Sacramento 95815 · Point West · APN 277-0273-003-0000 · City of Sacramento
Zoned OB-PUD in City of Sacramento with likely ministerial ADU eligibility and zero mapped flood, fire, or fault hazard overlaps; benchmark value $541,000 ($476,000–$606,000).
Zone OB-PUD allows residential use qualifying for ministerial ADU review under state law.
Source: City of Sacramento zoning · CA Gov. Code 66314
Public building records show issued construction/renovation work on this parcel (53 total permits, latest Jul 28, 2026).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (parcel APN)
all of the lot of the parcel intersects Zone X: reduced flood risk due to levee. Outside mandatory federal SFHA insurance rules, but check local drainage and finished-floor requirements.
Source: FEMA National Flood Hazard Layer (parcel polygon)
Automated synthesis of indexed municipal, county, state, and federal public records — informational context only, not a formal appraisal, survey, or legal/tax determination.
$541,000
Benchmark range: $476,000 – $606,000
Kaiser Sacramento Point West MOB - PV Revisions: In "Approved" for 6.7 yr (since Feb 13, 2020), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150).
Source: City of Sacramento CDD, Issued Building Permits (Current Year) (review-time benchmark)
Closest lead: Mixed-Use Student Housing/Hotel (0.15 mi SE, fee estimate). Inspect timeline history before assuming near-term completion.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · HCD APR (½-mile radius)
Sale triggers reassessment to 1.00% base + ~0.14% voter debt (~$551/mo). Confirm exact Mello-Roos / CFD special assessments on the county tax bill.
Source: CA Const. Art. XIIIA (Prop 13) · County Tax Collector
161 permits within ½ mile since November 2024
The map shows new construction, ADUs, demolitions, additions, and renovations. Routine systems work (roofs, HVAC, water heaters) is counted but not mapped. Unit counts are as stated on permits.
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: permits located by parcel, ½ mile radius · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026
Public-records benchmark estimate combining Zillow Home Value Index (Data provided by Zillow), Census ACS 5-year estimates, parcel land-use/lot characteristics, and issued building permits. Not an official appraisal.
No ADU or new-home permits recorded within ¼ mile in this window.
Permit counts, by the date issued (or applied, if not yet issued). Lot splits are planning cases, which we don't have.
We read public zoning and hazard maps against state law (ADUs: Gov. Code 66314; SB 9: Gov. Code 65852.21 and 66411.7). Local rules, title, tenancy history and site conditions can change the answer. Check with City of Sacramento's planning department before relying on it.
Sources: City of Sacramento CDD, Zoning (retrieved Nov 11, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the State Responsibility Area (effective 2024-04-01) (retrieved Nov 9, 2026) · CAL FIRE Office of the State Fire Marshal, Fire Hazard Severity Zones in the Local Responsibility Area (map dated 2025-03-24) (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — flood hazard zones (retrieved Nov 9, 2026) · FEMA, National Flood Hazard Layer — FIRM panels (retrieved Nov 9, 2026) · California Geological Survey, Alquist-Priolo Earthquake Fault Zones (retrieved Nov 9, 2026) · Zoning classes: our classification of OB as mixed use, checked against the zone description on Oct 24, 2026
Chronological history of building permit applications and issuances, snapshot-dated status changes, State housing entitlements, surrounding development within ½ mile, and area home-value trends.
In "Approved" for 6.7 yr (since Feb 13, 2020), with no new permit record in 6.7 yr.
In "Fee estimate" for 9.9 yr (since Dec 9, 2016), with no new permit record in 8.7 yr. · $2,000,000 declared valuation
In "Fee estimate" for 7.6 yr (since Mar 21, 2019), with no new permit record in 7.6 yr. · 33 units · $10,172,244 declared valuation
In "Entitled" for 4.6 yr (since Apr 25, 2022), with no new permit record in 3.9 yr. · 25 units · $7,125,000 declared valuation
In "Fee estimate" for 4.3 yr (since Aug 1, 2022), with no new permit record in 3.5 yr. · $1,400,000 declared valuation
Nearby electrical / panel (1535 River Park Dr): First appeared in published agency feed
Record COM-2623856 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (1689 Arden Way 2012): Status changed from Issued to Finaled
Record SIG-2609070 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1545 River Park Dr 500): Status changed from Plan Check Target to Complete
Record FPP-2621382 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1601 Arden Way): First appeared in published agency feed
Record COM-2621862 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1601 Arden Way): Status changed from Plan Check Target to Plan Check Wait
Record COM-2621057 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1601 Arden Way): Description text was updated
Record COM-2621057 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1601 Arden Way): First appeared in published agency feed
Record COM-2622389 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby addition (adds square footage) (1625 Bowling Green Dr): First appeared in published agency feed
Record RES-2623275 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby solar / battery storage (1701 Arden Way): Status changed from Issued to Expired Permit
Record COM-2519828 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1601 Arden Way): Status changed from Verify to Complete
Record COM-2619316 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby sign (1689 Arden Way 1034): First appeared in published agency feed
Record SIG-2621787 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby plan revision / deferred submittal (1735 Arden Way 230): First appeared in published agency feed
Record COM-2623268 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby remodel / interior alteration (1689 Arden Way): First appeared in published agency feed
Record COM-2622687 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby fire alarm / sprinkler (1735 Arden Way 230): Description text was updated
Record COM-2618224 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Nearby commercial tenant improvement (1689 Arden Way 2076): Status changed from Verify Wait to Process Wait
Record FPP-2616860 · Detected between snapshots
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Snapshot diff within ½ mile
Cross-referenced intelligence from our historical development graph—connecting parcels, permits, entity-resolved builders, empirical review-time distributions, and neighborhood renovation trends.
Explore full City of Sacramento development graph →In "Approved" for 6.7 yr (since Feb 13, 2020), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150).
In "Fee estimate" for 7.6 yr (since Mar 21, 2019), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (33 housing units, $10,172,244 declared valuation across 1 permit).
In "Entitled" for 4.6 yr (since Apr 25, 2022), exceeding the 210d median and 627d 90th percentile for new multifamily / condos / mixed-use permits in City of Sacramento (n=199). High-impact scale (25 housing units, $7,125,000 declared valuation across 15 permits).
In "Fee estimate" for 4.3 yr (since Aug 1, 2022), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($1,400,000 declared valuation across 3 permits).
In "Fee estimate" for 9.9 yr (since Dec 9, 2016), exceeding the 241d median and 498d 90th percentile for new commercial / non-residential building permits in City of Sacramento (n=150). High-impact scale ($2,000,000 declared valuation across 2 permits).
Issued after 2 mo — slower than 90% of remodel / interior alteration permits in City of Sacramento (median 4d, 90th pct 55d, n=8,151).
| Builder / contractor | Primary specialty | Here / ½ mi | ½ mi valuation | Citywide 24m trend |
|---|---|---|---|---|
| Kaiser Foundation Health Plan Merged: Kaiser Foundation Health Plan Inc. · KAISER FOUNDATION HEALTH PLAN INC | Plan revision / deferred submittal | 35 on parcel36 in ½ mi | $7,019,723 | 17 vs 12 prior+42% |
| Ameresco | New commercial / non-residential building | 3 on parcel3 in ½ mi | $3,929,980 | 0 vs 0 prior |
| Mastec Network Solutions | Remodel / interior alteration |
| Permit category | Sample (n) | 25th pct | Median (50th) | 75th pct | 90th pct | Recent 24m median |
|---|---|---|---|---|---|---|
| New single-family home | 3,657 | 28d | 45d | 85d | 184d | 41d(vs 51d prior) |
| New duplex / half-plex | 115 | 82d | 184d | 416d | 575d | 144d(vs 361d prior) |
| New multifamily / condos / mixed-use | 199 | 125d | 210d | 365d | 627d | 199d(vs 289d prior) |
| New commercial / non-residential building |
HUD Small Area Fair Market Rent · ZIP 95815
HUD FY 2026 · 40th-percentile gross rentCensus ACS 5-year median gross rent (all bedroom counts combined):
Area home-value benchmarks (not an appraisal)
ZIP & neighborhood mediansUnder California Proposition 13, the seller's historical assessed value does not carry over to a buyer. On sale, the parcel is reassessed at the purchase price: 1.00% base rate ($5,400/yr) + local voter-approved bond debt ($756/yr) + fixed direct levies/Mello-Roos ($450/yr).
Insurance & hazard context:
Model adding a backyard ADU or garage conversion under California's Prop 13 blended new-construction assessment (existing house & land tax base stays intact; only ADU build cost is assessed) and SB 13 impact-fee rules.
−$24,170/yr
Cash needed: $118,800
NOI: $8,597/yr
P&I: $2,731/mo
For $0/mo net cash flow
At $1,850/mo gross rent
| Scenario | Assumptions | Year 1 Rent | Year 1 Cash Flow | Cash-on-Cash | Break-Even Rent | Year 5 Cash Flow |
|---|---|---|---|---|---|---|
| Conservative | −8% starting rent, +3% vacancy, +3% combined maintenance/CapEx, 1.5%/yr rent growth | $1,702/mo | −$2,227/mo | -22.5% | $4,810/mo | −$2,211/mo |
| Base (your inputs) | Your entered assumptions, 3.0%/yr rent growth | $1,850/mo | −$2,014/mo | -20.3% | $4,452/mo | −$1,894/mo |
| Optimistic (cap-limited) | +6% starting rent, 3% vacancy, 4.5%/yr rent growth (capped by local ordinance ceiling of 8.6%/yr) | $1,961/mo | −$1,892/mo | -19.1% | $4,349/mo | −$1,652/mo |
Rental regulatory context (informational only — not legal advice):
California AB 1482 (Tenant Protection Act, Civ. Code § 1947.12) caps annual rent increases at 5% + local CPI (max 10%) on covered properties. In City of Sacramento: Sacramento Tenant Protection Program (City Code Ch. 5.156) — 5% + CPI (8.6% cap effective July 1, 2026) for covered pre-1995 multifamily units. Official program rules ↗
ApprovedFeb 13, 2020 – Feb 13, 2020
We group related permits and State housing reports into projects. That grouping is our inference, not an official record.
Medical Office Remodel
EPC - Replacement of an existing mammography diagnostic imaging equipment in Room C1332 of the Kaiser Point West Medical Office Building. This includes new casework and general room finish refresh. Work also includes Structural, Mechanical, Plumbing, and Electrical work.
REVISION TO COM-2413057
EPC - REVISION TO COM-2413057 Design clarifications of restroom plumbing fixtures to be replaced in kind and TV wall mount to be used. Added structural patching slab detail to address field conditions. Added supplemental civil exterior site work for path of travel barrier removal via new civil sheets.
REVISION TO COM-2415272
EPC - REVISION TO COM-2415272. Relocating existing safe from room C1235 to room B1211 on the first floor. 2. Patch and repair wall and floor in room C1235. 3. Patch and paint room C1235 and B1211. 4. Removal of existing security cameras in room C1235. 5. Add security cameras and security key access to room B1211 per Kaiser standards. 6. Demo and infill existing door at room B2165 on the second floor. 7. Add new double door with required hardware group at B2165. 8. Remove existing track lights at corridor on first and second floor. 9. Adding a 6th station at B1162. 10. Soffit modification at B1162. 11. Added 3form system and furniture for new blood pressure stations on the first floor. 12. Adding power and data for blood pressure stations. 13. Adjusting digital directory locations to have only (1) directory per Kaiser standards. 14. Demo door at A1208 and replace with new rated door. 15. Move fire rating to adjacent wall at central registration 1A. 16. Graphics updated per Kaiser 4.1 standards. 17. Relocating fire smoke damper in room C1223 to C1221. 18. Adding a return air grille to room C1223. 19. Demo existing casework in room C1223. 20. Patch and paint room C1223. 21. Adding new flooring, base, and furniture to room C1223. 22. Changing new door at C1221 to a framed door.
REV TO COM-2414693
EPC - REV TO COM-2414693 - User driven request to incorporate an electronic queuing wayfinding system with illuminated signage. Station numbers to change from fixed signage to be powered and illuminated signs mounted to the underside of the existing soffit above.
kaiser remodel
EPC - THE SCOPE OF WORK FOR THIS PROJECT ENTAILS THE REFRESH OF INTERIOR FINISHES FOR THE EXISTING PHARMACY WAITING AND POINT OF SALE (POS) CASEWORK ON LEVEL 1 OF THE SACRAMENTO POINT WEST MEDICAL OFFICE BUILDING. A NEW OFFICE WILL BE BUILT IN THE WAITING ROOM, RETAIL SHELVING WILL BE REPLACED, LIGHTING FIXTURES REPLACED, ACCENT LIGHTING REMOVED, AND THE POS CASEWORK WILL BE REPLACED WITH ERGONOMIC STATIONS. PROJECT INCLUDES NEW FINISHES INCLUDING FLOORING, BASE, AND PAINT. SEE REVISION COM-2424914 - User driven request to incorporate an electronic queueing wayfinding system with illuminated signage. Station numbers to change from fixed signage to be powered and illuminated signs mounted to the underside of the existing soffit above.
KAISER REMODEL
EPC - Remodel of 12,580 SF. Of the existing spaces on all 3 Floors of the existing MOB. The scope includes the following: converting two reception surround, adjustable height workstation, ne registration station to area 1B, replacing existing flooring and wall base with new. New paint and wall graphics. New casework surrounds and workstations, New furniture, & New lighting. See revision COM-242520 revisions to areas of work from issued permit.
DECOMMISSION OF TELECOMMUNICATION FACILITY
EPC - DECOMMISSION TO AN (E) UNMANNED TELECOMMUNICATION FACILITY CONSISTING OF: 1. REMOVE (EJ SPRINT EQUIPMENT CABINETS 2. REMOVE (EJ SPRINT PFC CABINET, TELCO BOX, CIENA & (E) H-FRAMES 3. REMOVE (E) SPRINT GPS ANTENNA 4. REMOVE ALL (E) SPRINT CABLES, SPRINT CABLE TRAYS & (E) SPRINT CONDUITS 5. REMOVE (E) SPRINT STEEL PLATFORM EQUIPMENT AREA 6. (E) FRP ENCLOSURE TO REMAIN/ OR TO BE REPLACE TO MATCH (E) BUILDING DESIGN 7. ALL (E) SPRINT RELATED EQUIPMENT TO BE REMOVED
Laboratory Remodel
EPC - THE SCOPE OF WORK FOR THIS PROJECT ENTAILS THE REFRESH OF INTERIOR FINISHES FOR THE EXISTING BLOOD DRAW LABORATORY DEPARTMENT ON LEVEL 1 OF THE SACRAMENTO POINT WEST MEDICAL OFFICE BUILDING. EXISTING RECEPTION WORKSTATIONS WILL BE REMOVED AND REPLACED WITH ADDITIONAL BLOOD DRAW STATIONS; EXISTING BLOOD DRAW STATIONS AND CASEWORK WILL BE UPDATED. A NEW PRIVACY WALL WILL BE BUILT TO SEPARATE THE BLOOD DRAW AREA FROM THE WAITING ROOM. BACK OF HOUSE LAB WORKSTATIONS WILL BE REPLACED TO CORRECT REACH ISSUES AND CASEWORK SHALL BE ADDED TO OPTIMIZE STORAGE. LIGHTING FIXTURES THROUGHOUT ARE TO BE REPLACED IN KIND WITH LED AND ANTI-FATIGUE FLOORING TO BE INSTALLED AT STAFF WORKZONES. PROJECT INCLUDES NEW FINISHES INCLUDING CEILING TILES, FLOORING, BASE, AND PAINT *see revision COM-2427157 Design clarifications of restroom plumbing fixtures to be replaced in kind and TV wall mount to be used. Added structural patching slab detail to address field conditions. Added supplemental civil exterior site work for path of travel barrier removal via new civil sheets.
SPRINT DECOMMISION
EPC - remove Decommissioned redundant and unnecessary components of Wireless Sites. (Removal of select obsolete Antennas, Equipment, Cabinets and associated mounting hardware and cables. There will be NO Removal of Monopoles/Towers or any structural components. Structure will remain in use/no change in function. No Modification, or alteration to the structure.
Commercial Remodel
EPC - Replacement of existing radiology equipment as well as replacing related interior finishes, casework, and one plumbing fixture in imaging room C1344 of the Kaiser Point West Medical Office Building.
(1st Floor -C1333/Room3) Mammography Unit
EPC - (1st Floor -C1333/Room3) Mammography Unit: THE SCOPE OF PROJECT IS THE REPLACEMENT IN KIND OF THE EXISTING MAMMOGRAPHY unit;THE REPLACEMENT SHALL BE A NEW HOLOGIC, SELENIA: DIMENSIONS DIGITAL MAMMOGRAPHY UNIT, THE PROJECT ALSO INCLUDES REPLACEMENT OF CASEWORK AND A GENERAL REFRESH OF ROOM FINISHES. WORK ALSO INCLUDES STRUCTURAL, MECHANICAL, AND ELECTRICAL. OWNER HAS VERIFIED EXISTING RADIATION SHIELDING IS ADEQUATE FOR NEW EQUIPMENT. NO NEW EXTERIOR WORK OR ROOF EQUIPMENT.
Kaiser Reomodel
EPC - THE SCOPE OF WORK FOR THIS PROJECT INCLUDES THE INSTALLATION OF A NEW FURNITURE PARTITION AT WORK AREA A1210 FOR PRIVACY, RELOCATING AN ELECTRICAL OUTLET AND ADDING A DATA OUTLET FOR NEW WORKSTATIONS.
REVISION TO COM-2014732
EPC - REVISION TO COM-2014732. THE REVISION INCLUDED: RELOCATE EXISTING HANDWASH SINK IN ROOM C1338.
Interior Remodel
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Geography: parcel (APN) · Source updated Nov 1, 2026 · Retrieved Nov 3, 2026 · Applied and issued dates come from the city's Applied and Issued permit datasets. The city publishes current status without a date, so status changes are dated by the window between our snapshots.
No housing activity reported to the State for this parcel (2018–2025 reports).
Source: California HCD, Housing Element Annual Progress Report — Table A2 · Geography: project (parcel) · Retrieved Nov 9, 2026 · From City of Sacramento's Housing Element Annual Progress Reports. A project can appear in several report years as it moves from entitlement to permit to completion.
Source: City of Sacramento CDD, Zoning · Geography: zoning district polygon at parcel point · Source updated Nov 11, 2026 · Retrieved Nov 11, 2026
15.73 acres
Assessor's classification for assessment purposes. This is not zoning.
1650 RESPONSE RD
Source: Sacramento County GIS, Parcels · Geography: parcel · Source updated Nov 8, 2026 · Retrieved Nov 8, 2026
Assessed values and limited building characteristics (Sacramento County Assessor)
Current roll value. This is assessed value, not market value.
Search by parcel number 277-0273-003-0000. Shows direct levies and special assessments.
Search the city's permit system by address or record number
The official flood hazard map for this location. Our reading of it is under What could be built here.
This site does not show owner names.
| $94,000 |
| 1 vs 34 prior−97% |
| Airco Mechanical | General repair | 2 on parcel2 in ½ mi | $448,993 | 1 vs 3 prior |
| Contra Costa Electric | Remodel / interior alteration | 1 on parcel1 in ½ mi | $943,780 | 0 vs 0 prior |
| Pan Sign | Sign | 1 on parcel1 in ½ mi | $22,170 | 0 vs 0 prior |
| Insite Telecom | Remodel / interior alteration | 1 on parcel1 in ½ mi | $20,000 | 0 vs 4 prior |
| Whittington Electric | Remodel / interior alteration | 1 on parcel1 in ½ mi | $6,752 | 0 vs 1 prior |
| Kf Development And Construction Recent nearby: 1413 Exposition Blvd 112 (Oct 1, 2025) | Commercial tenant improvement | 128 in ½ mi | $8,778,000 | 15 vs 18 prior−17% |
| Icon General Contractors Merged: ICON GENERAL CONTRACTORS INC · ICON GENERAL CONTRACTORS LLC Recent nearby: 1610 Arden Way 121 (Sep 4, 2026) | Commercial tenant improvement | 48 in ½ mi | $4,848,235 | 39 vs 62 prior−37% |
| 150 |
| 155d |
| 241d |
| 334d |
| 498d |
| 229d(vs 293d prior) |
| Accessory dwelling unit (new or conversion) | 1,693 | 57d | 97d | 172d | 284d | 97d(vs 103d prior) |
| Addition (adds square footage) | 1,948 | 6d | 42d | 83d | 162d | 49d(vs 43d prior) |
| Remodel / interior alterationOn this parcel | 8,151 | 1d | 4d | 21d | 55d | 5d |
| Commercial tenant improvementOn this parcel | 2,366 | 30d | 63d | 119d | 201d | 61d(vs 64d prior) |
Source: City of Sacramento CDD, Issued Building Permits (Current Year) · Computed from issued permits with recorded application and issuance dates over the trailing 60 months. Categories with fewer than 20 permits are excluded.
EPC - THIS PROJECT IS LIMITED TO INTERIOR ALTERATIONS. THE SCOPE OF PROJECT IS THE REPLACEMENT IN KIND OF THE EXISTING MAMMOGRAPHY UNIT IN ROOM C1331 / ROOM 1 ON THE FIRST FLOOR OF THE POINT WEST MOB. THE PROJECT ALSO INCLUDES REPLACEMENT OF CASEWORK, HAND WASHING SINK, AND A GENERAL REFRESH OF ROOM FINISHES INCLUDING UPDATES TO MISCELLANEOUS ROOM SIGNS. WORK ALSO INCLUDES STRUCTURAL, MECHANICAL, AND ELECTRICAL. OWNER TO VERIFY EXISTING RADIATION SHIELDING IS ADEQUATE FOR NEW EQUIPMENT. NO SHIELDING UPGRADES ARE ASSUMED IN THESE DRAWINGS NO NEW EXTERIOR WORK OR ROOF EQUIPMENT.
KAISER - ROOM -C1338
EPC - THIS PROJECT IS LIMITED TO MINOR INTERIOR ALTERATIONS IN ROOM C1338 ON THE FIRST FLOOR. NO NEW EXTERIOR WORK OR ROOF EQUIPMENT. 1. REPLACING EXISTING BONE DENSITY IMAGING TABLE 2. REMOVING EXISTING HANDWASHING SINK (NO LONGER CLINICALLY REQUIRED) 3. REPLACING FLOORING AND SUSPENDED CEILING PANELS (T-BAR TO REMAIN). NEW PAINT. 4. MINOR ASSOCIATED PLUMBING AND ELECTRICAL WORK. SEE REVISION COM-2021374. THE REVISION INCLUDED: RELOCATE EXISTING HANDWASH SINK IN ROOM C1338.
CMU ENCLOSURE/CONNEX/DUMPSTER
EPC - Construct a new CMU enclosure with sliding gates and doors for the storage of (2) storage Connex and (1) dumpster for the use of the Facility Engineer and Contractor. Provide new electrical mini power station within the enclosure to provide power outlets and lighting. Demolition of portion of existing landscaping and removal of (3) trees are anticipated for the new enclosure.
Kaiser Sacramento Point West MOB - Revisions 2 Delta 7
EPC - Electrical PV revisions to COM-2002567 for COM-1902727 Kaiser Permanente Sacramento Point west MOB Medical Center
Kaiser Sacramento Point West MOB - PV Revisions
EPC - Electrical revisions per narrative for COM-1902727 (Install 91,890 sf, 1600.56 kW DC grid-tied solar photovoltaic system on an existing parking lot for Kaiser Permanente Sacramento Point west MOB Medical Center)
EPC Submittal - New Commercial Building - Carport canopies with solar.
KAISER PT WEST - REHAB TREATMENT REMODEL
EPC Submittal - Remodel of Commercial Building - INSTALLATION OF NEW THERAPY FITNESS EQUIPMENT AT EXISTING COVERED EXTERIOR PATIO A1300, THE RE-PURPOSEMENT OF EXISTING HYDROTHERAPY ROOM A1202 TO A GROUP TREATMENT/ CLASSROOM FUNCTION AS WELL AS IMPROVEMENTS TO EXISTING PRIVATE TREATMENT ROOMS A1314, A1316, A1337, A1339, A1365, & A1366.
PERMIT TO COMPLETE WORK FROM EXPIRED PERMIT COM-1818367
PERMIT TO COMPLETE WORK FROM EXPIRED PERMIT COM-1818367 Kaiser: Adding a new Ladder cage enclosure to existing ladder; Adding safety guards on upper roof; Adding two bridges over existing seismic separation parapet walls; Remediate a tripping hazard caused by an existing vent pipe with a roof walking path; All work is subject to field inspection.
EPC Submittal - Remodel of Commercial Building - THE SCOPE OF WORK FOR THIS PROJECT INCLUDES THE INSTALLATION OF NEW THERAPY FITNESS EQUIPMENT AT EXISTING COVERED EXTERIOR PATIO A1300, THE REPURPOSEMENT OF EXISTING HYDROTHERAPY ROOM A1202 TO A GROUP TREATMENT/ CLASSROOM FUNCTION AS WELL AS IMPROVEMENTS TO EXISTING PRIVATE TREATMENT ROOMS A1314, A1316, A1337, A1339, A1365, & A1366.
Add Receptacles & Data Outlets
EXPEDITED - Install (4) receptacles extending from existing circuit and (4) data outlets
Kaiser Sacramento Point West MOB - PV Installation
EPC - Install 91,890 sf, 1600.56 kW DC grid-tied solar photovoltaic system on an existing parking lot for Kaiser Permanente Sacramento Point west MOB Medical Center. (DR17-255) - PLNG-INSP
EPC Submittal - New Commercial Building - The project scope includes the installation of a grid-tied solar photovoltaic system. The installation consists of new carports, carport mounted arrays, string inverters, and related electrical metering and safety equipment. All equipment will be installed as required by applicable codes and the local utility company. During daylight hours, this photovoltaic system will provide electricity in parallel with the local utility service provider. The design includes 22 new carport solar structures to be installed in existing parking lots over existing parking spaces. No parking spaces will be lost as a result of this installation. Car overhang clearance will not be impeded by the new columns. No ADA parking or paths of travel will be affected by this installation. No additional noise or pollution from the site will be caused by this installation. This project has been approved by the City of Sacramento Planning Department: DR17-255.
POINT WEST KAISER MEDICAL OFFICE BUILDING LIGHTING EFFICIENCY UPGRADE
POINT WEST KAISER MEDICAL OFFICE BUILDING LIGHTING EFFICIENCY UPGRADE FOR ENTIRE. INTERIOR AND EXTERIOR AREAS.
revision
EPC Submittal - Deferred/Revision to Issued Permit COM-1815574 - Adding two more dressing rooms, changes to electrical, finishes
Radiology Imaging Room, C1345: Updated Fire Alarm plans
Updated Fire Alarm plans to existing imaging radiology room C1345 at Kaiser Point West Medical Office Building due to changes in area geometry.
Revision- to COM-1723433-Kaiser Point West Medical Office Building
Revision- to COM-1723433- fire never reviewed original permit.
EPC Submittal - Deferred/Revision to Issued Permit COM-1815574 - Adding two more dressing rooms.
KAISER RADIOLOGY REMODEL
EPC Submittal - REMODEL 215 SQ FT TO replace existing radiology equipment in imaging room C1345 of Kaiser Point West Medical Office Building. Renovations also include remodel of dressing rooms to provide for accessibility as well as minor cosmetic updates of the adjacent tech work area and affected corridor space with new flooring and wall paint; including consequential structural, mechanical, and electrical modifications. (revision COM-1823701 to include 2 additional dressing rooms, electrical and finishes CRF 12-13-2018)
Landscaping Upgrades
EPC Submittal - Addition of irrigation booster pump and landscape improvements in area of work.
Ladder enclosure/ Roof Bridges (2) / Vent Pipe Removal
EXPEDITED - Kaiser: Adding a new Ladder cage enclosure to existing ladder; Adding safety guards on upper roof; Adding two bridges over existing seismic separation parapet walls; Remediate a tripping hazard caused by an existing vent pipe with a roof walking path; All work is subject to field inspection.
EPC Submittal - Addition to Commercial Building - Addition of irrigation booster pump and landscape improvements in area of work.
Revision to change special inspection detail
Revision to COM-1723433 to change special inspection detail on roll down fire door replacement from welded connection to bolted connection on all doors.
EPC Submittal - Remodel of Commercial Building - Replacement of existing radiology equipment in imaging room C1345 of Kaiser Point West Medical Office Building. Renovations also include remodel of dressing rooms to provide for accessibility as well as minor cosmetic updates of the adjacent tech work area and affected corridor space with new flooring and wall paint; including consequential structural, mechanical, and electrical modifications.
Replacing two boilers on second floor of operations building
REVISION TO COM-1723719
**REVISION TO COM-1723713** ELECTRICAL CONDUITS WILL NOW BE REESSED.
Revision to COM-1713699 : Light Fixture & Printer Location Clarification
EXPEDITED - Revision to COM-1713699 : Light Fixture & Printer Location Clarification for their new circuit
KAISER POINT WEST - MAMMOGRAPHY C1326
New mammography room with equipment, casework, accessories, & finishes
KAISER POINT WEST - MAMMOGRAM - C1335
Development of new mammography room located on 1st floor
Kaiser Point West Medical Office Building
Remove and replace three roll-down fire doors Revision COM-1816780 to change weld to bolt on all doors. Revision-COM-1821352 fire never did review adding fire card to original permit fees paid on revision
Chilled Water System
Chilled water system: Install new primary pump, secondary pump, pump headers, flow meter, chiller isolation valves, DP sensor, emergency chiller water connections, control, Heating water system: Install two minimum flow bypass valves, flow meter, controls. Electrical pump power, emergency chiller power.
Kaiser Parking & Landscape Improvements
Site improvements to provide additional parking and replace existing landscaping with drought tolerant planting. - PLNG-INSP
KAISER REMODEL SUITE 15
EXPEDITED - SUITE 15 REMODEL TO IMPROVE PHARMACY SECURITY, LIFESAFETY STRUCTURAL AND ELECTRICAL NON SPRINKLERED BUILDING.
Kaiser Barrier Removal
Accessibility upgrade replace existing built-in casework with ergonomic workstations within the 2nd pediatric department of the medical office building. SEE Revision COM-1806055 : Light Fixture & Printer Location Clarification for their new circuit
REVISION TO COM-1616445, REVISED ELECTRICAL & CASEWORK
EXPEDITED - REVISION TO COM-1616445, REVISED ELECTRICAL & CASEWORK ALTERATIONS TO ADD (2) INTELLICAB UNITS
Pharmacy-9 New Intellicabs
EXPEDITED - Modifications to existing wall, casework, power/data and floor finishes within the first floor pharmacy of the medical office building to accommodate 9 new intellicabs. SEE COM-1701671 FOR REVISED ELECTRICAL AND CASEWORK
KAISER PERMANENTE
Fab and install two new monument signs.
LIGHTING REMODEL
EXPEDITED - REPLACE EXISTING OB/GYN PROCEDURE LIGHT AND 2X4 LIGHTS IN (2) OB/GYN PROCEDURE ROOMS.
Interior Remodel
EPC - Interior remodel at optical sales area. Remove existing interior security gate and install new interior store front system
Electrical Only
EXPEDITED - Install 1 new electric power pole to modular furniture with 2 new 120 V, 20 A circuits.
Interior Remodel
Interior remodel Imaging department. Remodel to convert office space into (2) densitometry exam rooms.