - TENANT INTERIOR IN EXISTING SHELL, TO INCLUDE NEW WALLS, FINISHES, FIXTURES, AND PAINT. NEW INTERIOR STOREFRONT FINISHES
EOTC
EOTC - Annual accessibility upgrade for entire site. Removal of a portion of barriers at CR35B in the north-western portion of parking lot near enclosed mall entry #5, adjacent to sears entry towards parking garage.
PANDORA SIGN PERMIT
EPC - Install (2) new channel letter signs and (1) channel logo sign
Interior Signage - #1286
EPC - EXPEDITED - #1286 Installation of interior signage and illuminated light box
REVISION TO COM-2500725
EPC - SUPPLEMENTAL TO COM-2500725, COMMERCIAL TI REPLACE EXISTING HVAC UNIT. REVISED HVAC UNIT SIZE AND FRAMING.
LOVISA - TENANT IMPROVEMENT - SPACE # 2048
EPC - TENANT INTERIOR IN EXISTING SHELL, TO INCLUDE NEW WALLS, FINISHES, FIXTURES, AND PAINT. NEW INTERIOR STOREFRONT FINISHES
remodel
EPC - EXPEDITED - INTERIOR REMODEL OF EXISTING TENANT SPACE FOR USE BY JEWELRY STORE (MERCANTILE -NO CHANGE IN USE), INCLUDING NEW WALLS, DOORS, CEILINGS, LIGHTING, FINISHES, DISPLAY FIXTURES, PLUMBING FIXTURES AND ASSOCIATED MODIFICATIONS TO EXISTING ELECTRICAL, MECHANICAL, FIRE SPRINKLER, AND FIRE ALARM SYSTEMS
REVISION TO FPP-2507538
EPC - EXPEDITED - REVISION TO FPP-2507538: Amendment includes revised structural sheets and added landlord comments.
Interior Signage -Suite 1286
Installation of interior signage and illuminated light box
remodel
EPC - EXPEDITED - #1286 The new work is limited to tenant improvement of an exg. structure designed for retail sales. Work to include new storefront, sales area, stock room walls, and exg. restroom. SEE REVISION FPP-2513338 for notation updates, epoxy specs, and structural details - 6/25/25 - NCB
1689 Arden Way
Install new illuminated channel letters and sign box with push-through letters; install vinyl on wall.
1689 ARDEN STE 1280
EPC - COMMERCIAL TENANT IMPROVEMENT OF NEW HVAC UNIT. REMOVE AND REPLACE EXISTING HVAC UNIT. SEE REVISION COM-2516177 for equipment change - 7/31/25 - NCB
1689 ARDEN WAY #2021
Installation of (2) qty. illuminated wall signs.
1689 Arden Way, #1028
install one (1) illuminated wall sign
1689 Arden Way
Install new illuminated channel letters and sign box with push-through letters; install vinyl on wall.
REMODEL SBARRO FOOD COURT
EPC - EXPEDITED - Partial remodel of the existing Sbarro food court restaurant in an existing mall food court, consisting of replacing kitchen equipment and finishes.
Accessibility Upgrades, Exterior.
EPC - ACCESSIBILITY UPGRADE, REMOVAL OF A PORTION OF BARRIERS AT CURB RAMP 3 IN THE SOUTHERN PARKING LOT NEAR FOREVER 21, at Arden Fair Mall.
1686 Arden Way
Installation of new LED signs
lululemon remodel
EXPEDITED - EPC - Space #1274. Expansion of existing lululemon retail space in interior mall. New non-load bearing walls, expanded storefront, new plumbing, electrical & mechanical for new layout.
REVISION 2 - Arden Mall H&M Remodel
EPC - EXPEDITED - SECOND REVISION (DELTA 3) TO MAIN PERMIT (COM-2404703) CONSISTS OF MEP CHANGES.
REVISION 2 - Arden Mall H&M Remodel
SECOND REVISION (DELTA 3) TO MAIN PERMIT (COM-2404703) CONSISTS OF MEP CHANGES.
1689 ARDEN WAY
EPC - Install a voluntary fire alarm system for Apple Store at Arden Fair. No new interior construction.
DEFERRED - FIRE ALARM for Arden Mall H&M Remodel
EPC - DEFERRED FIRE ALARM TO MAIN PERMIT COM-2404703. Scope of work includes new fire alarm panel and devices. Deferred fire alarm plans were granted to permit number COM-2404703.
Uniqlo - Arden Mall - Suite 1254
EPC - Revision to COM-2407382: Scope of work includes changes to the storefront, lighting, and structural elements.
Uniqlo - Arden Mall - Suite 1254
Revision to COM-2407382: Revision includes changes to interior partitions and storefront, relocation of the fire extinguisher, changes to structural members, and MEP. T
REVISION - Arden Mall H&M Remodel
EPC - REVISION (DELTA 2) TO MAIN PERMIT (COM-2404703) CONSISTS OF ADDING NEW EXIT DOOR, ANCHOR SUBSTITUTE, STOREFRONT CHANGES, MEP CHANGES.
Uniqlo - Arden Mall - Suite 1254
EXPEDITED - EPC - UNIQLO Remodel to Suite 1254 at Arden Mall for 11,249 sf space at existing retail space
DEFERRED Alarm - H&M Remodel Arden Mall
EPC - DEFERRED TO COM-2404703. Fire Alarm Plans
DEFERRED Sprinklers - H&M Remodel Arden Mall
EPC - DEFERRED TO COM-2404703. Fire Sprinkler Plans
Arden Mall H&M Remodel
EXPEDITED - EPC - Full remodel of lease space in existing Arden Mall shell space. Improvements include combining 3 existing spaces, new partitions, new wall finishes, new storefront, new electrical panels, new mechanical units and system, new lighting fixtures, new display fixtures, and new toilet room fixtures and restroom.
SUITE 1274 interior demo
EXPEDITED - FPP- SUITE 1274 - Interior demo-Demo interior walls, storefront bulkhead. Cap off water and sewer lines. Remove electrical panel.
1689 ARDEN WAY SPACE# 1254
install (2) sets of LED illuminated wall signs (Logo+UNIQLO) as per attached plans.
REVISION TO FPP-2400267
EPC - EXPEDITED - revision to FPP-2400267: Update to interior lighting distribution
EOTC INTERIOR DEMO ONLY
EOTC - SPACE #1254 - ARCHITECTURAL WORK COMPRISES DEMOLITION OF PORTION OF DEMISING WALL FOR NEW DOOR OPENING. DEMOLITION OF DOOR OPENINGS, PARTITIONS, FLOOR AND WALL FINISHES AT RESTROOMS.
REVISION TO FPP-2400267
EPC - EXPEDITED - REVISION TO FPP-2400267 - Bracing existing Bulkhead Soffit that was not self-supporting.
(2) illuminated signs
installation of 2 illuminated signs
1689 ARDEN WAY #1031 - REMODEL
EPC - EXPEDITED - Convert cosmetic retailer into Jewelry store inside Arden Mall: Project will include Millwork, Entry Gate, & Lighting. SEE REVISION FPP-2408863 - Bracing existing Bulkhead Soffit that was not self-supporting. revision - FPP-2411167 -- Update to interior lighting distribution
1689 Arden Way #1102 sign permit
Sign Permit: 1'-2"(h)x10'-0"(w) Top cabinet, 10 1/2"(h) x 6'-8 1/4"(w) bottom cabinet ILLUMINATED PUSH THRU CABINET SIGN. 1'-3" diameter ILLUMINATED PUSH THRU CABINET BLADE SIGN (DOUBLE SIDES).
1689 ARDEN WAY #1034 - SIGN
Installation of (1) set of channel letters - LEDs on wall.
Suite 1102 Wetzel's Pretzels
EPC - EXPEDITED - REMODEL OF EXISTING RETAIL SPACE FOR CONSTRUCTION OF WETZELS PRETZELS STORE INCLUDING ALL REQUIRED PARTITIONS, CEILINGS, FLOORS, MILLWORK, EQUIPMENT, NEW TOILET ROOM, NEW PLUMBING FIXTURES, PLUMBING SYSTEMS, ELECTRICAL SYSTEMS, AND MECHANICAL SYSTEMS WITHIN THE LANDLORD'S LEASE SPACE.
SUITE 1192 - REMODEL
EPC - EXPEDITED - FPP PROGRAM- Reconfigure suite 1192 by demolishing two demising walls. Remove all fixtures and finishes. Demolish storefront to mall bulkhead. Cap off sewer lateral, lavatory water supply. Remove electrical panels and transformers. Sprinkler and Fire alarm modifications. Landlord work no occupancy.
SUITE 1254 - REMODEL
EPC - EXPEDITED - FPP PROGRAM - Reconfigure suite 1254 by demolishing three demising walls. Remove all fixtures and finishes. Demolish storefront to mall bulkhead. Cap off sewer lateral, lavatory water supply. Remove transformers. Landlord work no occupancy.
FPP-1689 Arden Blvd Suite 1102 & 1106 REMODEL
EPC - EXPEDITED - FPP Interior demo of existing demising wall between suites 1102 & 1106. Rebuild demising wall and add 38sf to suite 1102 from suite 1106. Install new rear service corridor door to suite 1102. Remove plumbing fixtures and cap sewer lateral for suite 1102, new lighting. Add one (1) new fire sprinkler head at ex. corridor reconfigured service door alcove ceiling.
Suite 1034 Sports Fever
EPC - EXPEDITED - FPP PROGRAM-Suite #1034 Sports Fever. Interior remodel- Demo interior walls, rebuild wall to enlarge sales floor by 300sf. Remove display fixtures casework and replace with slat wall. New lighting in expanded sales floor area. Sprinkler modifications in expanded sales. New flooring and fixtures.
FPP 1689 Arden Blvd REMODEL
EPC - EXPEDITED - Replace and add new appliances (convection oven, fridges, wire shelves).
1689 Arden Way #1280 Storage Racking
EPC - EXPEDITED - Storage racking
FPP-1689 Arden Blvd Suite# 1280 REMODEL
EPC - EXPEDITED - existing leased area: 7,242 SF existing leased area to be remodeled: 2,813 SF new area added to leased area: 1,945 SF Expansion of existing retail tenant backstage space and improvement of existing retail tenant sales area. Work includes non-structural partitions, ceiling, finishes, furniture, and related HVAC, electrical and plumbing work in the backstage area. Relamping of lighting fixtures throughout sales area. Arden Mall is confirmed valid for FPP review.
Interior Demo - Suite 1106
EPC - EXPEDITED - Suite 1106 Interior demolition of non-loadbearing walls, fixtures, and finishes - 2582sqft Vacant lease space - not for occupancy
1689 Arden Blvd #1268 REMODEL
EPC - EXPEDITED - THE SCOPE OF THIS PERMIT IS TO RECONFIGURE APPROXIMATELY 2,598 S.F OF EX. INTERIOR SPACE IN ORDER TO PREPARE: 1) LANDLORD DELIVERY CONDITIONS FOR DEMISING WALLS, DEMO & UTILITY IMPROVEMENT STUB INTO & ASSEMBLE SUITE 1280 FUTURE EXPANSION SPACE (WITHOUT CONNECTING IT TO SUITE 1280. ANY CONNECTION WILL BE COMPELTED UNDER SEPARATE FUTURE PERMIT.) 2) TO INSTALL NEW DEMISING WALL AND REAR EXIT DOOR TO REDUCE THE SIZE OF SUITE 1268 BY 1,229 S.F.; AND 3) TO RECONFIGURE THE 1-HOUR FIRE RATED EXIT CORRIDOR SERVING EX. SUITE 1274 AND SUITE 1268 AS IT IS REDUCED AND RECONFIGURED. THIS PERMIT INCLUDES FIRE SPRINKLER, ELECTRICAL, HVAC DUCT TERMINATIONS, PLUMBING EXTENSION STUB IN & WALL CONSTRUCTION.
Shiekh Shoes #2160
EPC - Interior remodel within Arden Fair Mall suite #2160. Demolition of interior partitions, new interior partitions, new fixtures, new lighting, new wall and floor finishes.
hvac apple store
EPC - Installation of (3) new ductless split systems for the Apple Arden Mall location. (1) 3-ton Mitsubishi unit and (2) 2-ton Mitsubishi units. Electrical will be run to the existing electrical panels inside the store through existing roof penetrations.
REMODEL/ RACKING
EPC - REMODEL: Installation of stockroom shelving for existing retail space. Non high pile storage. No storage over 12'. 8'4" max height
1689 Arden Way Suite 2056-Install two signs - CURV
Install new signage. Channel letter wall sign, illuminated.
REMODEL/ RACKING SUITE 2056
EPC - EXPEDITED - REMODEL/ RACKING: SUITE 2056 Installation of stockroom shelving for existing retail. Non high pile storage. No storage over 12'. Max height 10'
Suite #2506 - FPP Torrid Remodel
EPC - EXPEDITED - Suite #2506 - Torrid Remodel - Project scope is of a new Torrid Curve space tenant build-out in an existing shell building for the sale of retail clothing, and accessories. Remove non-load bearing interior walls and install new non-load bearing walls. Install tenant fixtures and lighting. Reuse HVAC with some new ducts as per mechanical sheets, within previous tenant use/leaded premises.
FPP Project - PERMIT FOR NEW PERMIT HOLDER
PERMIT FOR NEW PERMIT HOLDER. PLANS REVIEWED AND APPROVED UNDER FPP-2209992 EPC - EXPEDITED - Interior tenant fit-out for new tenant in existing space. Demo and new non-load bearing walls, new ceiling & lighting. Modify MEP systems as required for new layout.
FPP Project
EPC - EXPEDITED - Interior tenant fit-out for new tenant in existing space. Demo and new non-load bearing walls, new ceiling & lighting. Modify MEP systems as required for new layout.
FPP REMODEL SPACE # 1084
EPC - EXPEDITED - For space # 1084. This project is a retrofit of an existing tenant fit out of approximately 5,489 sf. Work include, new and relocated sales floor fixtures, patching and repairing existing flooring, and minor electrical work, storefront to remain as is.
1689 Arden Wy # 2056 - Install Sign (Torrid)
Install new signage - channel letter wall sign, illuminated.
Suite #2506 - Torrid Remodel
Suite #2506 - Project scope is of a new Torrid Curve space tenant build-out in an existing shell building for the sale of retail clothing, and accessories. Remove non-load bearing interior walls and install new non-load bearing walls. Install tenant fixtures and lighting. Reuse HVAC with some new ducts as per mechanical sheets, within previous tenant use/leaded premises.
1689 Arden Wy # 1336 - Install Sign (JD)
Installation of 1 set of LED illuminated Pan Channel letters on an interior storefront mall wall.
Suite #1046 remodel
EPC - EXPEDITED - TENANT IMPROVEMENT IN EXISTING LEASE SPACE IN INDOOR SHOPPING CENTER, LEVEL 1 OF 1. VALLIANI JEWELERS TENANT IMPROVEMENTS WILL PROVIDE COMPLETE FINISH OUT OF THE INTERIOR, TO INCLUDE NEW FLOOR AND WALL FINISHES, MILLWORK, NEW LIGHTING, AND MODIFICATIONS TO EXISTING HVAC. EXISTING STOREFRONT TO REMAIN. EXISTING ACCESSIBLE EMPLOYEE RESTROOM TO REMAIN.
JD Sports - Interior Mall TI
EPC - Interior tenant fit-out for new tenant in existing space. Demo and new non-load bearing walls, new ceiling & lighting. Modify MEP systems as required for new layout.
1689 Arden Wy # 1028 - Install Sign (T-Mobile)
Installation of (1) S/F LED illuminated Pan Channel letter wall display.
CHAMPS SPORTS - UNIT #1356 REMODEL
EXPEDITED - EPC - INTERIOR ALTERATION TO AN EXISTING RETAIL LEASE SPACE. CONVERTING FOOTACTION TO CHAMPS STORE (SPACE # 1356) - New ADA fitting room, lighting pkg, finish & fixture pkg throughout, existing HVAC to remain w/modifications to ductwork/diffusers for the new layout.
1689 Arden Wy # 1350 - Install (2) Illuminated Signs (CHAMPS)
Install (2) single faced illuminated 9' wall sign. Installation of 10 Champs second surface vinyl
1689 Arden Wy # 1350 - Install Signs (CHAMPS)
Install (2) non-illuminated temporary sign on foam backer. Installation of 10 surface vinyl
Commercial Remodel (Space #23 Kiosk)
EPC - Install new prefabricated kiosk in common area of Arden Fair Mall Commercial Remodel (Space #23 Kiosk)
FPP- 1689 Arden Way Suite # 1070 REMODEL
EXPEDITED - EPC - T.I as follow: Minimum work to adapting the former chocolate shop to a new coffee shop. 1) Fixing existing Stainless Steel countertop to serve as a flat surface to lay out the new equipment 2)Rearrangement of electrical circuits in existing panel "A" to serve new coffee equipment.
1689 Arden Wy # 2060 - Install Sign (MINI SO)
Install (1) Illuminated wall sign.
FPP-1689 ARDEN WAY #1360 INTERIOR DEMOLITION
EXPEDITED - Demolition of an existing ATM room at the Arden Fair Mall. ATM machines have already been removed by the bank vendor, and this scope includes removing the perimeter walls, ceilings, and associated building services.
Install Signs - 1689 Arden Way #2178 (Foot Locker)
Install two (2) signs.
Commercial Remodel (Suite #2178)
EXPEDITED - EPC - Commercial Remodel Project with architectural, mechanical, electrical and plumbing scope of work. Suite #2178
Install Signs - 1689 Arden Way #2076 (Hollister)
Install two (2) illuminated wall signs, install one (1) illuminated blade sign.
Seoul Express - Arden Fair Remodel
EPC - Suite #2028 - New DryWall Ceiling, New Lights, Demo Existing Hood & Replace existing Counter Top with Granite
Temporary Generator to supply (2) RV's
Temporary generator to supply (2) RV's for mobile COVID-19 testing site. All work subject to field inspection approval. See site map for location.
1689 Arden Way # 2034 (Lids) sign
Install one (1) internally LED illuminated wall sign.
1689 Arden Way SIGN (Fresh N Fitted)
Install one(1) illuminated wall sign.
T-Mobile Sign (Arden Fair Suite 2184C)
SUITE 2184C - install (1) attached / illuminated halo sign
AERIE on Arden Way Unit 2062
Install 2 Attached Illuminated Signs
Shoe Palace SIgnage - SUITE 2095
SUITE 2095 - install 2 interior attached / illuminated channel letter signs
1689 Arden Way (T-Mobile) sign
Installation of one (1) set of LED illuminated pan channel letters on to wall.
Suite 2095
EXPEDITED - EPC - Suite 2095, Minor interior tenant tenant improvement of an existing retail store located inside Arden Fair Mall.This application is for the installation of storefront blades and storage racks.
Suite 2095
EXPEDITED - EPC - Suite 2095, Remodel of Commercial Building - Minor Interior Tenant Improvement of an existing retail space which includes: new partition, new storefront system, new lighting, electrical & HVAC, and new finishes.
Revision 1164
EPC - Revision to FPP-1923188, permit requested by inspector: electrical transformer needs to placed above toilet room, on the platform
Revision 2062
EPC - Revision to FPP-1922690, Added detail that shows metal studs attached to the bottom of the existing structural beams so that it can properly support the suspended drywall ceiling.
Suite 2095
EXPEDITED - EPC - Suite 2095, Install 2 new duct smoke detectors for fire/smoke damper closure.
#1164 Revision
EPC - Revision to FPP-1923188, issued commercial permit: field conditions found after demo have necessitated construction changes.
Suite 1046
EPC - Suite 1046, Helzberg Diamonds at Arden Fair Mall includes removing an existing case and replacing it with a new fixture, removing storefront material and replacing it new back lit super graphic and adding a new light fixture for the new case.
SUITE #2011 REVISION TO FPP-1922443
EXPEDITED - REVISION TO FPP-1922443: ALTERNATE MEANS OF CONSTRUCTION TO CONSIST OF : SWITCHED FROM LOOP VENTS TO AIR ADMITTANCE VALVES (AMDMC IS ON FILE)
Suite 2062
EXPEDITED - EPC - Suite 2062, Remodel of Commercial Building - Tenant improvement of retail store (Aerie) at Arden Fair, work to include Architectural, Mechanical, Electrical & Plumbing
1689 Arden #2062 - Remodel
EXPEDITED - Interior Demolition & Remodel to reconfigure existing tenant space to prepare for future occupant. New demising wall for new suite #2062
Suite 1164
EXPEDITED - EPC - Remodel of Commercial Building - Suite 1164 ( 7,441 sf), Remodel of Commercial Building - Tenant improvement of retail store (American Eagle) at Arden Fair, work to include Architectural, Mechanical, Electrical & Plumbing
1689 Arden Way #1164 - American Eagle Signage
Suite #1164 - Install 2 illuminated wall signs
THAI KITCHEN ( #2030) REVISION TO FPP-1906575
EXPEDITED - THAI KITCHEN (#2030) REVISION TO FPP-1906575: REVISED THE FRONT SERVICE COUNTER PROFILE; DELETE TELEVISION RECESSED BOX; REVISED THE LIGHT FIXTURES TO MATCH AS - BUILT CEILING
tHAI KITCHEN - REVISION TO FPP-1906575
THAI KITCHEN REVISION TO FPP-1906575: REVISED THE FRONT SERVICE COUNTER PROFILE; DELETE TELEVISION RECESSED BOX; REVISED THE LIGHT FIXTURES TO MATCH AS - BUILT CEILING
Kiosk
EXPEDITED - EPC - Remodel of Commercial Building - Build a Kiosk in the Open-Air Portion of the Arden Fair Mall Court. This Kiosk will be not attached to walls of the structure. Install Equipment and Finishes per Plan. Connect to Plumbing and Electrical as appropriate. Start Up, Test, and Operate Equipment for Tenant Use.****EXPEDITED - REVISION TO FPP-1922443: ALTERNATE MEANS OF CONSTRUCTION TO CONSIST OF : SWITCHED FROM LOOP VENTS TO AIR ADMITTANCE VALVES (AMDMC IS ON FILE)****
REVISION TO FPP-1920654
EXPEDITED - REVISION TO FPP-1920654: Adding electrical floor outlet.
Suite 1082
EXPEDITED - EPC - Suite 1082, Remodel of Commercial Building - TI - Remodel of (E) retail space including doors, partitions, ceilings, lighting, fixtures, etc. MEP work. SEE REVISION FPP-2001190: Adding electrical floor outlet.
Quay Sign (SUITE 1082)
SUITE 1082 - install (1) attached / illuminated channel letter sign
ARDEN MALL # 2028- REMODEL
EXPEDITED - ARDEN MALL # 2028- REMODEL TO CONSIST OF : DEMO- EXISTING FRONT 5' +/- OF NORTHERLY EXISTING NEUTRAL PIER PORTION OF EX. ELEMENTS IN # 2028 ; EXISTING DEMISING WALL & BULKHEAD SHALL REMAIN AS IS; MINOR NEUTRAL PIER MODIFICATIONS TO SPACE # 2028 TO ACCOMODATE NEW WALL FINISHES AND SPECS.
Gymboree Sign (SUITE 2082)
SUITE 2082 - install interior attached / illuminated sign
Suite 2095
Suite 2095, Remodel of Commercial Building - Minor Interior Tenant Improvement of an existing retail space which includes: new partition, new storefront system, new lighting, electrical & HVAC, and new finishes.
Sardinia Jewelers Sign (SUITE 2054)
(SUITE 2054) install (1) interior attached / illuminated channel letter sign
Suite 2095
Suite 2095, Remodel of Commercial Building - Minor Interior Tenant Improvement of an existing retail space which includes: new partition, new storefront system, new lighting, electrical & HVAC, and new finishes.
Suite 1164
EPC Submittal - Remodel of Commercial Building - Suite 1164, Remodel of Commercial Building - Tenant improvement of retail store (American Eagle) at Arden Fair, work to include Architectural, Mechanical, Electrical & Plumbing
Change-out installation of Electric - 010 gallon to Electric - 010 gallon, located inside building, screening not required.
Kiosk
Remodel of Commercial Building - Build a Kiosk in the Open-Air Portion of the Arden Fair Mall Court. This Kiosk will be not attached to walls of the structure. Install Equipment and Finishes per Plan. Connect to Plumbing and Electrical as appropriate. Start Up, Test, and Operate Equipment for Tenant Use.
Suite 2095
EXPEDITED - EPC - Suite 2095, Remodel of Commercial Building - Relocation of HVAC shaft located in suite 2095 to accommodate future lease agreement.
Suite 1082
Suite 1082, Remodel of Commercial Building - TI - Remodel of (E) retail space including doors, partitions, ceilings, lighting, fixtures, etc. MEP work.
Suite 2062
Suite 2062, Remodel of Commercial Building - Tenant improvement of retail store (Aerie) at Arden Fair, work to include Architectural, Mechanical, Electrical & Plumbing
Suite 2095
Suite 2095, Remodel of Commercial Building - Relocation of HVAC shaft located in suite 2095 to accommodate future lease agreement.
Suite 2114
EXPEDITED - EPC - Suite 2114, Remodel of Commercial Building - TI - Remodel of (E) retail space including partitions, fixtures, lighting, finishes, etc.
Vans (Arden Mall Interior Sign) SUITE 2114
SUITE 2114 - install attached interior signs (1) illumiinated & (1) non-illum.
sun glass hut sign
construct 3 attached illuminated signs "SUNGLASS HUT" 16 SQ FT,16 SQ FT AND 10.27 SQ FT ILLUMINITATED SIGNS.
EPC Submittal - Perform work to bring property up to standard for ADA code in accordance with agreement between Arden Fair Mall and Building Department. Including striping, signage, and misc. concrete/asphalt work where necessary to meet code.
Suite 2054
EXPEDITED - EPC - Suite 2054,Remodel of Commercial Building - Interior tenant improvements to suite 2054 located at the Arden Fair Mall to prep for new Jewelry Store
Suite 1030
EXPEDITED - EPC Submittal - Remodel of Commercial Building - Interior tenant build-out of existing mercantile space in existing mall. New finishes, new lighting, new ceiling, new fixtures.
Interior Demolition (SUITE 2054)
EXPEDITED - Suite 2054 Interior demolition of 1414sf tenant space for future build-out (on separate permit)
Suite 2030
EXPEDITED - EPC - Suite 2030, RENOVATION OF EXISTING FOOD COURT RESTAURANT SALES AREA, INCLUDING REPLACING RENOVATION OF EXISTING FOOD COURT RESTAURANT SALES AREA, INCLUDING REPLACING****EXPEDITED - THAI KITCHEN (#2030) REVISION TO FPP-1906575: REVISED THE FRONT SERVICE COUNTER PROFILE; DELETE TELEVISION RECESSED BOX; REVISED THE LIGHT FIXTURES TO MATCH AS - BUILT CEILING****
Suite 2114
Suite 2114, Remodel of Commercial Building - TI - Remodel of (E) retail space including partitions, fixtures, lighting, finishes, etc.
Suite 2054
Suite 2054,Remodel of Commercial Building - Interior tenant improvements to suite 2054 located at the Arden Fair Mall to prep for new Jewelry Store
Proteam Sports Signage
install attached / illuminated channel letter sign and blade sign. No Planning Review required for interior Arden Fair Mall Signs
JOURNEYS- Arden Fair Mall Sign
Install (1) attached / illuminated interior mall sign
REVISION TO FPP-1906578
EXPEDITED - REVISION TO FPP-1906578: Revised head spacing in changing rooms due to partial height walls. Removed heads from approved drawings.
Ichiban Sushi Sign (SUITE 2018) Interior Mall Sign
SUITE 2018 - Install attached / illuminated channel letter sign-Interior Mall Sign No Planning Review required
REVISION TO COM-1911175
EXPEDITED - REVISION TO COM-1911175: Change to equipment to reflect field conditions
Suite 2018
EXPEDITED - EPC - Suite 2018, Remodel of Commercial Building - Tenant improvements to existing space 2018. Minor improvements to front counter, overhead soffit, and floor/wall finishes to accommodate new tenant. No work in Kitchen area.
Ansul
Reconfigure existing ansul system for new equipment SEE COM-1912583: Change to equipment to reflect field conditions
Suite 1030
EPC Submittal - Remodel of Commercial Building - Interior tenant build-out of existing mercantile space in existing mall. New finishes, new lighting, new ceiling, new fixtures.
Suite 2036
EXPEDITED - EPC - Suite 2036, Remodel of Commercial Building - Interior tenant improvement for Journeys retail store. Work includes new non bearing partitions, flooring, finishes, sales fixtures, cashwrap, tile/panel at storefront, & new light fixtures.
REVISION TO FPP-1902493
EXPEDITED - REVISION TO FPP-1902493: Fire Alarm alterations per plans. No MaceRich stamp required for this revision Per Ron Yasui.
Suite 2076
EXPEDITED - EPC - Suite 2076, tenant improvement (SEE FPP-1913550: Revised head spacing in changing rooms due to partial height walls. Removed heads from approved drawings.)
Hollister Co. Sign Permit-Arden Fair interior mall Sign
Install (3) attached / illuminated wall signs & (1) attached /illuminated blade sign
Suite 2018
Suite 2018, Remodel of Commercial Building - Tenant improvements to existing space 2018. Minor improvements to front counter, overhead soffit, and floor/wall finishes to accommodate new tenant. No work in Kitchen area.
Boba Loca Sign SUite #1112 & #1116
Suite 1112/1116 Install 2x Attached illuminated signs for Boba Loca inside Arden Fair Mall.
1689 Arden Way Interior Demolition
EXPEDITED - Demolition of existing neutral piers and service "Hard Lid."
Suite 2036
Suite 2036, Remodel of Commercial Building - Interior tenant improvement for Journeys retail store. Work includes new non bearing partitions, flooring, finishes, sales fixtures, cashwrap, tile/panel at storefront, & new light fixtures.
Ansul System - SUITE 1112
SUITE 1112 - Complete Hood / Duct Fire system
Suite 1280
Suite 1280, Revision to Issued Permit FPP-1823905 - Revision to previously approved P# FPP-1823905. Changes to the design of the HVAC system.
Suite 1280
EXPEDITED - EPC - Suite 1280, Remodel of existing tenant retail sales area work includes the replacement of existing sales area fixtures and finishes with the addition of a video wall.
1689 Arden Remodel
EXPEDITED - Interior remodel to include: limited demolition per plans. Addition of demising wall to split suites 2076 and 2078. . No further work to be included. Future remodel to be pulled by separate contractor.
Suite 2030
Suite 2030, RENOVATION OF EXISTING FOOD COURT RESTAURANT SALES AREA, INCLUDING REPLACING RENOVATION OF EXISTING FOOD COURT RESTAURANT SALES AREA, INCLUDING REPLACING
Suite 2076
Suite 2076, tenant improvement
Pink VIctoria Secret Sign Permit - Interior Mall Sign
Install (2) attached / illuminated Wall Signs & (1) attached / Illuminated Blade Signs
STOE 45
EXPEDITED - EPC - Remodel of Commercial Building - Remodel of (E) remote stock room for Pink Victoria's Secret at Arden Fair.
Cornerstone Creamery Sign permit-Arden Fair Mall
Install (2) attached / illuminated interior Mall signs. No Design Review required.
Suite 1112
EXPEDITED - EPC - Suite 1112, Remodeling of existing suite (1,148 sf lease area) for a new business in Arden Fair Shopping Center. REVISION TO FPP-1902493: Fire Alarm system alterations per plans.
Remodel
EXPEDITED- 15-10-10- Space 2164-Remodel existing retail space to include doors, partitions, ceilings, lighting, fixtures, MEP Racking permit pulled separate COM-1900153.
Suite 1186
EPC - Revision to FPP-1809300 - Minor revision to the storefront awning design with the addition of two support brackets on each end.
Suite 1186
Revision to FPP-1809300 - Minor revision to the storefront awning design with the addition of two support brackets on each end.
85c Bakery Cafe Signs
install (2) attached / illuminated channel letters w/ multi-layer logo. (1) is outside of the mall (req Planning AP)
Change-out installation of Gas - 050 gallon to Gas - 050 gallon, located inside building, screening not required.
Suite 1280
Suite 1280, Revision to Issued Permit FPP-1823905 - Revision to previously approved P# FPP-1823905. Changes to the design of the HVAC system.
Bombolone Cafe Remodel
EXPEDITED - Interior Remodel. Install/change out equipment to convert an existing ice cream shop into a coffee shop. Relocate existing hand sink and install new prep sink. All plumbing and electrical subject to field inspection.
#2164 - Interior Demolition
# 2164 - Interior Demolition of NON BEARING WALLS, CEILING TILES; STOR FRONT (FACADE), MECHANICAL , ELECTRICAL.
SUITE #1112 & 1116 - Interior Demolition (OTC APPROVED Expedite)
EXPEDITED - SUITE # 1112 & 1116 : Interior Demolition to both suites to prepare for TENANT IMPROVEMENT(UNDER SEPARATE PERMIT)
REVISION TO COM-1824109
EXPEDITED - (REVISION TO COM-1824109: REVISED RESTAURANT DROP CEILING TO OPEN; REMOVED PENDENT HEADS
Suite 1112
EPC Submittal - Remodel and Change of Use of Commercial Building - Remodeling of existing suite (1,148 sf lease area) for a new business in Arden Fair Shopping Center.
Suite 2112
EXPEDITED - EPC - Suite 2112, TENANT IMPROVEMENT IN MALL SUITE WITH NEW STOREFRONT FACADE AND INTERIOR REMODEL INCLUDING ELECTRICAL AND PLUMBING. MECHANICAL IS EXISTING AND TO BE ALTERED.
Suite 1148
EPC - Suite 1148, Revision to Issued Permit FPP-1805301 - Post Permit Revision, See letter in the APP file
Utility Room Fire Wall & Sprinklers
EXPEDITED - Install wall and door to existing utility room. Install new sprinkler sprinkler head for area, new light fixture and switch, adding venting for existing regulators through the roof.
STOE 45
Remodel of Commercial Building - Remodel of (E) remote stock room for Pink Victoria's Secret at Arden Fair.
Remodel
EXPEDITED - Shelving units for existing retail space, Max 8' high, space 2164
Suite 1148
Suite 1148, Revision to Issued Permit FPP-1805301 - Post Permit Revision
Fire alarm
(SPACE 1148)Fire alarm scope involves the relocation of (2) existing ceiling strobes and addition of (5) new individual monitor modules for the fire suppression system shutdown *****EXPEDITED - (REVISION TO COM-1824109: REVISED RESTAURANT DROP CEILING TO OPEN; REMOVED PENDENT HEADS****
Suite 1280
Remodel of existing tenant retail sales area work includes the replacement of existing sales area fixtures and finishes with the addition of a video wall.
Suite 1046
EXPEDITED - Fire as built, Revision to FPP-1811850, Suite 1046, Interior work includes new finishes, fixtures, furniture, millwork, and lighting. Installation of new equipment includes HVAC, electrical, plumbing, sprinkler system, and fire alarm devices.
(SUITE - 2118) FIRE ALARM SMOKE DETECTOR /SENSOR
(SUITE 2118) REPALCEMENT OF FIRE ALARM SMOKE DETECTOR AND SENSOR THAT IS COMPATIBLE WITH THE (E) FACP.
Helzberg Diamonds at Arden Fair Mall
2 Attached non-illuminated interior signs over corner unit entry.
Dispatch Room, ARDEN MALL REMODEL ADDITION
enclose existing 2300 sq ft loading dock area to create new storage/trash enclosure area, add 48 sq ft of office space and remodel existing maintenance office to dispatch room, remodel existing 1177 sq ft lease space area to common area, work also to include exterior façade upgrade, site work, landscaping, mechanical, plumbing, finishes, new partition walls. BAKER CAFE INTERIOR/EXTERIOR REMODEL WORK UNDER SEPERATE PERMIT. - PLNG-INSP
Hot Dog On A Stick at Arden Fair Mall
Interior Attached Illuminated Sign
Suite 1044
EXPEDITED - EPC - Suite 1044, Tenant Improvement in Arden Fair Mall for new retail jewelry store Alex and Ani
Suite 2118
EXPEDITED - EPC - Remodel of Commercial Building - Interior Tenant Improvement for Cold Stone Creamery
Garage - Arden Fair Mall (Interior) Sign Permit
Install (1) attached / illuminated neon channel letter sign and (1) attached / illuminated blade sign. These are exempt from planning approval as they are interior mall signs. Macerich's approval on pg. 01 04
Suite 1046
EPC - Wall Brace, Revision to FPP-1811850, Suite 1046, Interior work includes new finishes, fixtures, furniture, millwork, and lighting. Installation of new equipment includes HVAC, electrical, plumbing, sprinkler system, and fire alarm devices.
Suite 1046
Wall bracing, Revision to FPP-1811850, Suite 1046, Interior work includes new finishes, fixtures, furniture, millwork, and lighting. Installation of new equipment includes HVAC, electrical, plumbing, sprinkler system, and fire alarm devices.
ALEX AND ANI Sign permit-Interior Mall Sign
Install (1) Attached / Illuminated , Macerich approved interior mall sign Exempt from planning review
L'Occitane En Provence - Arden Fair Mall
Install 2 Attached Illuminated signs
Suite 1186
EXPEDITED - EPC - Suite 1186, 85c Bakery/Cafe, existing vacant space to be remodeled into a bake shop, minor modifications on exterior storefront, new finishes, replace RTUs, new restroom, new finishes
Gen BBQ Sign
Installation of 1 attached illuminated sign, 1x wall sign
Suite 2112
Suite 2112, TENANT IMPROVEMENT IN MALL SUITE WITH NEW STOREFRONT FACADE AND INTERIOR REMODEL INCLUDING ELECTRICAL AND PLUMBING. MECHANICAL IS EXISTING AND TO BE ALTERED.
Suite 1044
Suite 1044, Tenant Improvement in Arden Fair Mall for new retail jewelry store Alex and Ani
Suite 1312
EXPEDITED - EPC - Suite 1312, Interior renovation of existing demised retail tenant space. Back of House to remain unchanged. Electrical panel and transformer to remain. No change in occupancy or extent of existing demising walls. Sales floor: new finishes (marble tile: floor; paint: wall & ceiling); installation of new fixtures; existing mechanical units & ductwork to remain, be re-used; new sales sink in new location; remove recessed lights; new tracking lighting and power. Storefront to remain, only installing new finishes. Install new logo & led strips Signage is shown for information only. Signage is not included in building department review. signage permits and approvals shall be obtained separately by signage vendor.
Suite 1046
EPC - EXPEDITED - Suite 1046, Interior work includes new finishes, fixtures, furniture, millwork, and lighting. Installation of new equipment includes HVAC, electrical, plumbing, sprinkler system, and fire alarm devices.
EPC Submittal - Remodel of Commercial Building - Perform work to bring property up to standard for ADA code in accordance with agreement between Arden Fair Mall and Building Department. Including striping, signage, and misc. concrete/asphalt work where necessary to meet code.
AT&T Sign
Install 1 attaching illuminated, 1 attached non-illuminated sign.
Replace Fire Alarm System
Replace Fire Alarm System (smoke detector/sensor that is compatible with the FACP).
Suite 2042
EPC - New VAV Unit for project under construction. Replace like fro like. Revision to FPP-1804416
Suite 2042
New VAV Unit for project under construction. Replace like fro like. Revision to FPP-1804416
Suite 1312
Suite 1312, Interior renovation of existing demised retail tenant space. Back of House to remain unchanged. Electrical panel and transformer to remain. No change in occupancy or extent of existing demising walls. Sales floor: new finishes (marble tile: floor; paint: wall & ceiling); installation of new fixtures; existing mechanical units & ductwork to remain, be re-used; new sales sink in new location; remove recessed lights; new tracking lighting and power. Storefront to remain, only installing new finishes. Install new logo & led strips Signage is shown for information only. Signage is not included in building department review. signage permits and approvals shall be obtained separately by signage vendor.
Suite 1046
EPC Submittal - Remodel of Commercial Building - Tenant improvement for new retail Diamond store, Helzberg Diamonds
Suite 1046
Demo permit for new Helzberg Diamonds retail store
LuLuLemon Sign permit - Arden Fair Mall
Install (1) LED Attached / Illuminated Wall Sign
Suite 2118
Remodel of Commercial Building - Interior Tenant Improvement for Cold Stone Creamery
Suite 1046***Reconfigure Walls
EXPEDITED - Suite 1046***reconfigure demising wall to accommodate new tenant under separate permit.
Food Court Restroom
EPC - EXPEDITED - Renovation of the second floor Food Court Restrooms including corridor leading to the restrooms. Consists of new plumbing fixtures / accessories, floor finishes, wall
Suite 2002
EXPEDITED - EPC - Suite 2002, Cinnabon, Replace static menu board w/digital menu boards, casework updated to cocobala, wall tile to all white, furniture update, painting, replace lighting, dining room finishes replaced, replace pos system, hot plate, counter tops, and hood. Add new mop sink and floor sink.
Starbucks #110
EXPEDITED - Suite #110 Install one dedicated outlet for new self service cooler at Starbucks
Suite 2042
EXPEDITED - EPC Submittal - Remodel of Commercial Building - 3,651 SF INTERIOR RETAIL TENANT IMPROVEMENT ON SECOND FLOOR IN EXISTING 2-STORY ENCLOSED MALL. NEW STOREFRONT, NEW LIGHTING, AND INTERIOR NON-LOAD BEARING PARTITIONS AND FINISHES. NEW MECHANICAL HVAC AND ELECTRICAL. NEW STAFF SINGLE TOILET ROOM. NEW BLOCKING FOR TENANT MILLWORK AND STORE FIXTURES
Suite 1148
EXPEDITED - EPC - Suite 1148, Remodel of Commercial Building - INTERIOR TENANT IMPROVEMENT BUILD OUT OF EXISTING SHELL. BUILD OUT INCLUDES FRONT KITCHEN LINE, BACK OF HOUSE KITCHEN, AND DINING ROOM / BAR. EXTERIOR TENANT IMPROVEMENT, CONSIST OF UPDATING FINISHES: PAINT, WOOD SIDING , NEW LIGHT FIXTURES ON EXISTING J-BOXES, NO STRUCTUAL CHANGES TO THE EXTERIOR. SEE LIST OF DEFERRED SUBMITTALS FOR REFERENCE. Deferred Items are the Fire Sprinklers and the Fire Alarm
Emergency Conduit Repair
Repair secondary conduit feed.
Suite 2044 / 2042
EXPEDITED - Suite 2044 / 2042, Demolish interior finishes in space 2044, 2042 and existing storage rooms located behind spaces. Verify existing utilities and safe off future use for Tenant Improvement under separate permit.
Morphe Sign
Install LED channel letters
DEMO for TI ( STE 1186)
EXPEDITED - (Suite 1186) Demolition of select improvements; Extend 2" Gas main into suite; Complete STUBBED IN - Electrical - Plumbing ..
DEMO for TI ( STE 1186)
EXPEDITED - (Suite 1186) Demolition of select improvements; Extend 2" Gas main into suite; Complete STUBBED IN - Electrical - Plumbing ..
DEMO for TI ( STE 1186)
EXPEDITED - (Suite 1186) Demolition of select improvements; Extend 2" Gas main into suite; Complete STUBBED IN - Electrical - Plumbing ..
REVISION TO FPP-1707428 Mech Duct layout per CN and attached Narratives
REVISION TO FPP-1707428 Mech Duct layout per CN and attached Narratives for LS; E, P&M and Fire
Sephora, suite 1084
EXPEDITED - Interior alterations for Sephora, suite 1084: relocate and installation of sales area and store fixtures.
Macerich Tile and Electrical Box Replacement
EXPEDITED - Demo existing tile in center court to replace electrical boxes and replace in slightly different location
MAC Sign Permit - Interior Mall Sign Suite 1080
Install two attached illuminated signs. "MAC" Space 1080. Interior Mall Sign, Planning Review is not required.
Gen Korean BBQ Interior Demo
EXPEDITED - Interior demo of space # 1148 . No exterior or remodel work authorized .
Suite 1320
Updated existing equipment information & ductwork reconfiguration, Revision to FPP-1803520. Suite 1320, Retail Cosmetics Store, Interior renovation of a re-demised space
Tesla
EPC - Remodel of Commercial Building - Tesla to install (19) electrical vehicle charging stations and associated equipment within the Parking Lot/Garage at the Arden Fair Mall.
Suite 1080
EXPEDITED - Suite 1080, tenant improvement consisting of new partitions finish ceiling & flooring, new retail fixtures, inerior finishes lighting & misc millwork
EPC - Install one dedicated outlet for new self service cooler at Starbucks
Suite 1340
EXPEDITED - Suite 1340, Remove and replace lighting fixtures and finishes for Pandora.
Suite 1320
EPC - EXPEDITED - Suite 1320, Retail Cosmetics Store, Interior renovation of a re-demised space
Racking Suite 1286
EXPEDITED - Installation of back of house shelving/racking for existing tenant space. G-Star Raw
Suite 1148
Suite 1148, Remodel of Commercial Building - INTERIOR TENANT IMPROVEMENT BUILD OUT OF EXISTING SHELL. BUILD OUT INCLUDES FRONT KITCHEN LINE, BACK OF HOUSE KITCHEN, AND DINING ROOM / BAR. EXTERIOR TENANT IMPROVEMENT, CONSIST OF UPDATING FINISHES: PAINT, WOOD SIDING , NEW LIGHT FIXTURES ON EXISTING J-BOXES, NO STRUCTUAL CHANGES TO THE EXTERIOR. SEE LIST OF DEFERRED SUBMITTALS FOR REFERENCE.
PANDORA SIGN STE 1340
STE 1340 FABRICATED AND INSTALL (1) ILLUMINATED FLAT BUSINESS SIGN PANDORA
Suite 2116
EXPEDITED - EPC - Suite 2116 - Project includes the interior demolition and renovation of an existing 2,546 sq. ft. Zumiez retail space in the Arden Fair Mall. Project includes new finishes, casework, storefront, lighting, and modifications to the existing mechanical and electrical systems
Suite 2010
EXPEDITED - Suite 2010, Remodel of existing space for new ice cream and fruit business
Suite 2042
EPC Submittal - Remodel of Commercial Building - 3,651 SF INTERIOR RETAIL TENANT IMPROVEMENT ON SECOND FLOOR IN EXISTING 2-STORY ENCLOSED MALL. NEW STOREFRONT, NEW LIGHTING, AND INTERIOR NON-LOAD BEARING PARTITIONS AND FINISHES. NEW MECHANICAL HVAC AND ELECTRICAL. NEW STAFF SINGLE TOILET ROOM. NEW BLOCKING FOR TENANT MILLWORK AND STORE FIXTURES
RECONFIG - SUITES 1320 & 1322
EXPEDITED - OTC - Reconfigure existing tenant space for future suites. This permit is for the initial landlord work only.
Zummies
EXPEDITED - Suite 2116 interior demolition per approved plans
Tesla
EPC Submittal - Remodel of Commercial Building - Tesla to install (19) electrical vehicle charging stations and associated equipment within the Parking Lot/Garage at the Arden Fair Mall.
Zummies
Suite 2116 install one set of illuminated channel letters "Zummies"
Suite 2116
Suite 2116 - Project includes the interior demolition and renovation of an existing 2,546 sq. ft. Zumiez retail space in the Arden Fair Mall. Project includes new finishes, casework, storefront, lighting, and modifications to the existing mechanical and electrical systems
Suite 1286
EXPEDITED 5,5,5- 2009 sq ft interior remodel to include, plumbing, mechanical, and electrical. reconfiguring interior layout, updating store front
Verizon
remove existing Verizon sign and install a new sign to read: Verizon
Claire's
Install attached illuminated sign. "Claire's"
REVISION Arden Mall
REVISION to COM-1705620 clarification of service corridor wall construction
STE 1084 REMODEL
EXPEDITED - SUITE 1084 REMODEL TO INCLUDE FLOORING REPAIR/REPLACE, FIXTURE RELOCATION, MINOR ELECTRICAL.
Parking Lot Lighting Retrofit
EXPEDITED - Retrofit exterior parking lot lighting to LED one for one replacement.
MAC Sign Permit - Interior Mall Sign Suite 1080
Install two attached illuminated signs. "MAC" Space 1080. Interior Mall Sign, Planning Review is not required. See new permit pulled to final SIG-1808119
ARDEN FAIR MALL JAMBA JUICE SIGN
Install (1) illuminated wall sign. This is an interior Mall Tenant Sign, no planning review required.
Suite 1098
EXPEDITED - Suite 1098, New walls, ceiling, floor finishes, millwork, seating and mechanical, electrical, and plumbing
Arden Mall
EXPEDITED 15,10,10 - Removal of escalators in Court #3, modifying all impacted systems such as Fire Alarm, Fire sprinklers, re-configuring lease space on the lower level. Demolition of (e) escalators and installation of new and wider escalators in same general area near Macy's court. Re-configuration of lease area and impacted systems ( FA, Fire sprinkler, MEP) Installation of skylight, new floor / Wall and ceiling finishes, including lighting. (scope of work reduced removing skylight and relocating escalator CRF 6-22-2017) (revision COM-1718515 clarification of service corridor CRF 10-6-2017)
demolition of suite #1098
EXPEDITED - demolition only of interior finishes for future jamba juice suite #1098, 1226 sq ft of space
revisoin Suite 2026
revision to FPP-1702970 to modify the electrical from 2 transformers to 1 transformer
ANSUL
Hookup hood and duct ansul system
Suite 2178
EXPEDITED - Suite 2178, Installation of floor and wall sales fixtures. New finishes & wall paper. New plug mold receptacles
Charlys Philly Steaks Sign Permit-Arden Fair Mall Approved
Charlys Philly Steaks Sign Permit-Arden Fair Mall Approved: Installation of LED Channel letters.
AEROPOSTALE SIGN PERMIT-ARDEN FAIR MALL INTERIOR
AEROPOSTALE SIGN PERMIT: Install (1) attached / illuminated wall sign for "Aeropostale". Pre-Approved Arden Fair mall Interior Sign
sprinkler plan revisions
EXPEDITED - revision to FPP-1613535 sprinkler plans updated
Bath & Body Works
Install new bath & body works/white barn signs.
Suite 2026
EXPEDITED - Suite 2026, Charley's Philly Steak, Non structural interior tenant remodel to an existing mall food court tenant space. 618 sq. ft.( revision FPP-1710240 to modify electric CRF 6-14-2017)
Demo Interior Ste #2026
EXPEDITED - Non-structural demo of an existing mall food court tenant space. Space 2026, 618 SF, in preparation for new tenant remodel.
GODIVA SIGN PERMIT -Arden Fair Mall Approved
GODIVA SIGN PERMIT-Arden Fair Mall Approved-Installation of (1) Illuminated face w/ push through letters on recessed cabinet & Installation of (1) double faced blade sign.
SUITE 1070, REMODEL W/ PLANS
EXPEDITED - Suite 1070, FPP REMODEL W/ PLANS TO INCLUDE, ELECTRICAL, LIFE SAFETY, PLUMBING IN FIRE SPRINKLERED BUILDING. (Revision FPP-1705761 updated sprinkler plans CRF 4-12-2017)
remodel
EXPEDITED - rework existing janitorial break room and storage rooms to make 3 future storage rooms,
Suite 2026
EXPEDITED - Suite 2026. Interior remodel to reconfigure existing neutral piers at suite 2026 for new tile finishes and cosmetic design.
SPACE 2134 REMODEL W/ PLANS
EXPEDITED - Revision to FPP-1615717, Revision to the Arch., MEP, and Struct. sheets and Fire sheets, See matrix. SPACE 2134 REMODEL FOR FIRE SPRINKLERED BUILDING TO INCLUDE DOORS, PARTITIONS, CEILINGS, LIGHTING, FIXTURES, MEP WORK.
SPACE 2134 REMODEL W/ PLANS
Revision to FPP-1615717, Revision to the Arch., MEP, and Struct. sheets and Fire sheets, See matrix. SPACE 2134 REMODEL FOR FIRE SPRINKLERED BUILDING TO INCLUDE DOORS, PARTITIONS, CEILINGS, LIGHTING, FIXTURES, MEP WORK.
Suite 1110
EXPEDITED - EPC - Suite 1110, Starbucks, Minor tenant improvements which include, installation of new back bar tile, installation of new food case, new metal wainscot, and to reinstall grab bars and small fixtures in employee rest room to be accessible
SPACE 2134 REMODEL W/ PLANS
EXPEDITED - SPACE 2134 REMODEL FOR FIRE SPRINKLERED BUILDING TO INCLUDE DOORS, PARTITIONS, CEILINGS, LIGHTING, FIXTURES, MEP WORK.
Revision
EXPEDITED - Revision to FPP-1614313 revised store front.
tenant space remodel
EXPEDITED - modify existing landlord bulkhead and neutral piers to match existing, cosmetic. relocate existing electrical and lighting per field conditions
Suite 2002
EPC Submittal - Remodel of Commercial Building - Replace static menu board w/digital menu boards, casework updated to cocobala, wall tile to all white, furniture update, painting, replace lighting, dining room finishes replaced, replace pos system, hot plate, counter tops, and hood. Add new mop sink and floor sink.
Revision
EXPEDITED - Revision to FPP-1609525
Revision
EXPEDITED - Revision to FPP-1609525. Revised mechanical sheet details.
METRO PCS / SUITE 2006
ARDEN FAIR MALL INTERIOR SIGN FOR SUITE 2006 TO INSTALL 1 ATTACHED/ILLUMINATED SIGN FOR METRO PCS
ANSUL
Install new ANSUL system in existing kitchen hood.
Auntie Anne's Space 2008
Revised lighting, Revision to COM-1611171, Remodel of Commercial Building - Minor renovation to an existing Auntie Anne's Store. New finishes and signage.
Panda Express SPACE 2022 / REMODEL
EXPEDITED - SPACE 2022 / REMODEL EXISTING RESTAURANT WITHIN FOOD COURT AT ARDEN FAIR TO INCLUDE MODIFY SERVICE COUNTER FINISHES/EQUIPMENT, REPLACE MENU BOARD/LIGHT FIXTURES, NEW WALL/FLOOR FINISH. KITCHEN AREA-INSTALL NEW EQUIPMENT SEE FPP-1619296 FOR REVISED MECHANICAL SHEETS. SEE FPP-1619407 FOR REVISED 3COMPARTMENT SINK DRAINAGE
Auntie Anne's Space 2008
EPC - Remodel of Commercial Building - Minor renovation to an existing Auntie Anne's Store. New finishes and signage.
OTC REMODEL
EXPEDITED - DEMO AS NOTED EXISTING FRONT 3' OF NEUTRAL TWO NEUTRAL PIERS, MODIFY NEUTRAL PIERS WITH NEW PROFILE AND TILE FINISHES.
Victoria's Secret
EXPEDITED - Suite 2140 Interior remodel to relocate restroom. New partitions with associated electrical, plumbing/mechanical and fire sprinklers. Existing racking will be relocated to accommodate the new restroom location.
OTC REMODEL SUTIE 2050
EXPEDITED - OTC REMODEL SUTIE 2050, PARTIAL DEMO, REPLACE EXISTING STORE FRONT, FILL IN NON-BEARING INTERIOR WALL.
PANDA EXPRESS - SIGNS
INSTALLATION OF (2) ATTACHED ILLUMINATED SIGNS
SPACE 1338 / BROOKSTONE SIGN
SPACE 1338 INSTALL 1 ATTACHED/ILLUMINATED SIGN ON MALL INTERIOR FOR BROOKSTONE
REMODEL EPC
EPC Submittal - Remodel of Commercial Building - Minor renovation to an existing Auntie Anne's Store
Brookstone Suite 1338
EXPEDITED - Brookstone Suite 1338. Interior remodel to include demolition of existing partitions new partitions with associated plumbing/mechanical, electrical, and fire sprinklers. New store front.
1689 Arden Way, Facade Remodel & remodel ste #1038
EXPEDITED 10, 5, 5 - remodel an existing mall exterior wall and ste #1038, remove and install partition walls, cabinets, lighting, and ceilings with new finishes at entry openings and display element
Lolli and Pops
Install (1) set of letter sign "Lolli ad Pops", attached and illuminated
STE 2110/BOX LUNCH SIGN PERMIT / ARDEN FAIR MALL
SUITE 2110. Install one set Channel Letters & one DIF Blade Sign FOR BOX LUNCH
LUNCH BOX
EXPEDITED - Interior remodel for Space 2110. Demolition of existing partitions, new partitions with associated plumbing/mechanical, electrical and fire sprinklers.
LOLLIPOPS
EXPEDITED - REMODEL STE 1136 INTO A CANDY STORE: DOORS, PARTITIONS, FLOORING, CEILING, FIXTURES, STOREFRONT, ELEC, & MECHANICAL.
EXPRESS SIGN PERMIT / ARDEN FAIR
Install 2 sets exterior & 1 blade sign and one interior sign.
interior demolition
EXPEDITED - interior demo of suite #2110. fire sprinklers are to remain untouched and active.
Interior Remodel
EXPEDITED - Suite 1020 (Sleep Number) interior remodel of existing space remove and replace 1 wall fixture drywall patch and paint.